• 제목/요약/키워드: Construction manager/general contractor

검색결과 7건 처리시간 0.024초

Profession and strategy of BIM managers in Japan

  • Kaneta, Takashi
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.167-175
    • /
    • 2017
  • Building Information Modeling (BIM) comes to be implemented into architectural design, construction, and maintenance in Japan in order to convert design information thoughout a construction project. However, various problems are taking place in data transaction. It is not also clear about the role and the responsibility of the architects and the enginners in charge.There is a movement to establish a BIM manager as a general coordinator concerning BIM in Singapore and other countries, though it is not yet popular in Japan. This paper deals a BIM manager as a new profession in a construction project. The function and skills necessary to a BIM manager is analyzed, and the strategy of Japanese general contractors is discussed. General contractors from Japan are operating BIM in Singapore compatible with open system of supply chain. This style is different from the one in Japan even they belong to the same company. In this paper it is analyzed based on the survey in detail.

  • PDF

국내 건설공사 현장의 하도급관리 개선방안 - 하도급자의 품질업무 전문화를 통하여 (A Improvement of Sub-contractor Management in Domestic Building Construction Sites - Through Specialized Quality Work of Sub-contractors)

  • 손현덕;이재섭
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.292-295
    • /
    • 2002
  • 하도급관리는 하도급업체를 전문화, 계열화하여 성공적인 건설프로젝트를 수행하는데 있다. 품질관리에서 하도급관리는 하도급업체의 ISO9000시리즈의 품질시스템의 도입에서 그치는 것이 아니라 활성화가 이루어질 수 있도록 하여 효율화를 기하고 체질 개선을 하는 것이 필요하다. 따라서 본 연구에서는 하도급자가 ISO9000시리즈의 풀질시스템을 유지하는데 저해 요인을 TQM(Total Quality Management)의 개념을 응용한 설문조사로 분석하여, 개선을 위하여 하도급관리자인 원사업자의 역할을 모색해 보았다.

  • PDF

Construction Partnering on Alternative Project Delivery Methods: A Case Study of Construction Manager/General Contractor Partnered Transportation Projects

  • Adamtey, Simon A.;Kereri, James O.
    • Journal of Construction Engineering and Project Management
    • /
    • 제9권4호
    • /
    • pp.1-15
    • /
    • 2019
  • Since its adoption by the transportation sector in the early 1990s, partnering has been broadly used with the traditional delivery method by many agencies with significant reported benefits. During the same era, a number of transportation agencies (DOTs) started experimenting with a wide variety of alternative project delivery methods (APDMs) aimed at improving the delivery of highway construction projects. The effect of collaborative working strategies such as partnering, together with the APDMs have become somehow interrelated posing a potential challenge on how to effectively integrate partnering as a concept in the APDMs. The salient question has been if the collaborative nature of these APDMs has affected how partnering is being used by state DOTs. Through an extensive literature review, analysis of 32 CMGC RFPs/RFQs and review of three CMGC case studies, the study found that there is limited information in state DOT documents that show procedures on the usage of partnering with CMGC projects. Majority of DOTs are relying on the inherent nature of the CMGC contract to promote healthy collaborative practices and there is the need to consider partnering during preconstruction and construction separately to cater for any personnel change over. The study also revealed that partnering may become less important at the construction phase due to overlap between partnering and CMGC practices. In support of this finding, a CMGC partnering model was developed that can be adopted by DOTs. This paper contributes to both research and practice by expanding the existing knowledge on partnering on APDMs.

A Comparative Analysis of Integrated Project Delivery in Construction Versus Traditional Methods

  • Peressini, Anthony;Bristow, James;Motahari, Mahmoud;Karakouzian, Moses
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.669-677
    • /
    • 2022
  • In this paper, different types of traditional project delivery methods in the construction industry were explored and a comparative analysis against Integrated Project Delivery (IPD) were performed. The advantages of IPD method for all parties, owner/engineer/architect/general contractor, were explored by reviewing the most recent literature. The literature suggests that IPD method should be the dominating project delivery method and diluting the conventional methods such as Design-Bid-Build due to more collaborative and mutually beneficial ways of doing construction; IPD is newer and a more comprehensive method to capture the intrinsic values of project collaboration. This paper presents a comparison of the commonly used methods of project delivery, Design-bid-build, CMAR, & Design-Build and addresses their advantages and disadvantages in differing project scopes and sizes. Several industry leaders with experience in the four types of project delivery addressed were surveyed. The survey results show an overwhelming desire for future projects to go toward IPD from the contractor/owner/RDP. The biggest obstacle facing a project from using IPD appears to be trust.

  • PDF

THE KEY SUCCESS VEHICLES FOR FAST-TRACK IN PUBLIC DESIGNBUILD PROJECTS

  • Kyu-Man Cho;Kyo-Jin Koo;Chang-Taek Hyun
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.1094-1099
    • /
    • 2005
  • Nowadays the Design-Build Delivery Method in public sector has been remarkably grown up in applying owing to its merits such as shortening construction duration. The Fast-Track is the wide-using method for accelerating schedule at Design-Build projects. But the public agency is in trouble to execute Fast-Track because of the lack of guideline for its process. As a result, in some cases applying Fast-Track methods, cost and construction duration are increased more than cases of non-Fast-Track projects. In this study, through the questionnaire surveys to professionals having actual implementation experiences as a construction manager, owner or general contractor, key success vehicles of Fast-Track are induced.

  • PDF

시공단계 위험요소 분류체계 구축을 통한 건설 프로젝트 관리모듈 개발에 관한 연구 (Study on Development of Construction Management Module based on Risk factor classification system at Construction Phase)

  • 이주성;문성곤;전영진;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.199-202
    • /
    • 2009
  • Turn-key and CMF(CM for Fee) have been selected as procurement paths of large public projects in Korea. However, recently, researches and discussions on CMR(CM at Risk) have been popular as the Korean government seeks for alternative procurement paths to enhance the performance. In the CMR projects, the part who is responsible for construction management should predict and control the potential risks for guaranteeing benefits. In this research, CMR projects in which a general contractor plays the role as CMr is mainly analyzed. We give attentions to risk management during construction process given that subcontractors, main parts in this phase, work in various ways and thus more chances for faults exist. In this case, CMr manages risks to control the procedure of project. So, potential risk factors can constitute the database, and that database can be matched to following activity. And construction manager can forecast measures of risk using the result of matching. This chain of activities increase efficiency in roles of CMr on CMR(CM at Risk). Furthermore this study will propose one of the solution of Construction Management Module.

  • PDF

잠수기능장 제도 신설을 위한 산업 잠수 국가자격체계 분석 (Analysis of the commercial diving national qualification system for the introduction of a diving supervisor)

  • 심경보;차주홍;강신영
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제40권7호
    • /
    • pp.655-662
    • /
    • 2016
  • 본 연구에서는 산업 잠수 분야의 현장 책임자 겸 관리 감독자 역할을 할 수 있는 잠수기능장 직책을 국가자격제도로 도입할 것을 제안하였다. 이를 위해 수중전문건설업체 현황, 산업 잠수 장비 운용 실태, 잠수사 근로시간, 인력 수급 현황, 수중전문건설업 시장 현황 등 산업 잠수 분야의 전반적인 현황을 조사하였고, 국가자격체계와 NCS(National Competency Standards) 체계를 분석하여 잠수기능장의 직무 정의와 범위를 도출하였다. 그 결과 산업 잠수 분야의 잠수기능장 자격은 '산업 잠수에 관한 최상급 숙련 기능을 가지고 산업현장에서 공정관리, 소속 기능 인력의 지도 및 감독, 현장교육, 사업주와 기능 인력을 유기적으로 연계시켜주는 현장 관리자로서의 역할을 수행하는 직무'로 정의하고, 잠수기능장의 직무 내용은 '잠수계획수립 및 잠수팀 운영', '표면공급식 공기 혼합기체잠수', '기압조절실 운용', '수중토목', '해난구조' 로 구성하도록 제안하였다. 이 종목이 도입되면 그 동안 관련 분야 종사자들 사이에서 이슈가 되어 왔던 경력 개발을 비롯하여 직급의 관리 감독 등 많은 문제점들을 해소할 수 있을 것으로 기대된다.