Influence Factors and Management based on Phase of Building Construction for the Improvement of Post Occupancy Indoor Air Quality

  • Lim, Hyoung-Chul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.6
    • /
    • pp.576-586
    • /
    • 2011
  • In recent years, pollution in residential spaces has been a significant area of concern. In particular, the indoor air quality (IAQ) of an apartment building before occupancy, which is related to the interior material, is a serious problem. Unlike previous research, which has mainly focused on pollution control after construction, this study has derived influencing factors and priority of management with a controlling schedule for IAQ. The objectives of this research are 1) control of schedule or improvement of management for IAQ, 2) distribution of responsibility to the parties concerned (factory, material company, construction company, design and engineering, occupancy). The results show the relative priority of the four major items in wall?based apartment buildings and in column?based apartment buildings. An analysis of the parties responsible for improvement based on the IAQ results shows more efforts to improve IAQ are needed in material factories and engineering/design companies.

Work Time Analysis of Rebar Fabrication Method in Beam Construction. (보 철근공사 조립공법별 작업시간분석)

  • Kim, Ju-Yong;Kim, Min-Ku;Kim, Young-Kil;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.8-9
    • /
    • 2019
  • The rebar work is a labor intensive construction work with a high labor cost ratio. It is difficult to manage the productivity, construction time, and safety of rebar work. The problem of productivity decreased in rebar construction is due to a lack of workers according to the aged workers. Partial prefabrication rebar can be an alternative solution to productivity decreased in rebar work. The characteristic of partial prefabrication method is that time consuming component such as stirrup of beam assemble in factory and others assemble in site. Therefore, in this study, the time required for each rebar assembly method is measured and analyzed to confirm the possibility of productivity improvement.

  • PDF

Basic study for development of bottom-up infill module for high rise building (고층 건축물을 위한 bottom-up Infill module 개발 기초 연구)

  • Sung, Soojin;Lim, Chaeyeon;Na, Youngju;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.164-165
    • /
    • 2015
  • Modular construction technique is an adaptation of factory-based mass production concept in ordinary manufacturing industries to construction industry and it assumes that panels, units, etc. are fabricated in factories and assembled in construction sites. Given its structural limitations, modular construction technique is primarily used in low-story buildings whose maximum height is usually five stories, but researchers are actively studying possible adaptation of modular construction technique to high-rise building designs these days as in the case of infill-type modular construction design. Infill-type modular construction technique, most frequently used in high-rise building construction projects, completes frame construction first in reinforced concrete structures and fills unit modules in such structures. However, infill-type modular construction technique leads to longer construction schedule accompanying increase in construction cost, cost overrun due to additional of temporary work, and possible damage to units in the wake of facility construction. Accordingly, this study is performed as a basic study for the development of bottom-up infill-type modular construction technique intended to construct structural frames and fill in units sequentially in a bid to address such drawbacks of current infill-type modular construction technique.

  • PDF

Economic Analysis on the Automation System of the Cultivation Process in the Plant Factory (식물공장 재배 공정 자동화 시스템의 경제성 분석)

  • Jung, Mincheol;Kim, Handon;Kim, Jimin;Choi, Jeongmin;Jang, Hyounseung;Jo, Soun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.4
    • /
    • pp.57-64
    • /
    • 2022
  • A plant factory is a facility that creates an artificial environment in a controlled space and produces plants systematically through automated facilities. However, automation in the cultivation process is insufficient compared to the internal environment control technology in plant factories. This causes the problem of an increase in operating costs due to the input of a large number of workers. Therefore, this study aims to evaluate economic feasibility by comparing before and after introducing automation in the cultivation process of plant factories. The target plant factory to be analyzed was selected, and the break-even point analysis method was used by comparing the cost required compared to the operating period. As a result, the break-even point was analyzed to be 3.4 years when automation was introduced into six processes for plant cultivation. Therefore, it can be judged that the introduction of automation is excellent in terms of economic feasibility when the target plant factory has been operated for more than 3.4 years. This study is expected to be used as basic data to analyze the economic feasibility of introducing automation in domestic and foreign plant factories.

Fire Resistant Regulation Status and Activation Plan of Domestic Modular Construction (국내 모듈러 건축의 내화구조 제도 현황 및 활성화 방안)

  • Choi, Yun-Jeong;An, Jae-Hong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.6
    • /
    • pp.673-680
    • /
    • 2022
  • Modular construction is recognized as a construction method with various advantages, such as shortening the construction duration, achieving quality control through factory production, ease of maintenance, and reduced construction costs due to reduced weight of materials. However, despite efforts by the modular industry and government to activate modular construction, it has rarely been established in the domestic market. Currently, there are technical limitations to the modular construction fire resisting technology applied to general buildings. The lack of access to modular construction fire resistance regulation is considered a major factor. In this study, the current status and problems with modular construction fire resistance regulation, a significant hindrance factor, were considered to activate modular construction. This study is intended to present a direction for institutional improvement in modular construction fire resistance and a direction for research and development.

Development of Time-Cost Trade-Off Algorithm for JIT System of Prefabricated Girder Bridges (Nodular GIrder) (프리팹 교량 거더 (노듈러 거더)의 적시 시공을 위한 공기-비용 알고리즘 개발)

  • Kim, Dae-Young;Chung, Taewon;Kim, Rang-Gyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.12-19
    • /
    • 2023
  • In the case of the construction industry, the relationship between process and cost should be appropriately distributed so that the finished product can be delivered at the minimum fee within the construction period. At that time, it should be considered the size of the bridge, the construction method, the environment and production capacity of the factory, and the transport distance. However, due to various reasons that occur during the construction period, problems such as construction delay, construction cost increase, and quality and reliability degradation occur. Therefore, a systematic and scientific construction technique and process management technology are needed to break away from the conventional method. The prefab(Pre-Fabrication) is a representative OSC (Off-Site Construction) method manufactured in a factory and constructed onsite. This study develops a resource and process plan optimization system for the process management of the Nodular girder, a prefab bridge girder. A simulation algorithm develops to automatically test various variables in the personnel equipment mobilization plan to derive the optimal value. And, the algorithm was applied to the Paju-Pocheon Expressway Construction (Section 3) Dohwa 4 Bridge under construction, and the results compare. Based on construction work standard product calculation, actual input manpower, equipment type, and quantity were applied to the Activity Card, and the amount of work by quantity counting, resource planning, and resource requirements was reflected. In the future, we plan to improve the accuracy of the program by applying forecasting techniques including various field data.

A Historical Study on the Specifications of Traditional Handmade Roof-tile (전통수제기와 규격에 관한 고증 연구)

  • Jo, Sang-Sun
    • Journal of architectural history
    • /
    • v.23 no.6
    • /
    • pp.21-26
    • /
    • 2014
  • The purpose of this study is to retrospect the establishment process of specification of modern factory-made traditional Korean roof-tile. Its another purpose is to analyze the specification of watong(瓦桶, a wooden molding frame for roof tile making) which is recorded in the literature of Joseon dynasty. The results of this study are as follows. : First, the specification of modern factory-made Korean roof-tile that currently used was established in 1978. And it did not succeed old traditional specification. Second, in case of construction or repair of main building of palace, it was a principle to use Daewa(大瓦, the big size roof-tile). And Sangwa(常瓦, the ordinary size roof-tile) was used when needed. Also, Jungwa(中瓦, the middle size roof-tile) was used regardless of the size of group building. And Sowa(小瓦, the small size roof-tile) was used in house and wall of royal tomb. Third, it is needed to establish a specification of traditional handmade roof-tile based on the specification of watong through research of the litterateur. So, a standard draft for this was proposed. Finally, one can find the significance that this study has tried to find a specification of traditional roof-tile that can be applied to construction or repair of cultural heritage.

DESIGN OF FLUIDIZED BED DRYER OF THE SUPER CEREAL PLANT (쌀밀 제조공장의 유동층건조장치설계)

  • Shik Namkoong;Kang, Chung-Gyu;Chung, Chull-Hae;Kang, Chong-Min
    • Microbiology and Biotechnology Letters
    • /
    • v.1 no.1
    • /
    • pp.59-65
    • /
    • 1973
  • The details of design procedure, practically used for the construction of fluidized bed dryer system of the Super Cereal Plant of 250, y capacity were presented. The plant was in its entirety designed and constructed solely by domestic engineering potenality with local construction materials. In the drying process, the water content of cooked kernel of wheat is reduced from about 23% to about 14% and the conversion of starch contained in the endosperm to ${\alpha}$-starch is to be completed by contacting with hot combustion gas of kerosene at about 90-130$^{\circ}C$.

  • PDF

A Study on the Utilization of Retired Professionals for SME's Smart Factory Construction: Focusing on the Mediating Effect of Smart Meister Competence (중소기업의 스마트팩토리 구축을 위한 퇴직전문인력 활용에 관한 연구: 스마트 마이스터 역량의 매개효과를 중심으로)

  • Koo, Il Seob
    • Journal of the Korea Safety Management & Science
    • /
    • v.23 no.4
    • /
    • pp.83-92
    • /
    • 2021
  • The construction of smart factories for government SMEs is not easy due to the lack of professional manpower. The use of retired professionals is a way to solve the problem to some extent and to solve the job problem of seniors by effectively utilizing social assets. This study examines the effectiveness of using Meister based on a survey of 195 companies participating in the Smart Meister Support Program. As a result, the better pre-participation readiness and the better management and coordination of change during the participation, the more significant influence was on Meister's ability development and corporate performance. In particular, it was confirmed that Meister's competence plays a role in both 'pre-participation readiness and business performance' and 'between change management during participation and business performance'. In order to improve the performance of the smart meister business in the future, it is necessary to proactively promote the purpose and purpose of the business targeting companies that wish to participate in the business. In addition, it was found that it is necessary to support the development of change management in order to minimize the resistance to innovation during the project. It will be possible to enhance social competitiveness by resolving senior jobs and strengthening the competitiveness of SMEs by discovering and utilizing Meister, who is an expert among retirees.