Classifying Management Tasks to Improve PC Construction Management System (PC공사 관리체계 개선을 위한 주요 관리업무 분류)

  • Mun, Seong-Hwan;Kim, Taehoon;Cho, Kyuman
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.177-178
    • /
    • 2020
  • In the construction industry, expectations for the Precast Concrete(PC) construction method are rising due to demands for high quality and productivity and social and environmental issues. However, although technical problems that occurred in the early stages of technology introduction have been solved, research related to proper construction management for PC construction methods has been relatively neglected and the advantages of PC construction methods have not been fully utilized. In this study, each group involved in PC works was surveyed to identify important management tasks affecting productivity of PC works to improve PC contruction management system. Based on factor analysis, 22 tasks were calssified into 5 management groups. The results of this study will be used to present a framework for the application of automation and information technology to improve the productivity of PC works.

  • PDF

Process Interference Management for Finish Works using Mobile Technology (모바일 기술을 이용한 마감공사의 작업간섭 관리)

  • Ko, Yong-Ho;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.35-36
    • /
    • 2017
  • The finish works of construction projects comprises approximately 40% of the total construction duration. Thus, the management of finish works have as big as impacts on total project duration as the earthworks, foundation and structure works. Process interference management is considered one of the most important issues dealt during finish works. However, it was investigated that effective management systems have yet not been applied for practical use. Accordingly, this paper suggests a mobile technology based finish works management system that mainly focuses on preventing process interference occurred due to ineffective communication between general and sub-contractors.

  • PDF

EVALUATING PRODUCTIVITY-AFFECTING FACTORS ON FINISHING WORKS IN HIGH-RISE HOUSING CONSTRUCTION

  • Chi-Joo Lee;Jae-Jun Kim;In-Suk Park;Sang-Hyo Lee;Yoon-Sun Lee
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.398-406
    • /
    • 2007
  • Constructing high buildings is a global trend, and skyscrapers for residing are also increasing. But a period of works for finish construction is different depending on a company while a period of works for frame construction of skyscrapers for residing in the country is regular when considering a difference of a method of construction, and the increase of repeated construction for high buildings and number of related process for finish construction are stressing the importance of improving productivity through construction management and plan for works. Because there are many compositive factors affecting productivity other than technical factors, we should intensively study the way of improvement and prevention preferentially through analyzing factors affecting productivity. So in this study, we present important management factors for making systematic strategy and plan for improvement of productivity by finding factors affecting productivity depending on the degree of importance unifying factors affecting productivity of plan factor(internal factor of construction process) and management factor(outer factor of construction process).

  • PDF

Study on the Maintenance and Management using DB Program of Inspection Data for Tunnel (터널의 진단자료 DB화에 의한 유지관리 연구)

  • Lee, Song;Shim, Min-Bo
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.503-510
    • /
    • 2000
  • Recently, many kinds of research has been actively developing for a standardization and information related to the construction works. These works include the general field of design, construction, supervision, maintenance and management on facilities. The works of database construction for a standardization and information were chiefly propelled centering around the present conditions related to the design, construction work. The field related to maintenance and management on facilities lags behind in the works of database construction. The establishment of standard classification system(SCS) on facilities and inspection data is most important among the things related to maintenance and management to have a efficiently maintenance and management. This paper suggests SCS on facilities and inspection data according to that of facilities. On the basis of SCS of facilities and inspection data, code work with classification system and input work for a data of maintenance and management was practised. The purpose of this paper is to suggest a kind of statistics data and investigate a characteristics of inspection using statistic data on tunnel structures

  • PDF

Development of Support System in Preparing Placing Drawings for the Improvement of Efficiency of Reinforcing Steel Works

  • Hyeon-Yong Park;Tai-Kyoung Kang;Yoo-Sub Lee;Hun-Hee Cho;U-Yeol Park;Hyun-Oak Jung;Kyo-Sun Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1370-1376
    • /
    • 2009
  • Reinforcing steel works should be carefully controlled by the construction manager considering the severe fluctuation of the price of reinforcing steel bars and for the safety of structure in building constructions. In particular, preparing rebar placing drawings needs more effort and time than before because of the emergence of higher and more complicated buildings. Moreover, the experience of field engineers or foremen (fabricators or detailers) in preparing placing drawings gives rise to the differences in fabricated bar type and quantity of bars used. To address these problems, this study proposed the support system in preparing placing drawings for reinforcing steel works efficiency. In the near future, if this system can be made available on the web, multiple end-users will be able to share the result; the efficiency of rebar supply chain management will also be improved.

  • PDF

PROPOSING MANAGEMENT OF WORK PRIORITY TO REDUCE CONSTRUCTION FAILURE CLAIMS

  • In-ho Kim;Moon-Seo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1171-1176
    • /
    • 2005
  • Dispute related to construction projects involving numerous persons is one of the biggest challenges faced by contractors today. It costs a substantial amount of money and time in resolving these kinds of claims. Recently, with the changes in the construction environment and thought of relation with owner, the number of construction claims has increased. But, a majority of these claims do not prevail, and in fact, frequently get dismissed in its entirety. The reasons for such dismissals include the ignorance about the claims, lack of clear and convincing evidence, and so on. But most of reasons are the claims are not managed well on construction process. This paper analyzes the failure causes by relying on past claim failure cases, and then drew works that have connection with failure causes through interview. It also presented importance degree of construction management works.

  • PDF

Safety Management Information System in Plants Construction Work (플랜트 건설공사의 안전관리 정보시스템 개발)

  • Park, Jong-Keun
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.4
    • /
    • pp.23-29
    • /
    • 2012
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as appurtenant works, temporary works, structural works, equipment work, finishing work and etc based on accident examples and investigation on actual condition in plants construction work. In addition, the safety management system was developed to perform risk assessment of plants construction and use it for effective safety training for labor.

Development of Construction Project Management System Applicable to Earth-Work Field (토공 현장관리 중심의 시공관리시스템 개발에 관한 연구)

  • Kwon, Oh-Yong;Jo, Jae-Ik;Kim, Do-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.301-304
    • /
    • 2008
  • The purpose of this study is to embody the integrated working management system for public works, focused on the management of surplus soil at a field of public works. The contents and results of this study can be classified into the design of working management DB for public works and the embodiment of working management DB. First, the design of working management DB for public works consists of three DBs - process management to analyze work plan and performance. for backhoe loader, working management and resources management for equipment and labor management - in connection with work and resources classification system. Secondly, the working management system for public works can describe work plan and performance on a floor plan using graphic. Based on this, the status of process and progress report with visual expression had been developed to facilitate the communications and performance of duties among staff in charge at the field of public works. This study is a specialized system for a company specializing in public works and a system that can be put into practical use if practicality is proved through test-bed with regard to business.

  • PDF

Safety Management Information System in Roads Construction Work (도로 건설공사의 안전관리정보시스템 개발)

  • Park, Jong-Keun
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.2
    • /
    • pp.72-77
    • /
    • 2012
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as earth works, drainage works, pavement works, appurtenant works and etc based on accident examples and investigation on actual condition in roads construction work. In addition, the safety management system was developed to perform risk assessment of construction and use it for effective safety training for labor.

A Study on the ISO 9001 Application of Railway Supervision work (철도 감리 업무의 ISO 9001 적용에 대한 고찰)

  • Jang Seog-Jae;Hwang In-Bum;Sung Jung-Hwa;Kim Hae-Seok
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.3 s.34
    • /
    • pp.325-329
    • /
    • 2006
  • Quite a few of persons often fall into an error that ISO has happened an additional work at construction sites. Supervision works, however, are carried out in compliance with 'Guidelines for the Supervision Works' which is including most ISO Requirements. Additional requirements needed for the supervision works are not many. This study has studied on the ISO application of supervision works in relation to, 1) ISO 9001 & KS A 9001 Quality Management System Basic Model, 2) The Process of Railway Construction Work Supervision Quality Management Plan, 3) Supervision Work Performance Guide Book(2005) & KS A 9001(2001) Standard, at the railway construction sites.