A Case Study of the Construction of Smart Factory in a Small Quantity Batch Production System: Focused on IDIS Company (다품종 소량 생산 체제의 스마트 공장 구축 사례: (주) IDIS를 중심으로)

  • Oh, sea-nam;Park, won-chul;Riew, Moon Charn;Lee, Min Koo
    • Journal of Korean Society for Quality Management
    • /
    • v.46 no.1
    • /
    • pp.11-26
    • /
    • 2018
  • Purpose: This study is to help the construction of smart factories of other manufacturing enterprises through IDIS 's case of smart factory construction. Methods: We introduce the four phases of implementing smart factory building by IDIS company, which produces a small quantity of multi-odd units. Results: Through the smart factory construction, the cost of product is reduced due to the improvement of total productivity such as office work, production work, and energy saving, and sales are enhanced by customized production, quality / delivery reliability improvement. Conclusion: We present the actual examples needed to build the manufacturer's smart factory.

A Study on Big Data Analytics Services and Standardization for Smart Manufacturing Innovation

  • Kim, Cheolrim;Kim, Seungcheon
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.14 no.3
    • /
    • pp.91-100
    • /
    • 2022
  • Major developed countries are seriously considering smart factories to increase their manufacturing competitiveness. Smart factory is a customized factory that incorporates ICT in the entire process from product planning to design, distribution and sales. This can reduce production costs and respond flexibly to the consumer market. The smart factory converts physical signals into digital signals, connects machines, parts, factories, manufacturing processes, people, and supply chain partners in the factory to each other, and uses the collected data to enable the smart factory platform to operate intelligently. Enhancing personalized value is the key. Therefore, it can be said that the success or failure of a smart factory depends on whether big data is secured and utilized. Standardized communication and collaboration are required to smoothly acquire big data inside and outside the factory in the smart factory, and the use of big data can be maximized through big data analysis. This study examines big data analysis and standardization in smart factory. Manufacturing innovation by country, smart factory construction framework, smart factory implementation key elements, big data analysis and visualization, etc. will be reviewed first. Through this, we propose services such as big data infrastructure construction process, big data platform components, big data modeling, big data quality management components, big data standardization, and big data implementation consulting that can be suggested when building big data infrastructure in smart factories. It is expected that this proposal can be a guide for building big data infrastructure for companies that want to introduce a smart factory.

Development of Project Delivery System for Modular Building in Korea

  • Nam, Sung-hoon;Kim, Kyung-rai;Lee, Dong-gun;Heo, So-young
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.704-705
    • /
    • 2015
  • Recent research has been ongoing for modular buildings in the country, and interest increases. However, in accordance with legal restrictions in the country with regard to Project Delivery system of Modular Building, the activation of modular buildings industry is obstructed. In Korea, in accordance with national contract law, the construction contract is apply to the project delivery system of modular buildings, and in accordance with Framework Act on the Construction Industry, The project delivery system of modular buildings has to be a separate order. The definition of separate order in contract as defined in the law is that the electric work and Communication work and digestion facility work has to be separate each contract in order to be ensured professionalism. In accordance with law, the project delivery system of modular buildings is that the contract for construction is concluded with the Owner and the Construction Contractor and the contract for goods is concluded with the construction Contractor and modular manufacturer. Due to these project delivery system, the domestic factory production rate when making a modular unit is significantly reduced compared to the rate of factory production abroad and the domestic factory production rate is estimated to 10-20%. Due to the factory production rate is also low, despite what can be done at the factory the workload in construction field increases. According to the workload in field increases, the effect of the schedule reduction can be reduced. It resolved to form a consortium with a modular manufacturer and construction companies or the contract is concluded with Owner, modular manufacturer and construction companies in each. In this paper, we propose a specific project delivery system for modular building to solve the problem of the low factory production rate and the problem of schedule reduction. Through this paper, due to the variety of project delivery system on modular buildings is expected to contribute to the activation of modular buildings.

  • PDF

Aimsak Ochang Factory (아임삭 오창 공장)

  • Shin, Chun-Gyu
    • Korean Architects
    • /
    • no.7 s.459
    • /
    • pp.48-53
    • /
    • 2007
  • Amisak is a rechargeable tool company and is aiming to be a leading company in Korea by 2010. Ochang factory will be a base for this aim. Client's bad experience in construction of their first Suwon factory and my regretable memory of 1996 design & construction of BTC factory in Whasung lead us to desire for an outstandingly good factory. Total floor area is about 5,000 square. meter (1,500 py) and it has been designed with 3 different facilities, Factory (steel structure, 2 levels), Office (RC structure, 3 levels), and Welfare (RC structure, 3 levels including basement). Factory area is expected to expand its facility at the rear end within 3 to 5 years. Aimsak Ochang factory is expected to be completed in December 2007.

  • PDF

A Study on Safety Validation of Climbing Hydraulic Robot System for Automation in Construction (시공자동화를 위한 크라이밍 유압로봇의 안정성에 관한 연구)

  • Lee, Myung-Do;Choi, Hee-Bok;Lee, Kyu-Won;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.15-19
    • /
    • 2009
  • As robotic technologies have become more actively utilized to automate many construction tasks, they have been able to improve the construction productivity, quality, and workers safety on site. A new system, of which Robot-based Construction Automation (RCA), is currently being developed, and RCA systems consist of Construction Factory(CF), Automated Bolting Robots, and Climbing Hydraulic Robot. Especially. Climbing Hydraulic robot system is very important to RCA systems because of function as lifting the Construction Factory. In this paper, We validate safety of Climbing Hydraulic Robot system before application for real building construction.

  • PDF

Development of Sliding Roof System for High-rise Construction Factory Using Quality Function Deployment (품질기능전개를 이용한 고층건물 건설공장 구조체의 개폐식 지붕 시스템 개발)

  • Kim, Chang-Won;Kim, Baek-Joong;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.131-132
    • /
    • 2011
  • Non-working days owing to climatic factors have been negatively affected in productivity of construction, such as delays of project completion times, decrease productivity of construction. Especially non-working days of steel erection work is about 58 days, it is influenced deleteriously to estimating uncertain construction duration. To solve this problem, Construction Factory(CF) and sliding roof system installed CF's upper side are developed in korea recently. This study is proposed the design of sliding roof system through assess relation of requirements and technical characteristics using Quality Function Deployment(QFD). The basis data for applying QFD is collected from literature reviews and questionnaires/interviews targeting system developer, experts and researchers.

  • PDF

A Study on the Development of Construction Production Rates System for Estimating Proper Construction Expenses of Off-Site Construction (OSC) Based PC Structure Factory-Built Assembly (OSC기반 PC구조 공장제작 적정 공사비 산정을 위한 품셈체계 개발 연구)

  • Lee, Jeongwook;Lee, Hansoo;Lee, Chiho;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.89-100
    • /
    • 2022
  • The development of the Construction Production Rates System for appropriate construction cost calculation has recently come to the fore as a means of invigorating OSC based PC structure which currently needs institutional frameworks. PC structure based construction expenses consist of the factory-built assembly, transportation and on-site installation. Recently, in the field of transportation and site installation, research on product structure development is being conducted, such as presenting the standard product calculation system reflecting the results of field survey for each subsidiary materials (Lee et al., 2021). On the other hand, there is no ongoing research on estimating construction expenses of Factory-built assembly. This study suggests Construction Production Rates System which can be used for PC subsidiary materials based Factory-built assembly cost estimations. For the research, work types for the construction procedures have been categorized, and the standard input manpower suitable for the corresponding work characteristics has been derived from analyzing the associated Construction Standard Production Rates for each work type. Also, as the research referred PC subsidiary materials (such as columns, beams, walls, and slab, as well as on-site installation) and the standard number of workforce based on work types, one can calculate direct labor cost, using what the research shows. In addition, it suggests that the size of individual subsidiary materials be the extra cost factor, by using the characteristics that productivity changes depending on the size(m3) of subsidiary materials. It is expected that the research can contribute to objectively verifying factory-built assembly cost through of PC structure, which currently relies on estimates.

Development of CITIS Model and Analysis of Its functionality as a Collaborative Virtual Factory for Construction Projects (건설프로젝트의 협업적 가상기업으로서의 CITIS 모델개발 및 성능분석에 관한 연구)

  • Han Seung Heun;Chin Kyung Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.87-98
    • /
    • 2002
  • Korea government is making an effort to improve the efficiency in construction industry by introducing CITIS (Contractor integrated Technical Information Service). In order to provide a base for the application of CITIS into the construction industry, this research provides a concept of virtual factory which should be incorporated into CITIS system for the successful collaborative work in the virtual space. It then implements a prototype system through process and data modeling to apply into the road construction projects. The prototype system is tested to verify its efficiency. Finally, lesson learned from these works is provided to advance the current CITIS toward a collaborative virtual factory.

Enhancing Productivity and Quality in Korean Modular Housing through Smart Factory Integration

  • Youngwoo, KIM;Sunju, KIM
    • The Journal of Economics, Marketing and Management
    • /
    • v.12 no.4
    • /
    • pp.13-25
    • /
    • 2024
  • Purpose: Korea's construction industry has faced declining productivity and quality issues due to labor-intensive onsite construction and variables like weather, material price fluctuations, and labor shortages. The modular housing industry, introduced in Korea in 2003, offered benefits like reduced construction time and enhanced productivity through offsite manufacturing. However, its adoption remains limited due to high costs, quality concerns, and low consumer acceptance. Research Design, Data, and Methodology: This study explores the feasibility and impact of implementing smart factory technologies in the modular housing industry to overcome these barriers. Using survey data from 179 construction industry experts, the study employs frequency and regression analysis to identify key factors influencing the adoption of modular housing and the effectiveness of smart factories. Findings suggest that government-led educational programs and strong policy support are essential for successful implementation, enhancing productivity, reducing costs, and improving quality. Conclusions: The study emphasizes the need for standardization of modular housing, deregulation of relevant laws, and increased public awareness to stimulate market growth and innovation. Policy recommendations include financial support for modular manufacturers transitioning to smart factories, ensuring stable supply volumes, and promoting the benefits of modular housing to consumers. Integrating smart factory technologies can lead to significant advancements in the modular housing industry, contributing to the sustainable development and modernization of Korea's construction sector.

Development of Construction Factory for Automated Building Construction System (건축물 시공 자동화 시스템 구축을 위한 건설공장 구조체 개발)

  • Kim, Tae-Hoon;Shin, Yoon-Seok;Cho, Hun-Hee;Kang, Kyung-In;Park, Kwi-Tae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.163-169
    • /
    • 2008
  • The application of robot technology on construction sites is recognized an effective solution to the problems caused by labor shortage on the construction industry, and relevant studies are being carried out increasingly. Automatic construction system for frames of high-rise building was developed in Japan in 1990's. Practical use o F the system, however, was failed due to inefficiency Now, we are developing economic and practical automatic construction system that is lighter and suitable for building construction In Korea. This study has discussed developing the system of construction factory and climbing control system, which is the core technology of the automatic construction system in Korea.