• Title/Summary/Keyword: Construction equipment assembly line

Search Result 10, Processing Time 0.024 seconds

Development of Scheduling System for Production of the Hydraulic Control Valve of Construction Equipment (건설기계 유압밸브 생산을 위한 일정계획 시스템 개발)

  • Kim, Ki-Dong;Lee, Bo-Hurn
    • Journal of Industrial Technology
    • /
    • v.27 no.A
    • /
    • pp.61-67
    • /
    • 2007
  • The construction machine is the composite machine assembled by about 30,000 parts. Excavator, one kind of a construction machine, plays the leading role for export of construction equipment. It is generally impossible to produce all of the items within one company. Especially the supply of hydraulic control valves, one of the core part of the construction equipment, depends on the import heavily. So it is important to make an efficient production plan of hydraulic control valves in the company. The most important thing for the production scheduling of a hydraulic control valve is to make production schedule keeping the start date for assembly line for an excavator and to make minimization of the stock level. The production plan of hydraulic control valve includes the decision of the quantity supplied by subcontractor. This paper presents a scheme for a scheduling system of the hydraulic control valve considering the schedule of the assembly line for excavator production. This paper provides a methodology, which can make a plan of supply and production and generate a detailed schedule for daily production.

  • PDF

Global Standard realizing process of Automobile Assembly Line

  • Seo, Byung-Chil
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.26-27
    • /
    • 2015
  • In the trend of globalization and location transfer of existing production bases is still characterized by an extremely unstable status between different countries and different regions. The results are negative impacts on cost, quality and speed of project implementation, especially automobile industry which is one of the most complex manufacturing sectors. In order to overcome problems from Global Standardization of Production Line and its Localization, it is highly required comprehensive coordination among design of production equipment, production technology, space and interfaces. It is necessary to set up standard of production equipment and building for parallel progress, in order to complete production line in shortest time for launching product. In addition, this standard should keep flexibility with consideration of local situation which means "Glocalization."

  • PDF

A Study on the Body Welding Operation Scheduling Considering the Assembly Line's Input Sequence in Construction Equipment Manufacturing (건설기계 조립 라인 투입 순서를 고려한 제관 공정 생산 스케줄링에 관한 연구)

  • Kim, Ki-Dong;Choi, Ho-Sik
    • Journal of Industrial Technology
    • /
    • v.27 no.A
    • /
    • pp.69-76
    • /
    • 2007
  • The body of an excavator, one sort of the construction equipment, consists of mainframe part, track frame part, boom part and arm part. The all parts are manufactured in the body welding operation. The scheduling in the body welding operation of a construction equipment manufacturing is to take all the various constraints into consideration. The offset time, due date, daily capacity of operations, daily jig's capacity, precedence relation, outsourcing, alternative resource and all of the shop floor environment should be considered. An APS(Advanced Planning & Scheduling) system is a proper and efficient system in such circumstance. In this paper, we present an APS system, the optimal scheduling system for the construction equipment manufacturing specifically for the body welding operation, using ILOG Solver/Scheduler. ILOG Solver/Scheduler is a general purposed commercial software which supports to find a feasible or optimal solution using object oriented technique and constraints satisfaction programming, given constraints and objectives.

  • PDF

A Study of a Video-based Simulation Input Modeling Procedure in a Construction Equipment Assembly Line (건설기계 조립라인의 동영상 기반 시뮬레이션 입력 모델링 절차 연구)

  • Hoyoung Kim;Taehoon Lee;Bonggwon Kang;Juho Lee;Soondo Hong
    • The Journal of Bigdata
    • /
    • v.7 no.1
    • /
    • pp.99-111
    • /
    • 2022
  • A simulation technique can be used to analyze performance measures and support decision makings in manufacturing systems considering operational uncertainty and complexity. The simulation requires an input modeling procedure to reflect the target system's characteristics. However, data collection to build a simulation is quite limited when a target system includes manual productions with a lot of operational time such as construction equipment assembly lines. This study proposes a procedure for simulation input modeling using video data when it is difficult to collect enough input data to fit a probability distribution. We conducted a video-data analysis and specify input distributions for the simulation. Based on the proposed procedure, simulation experiments were conducted to evaluate key performance measures of the target system. We also expect that the proposed procedure may help simulation-based decision makings when obtaining input data for a simulation modeling is quite challenging.

Off-line Visual Feedback Control of SCARA Robot Using Off Line Programming (오프라인 프로그래밍을 이용한 스카라 로봇의 비쥬얼 피드백제어)

  • 신행봉;이우송;이현철;한성현
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 2004.04a
    • /
    • pp.235-240
    • /
    • 2004
  • The equipment of industrial robot in manufacturing and assembly lines has rapidly increased. In order to achieve high productivity and flexibility, it becomes very important to develop the visual feedback control system with Off-Line Programming System(OLPS). We can save much efforts and time in adjusting robots to newly defined workcells by using OLPS. A proposed visual calibration scheme is based on position-based visual feedback. The calibration program firstly generates predicted images of objects in an assumed end-effector position. The process to generate predicted images consists of projection to screen-coordinates, visible range test and construction of simple silhouette figures. Then camera images acquired are compared with predicted ones for updating position and orientation data. Computation of error is very simple because the scheme is based on perspective projection which can be also expanded to experimental results. Computation time can be extremely reduced because the proposed method does not require the precise calculation of tree-dimensional object data and image Jacobian.

  • PDF

Visual-Servoing Control of Robot Manipulator (로봇 매니퓰레이터의 시각구동제어)

  • 신행봉;정동연;한성현
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 2003.10a
    • /
    • pp.213-218
    • /
    • 2003
  • The equipment of industrial robot in manufacturing and assembly lines has rapidly increased. In order to achieve high productivity and flexibility, it becomes very important to develop the visual feedback control system with Off-Line Programming System(OLPS). We can save much efforts and time in adjusting robots to newly defined workcells by using OLPS. A proposed visual calibration scheme is based on position-based visual feedback. The calibration program firstly generates predicted images of objects in an assumed end-effector position. The process to generate predicted images consists of projection to screen-coordinates, visible range test and construction of simple silhouette figures. Then camera images acquired are compared with predicted ones for updating position and orientation data. Computation of error is very simple because the scheme is based on perspective projection which can be also expanded to experimental results. Computation time can be extremely reduced because the proposed method does not require the precise calculation of tree-dimensional object data and image Jacobian.

  • PDF

011-line Visual Feedback Control of Industrial Robot Manipulator (산업용 로봇 매니퓰레이터의 오프라인 영상피드백 제어)

  • 신행봉;정동연;김용태;이종두;이강두
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 2002.04a
    • /
    • pp.567-572
    • /
    • 2002
  • The equipment of industrial robot in manufacturing and assembly lines has rapidly increased. In order to achieve high productivity and flexibility, it becomes very important to develop the visual feedback control system with Off-Line Programming System(OLPS ). We can save much efforts and time in adjusting robots to newly defined workcells by using Off-Line Programming System. A proposed visual calibration scheme is based on position-based visual feedback. The visual calibration system is composed of a personal computer, an image processing board, a video monitor, and one camera. The calibration program firstly generates predicted images of objects in an assumed end-effector position. The process to generate predicted images consists of projection to screen-coordinates, visible range test, and construction of simple silhouette figures. Then, camera images acquired are compared with predicted ones for updating position and orientation data. Computation of error is very simple because the scheme is based on perspective projection, which can be also expanded to experimental results. Computation time can be extremely reduced because the proposed method does not require the precise calculation of tree-dimensional object data and image Jacobian.

  • PDF

Off-line Visual Feedback Control of Robot Manipulator (로봇 매니퓰레이터의 오프라인 영상피드백 제어)

  • 신행봉;정동연;이종두;이강두;한성현
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 2001.10a
    • /
    • pp.140-145
    • /
    • 2001
  • The equipment of industrial robot in manufacturing and assembly lines has rapidly increased. In order to achieve high productivity and flexibility, it becomes very important to develop the visual feedback control system with Off-Line Programming System(OLPS). We can save much efforts and time in adjusting robots to newly defined workcells by using Off-Line Programming System. A proposed visual calibration scheme is based on position-based visual feedback. The visual calibration system is composed of a personal computer, an image processing board, a video monitor, and one camera. The calibration program firstly generates predicted images of objects in an assumed end-effector position. The process to generate predicted images consists of projection to screen-coordinates, visible range test, and construction of simple silhouette figures. Then, camera images acquired are compared with predicted ones for updating position and orientation data. Computation of error is very simple because the scheme is based on perspective projection, which can be also expanded to experimental results. Computation time can be extremely reduced because the proposed method does not require the precise calculation of tree-dimensional object data and image Jacobian.

  • PDF

A Real-Time Control of SCARA Robot Based Image Feedback (이미지 피드백에 의한 스카라 로봇의 실시간 제어)

  • Lee, Woo-Song;Koo, Young-Mok;Shim, Hyun-Seok;Lee, Sang-Hoon;Kim, Dong-Yeop
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.17 no.2
    • /
    • pp.54-60
    • /
    • 2014
  • The equipment of SCARA robot in processing and assembly lines has rapidly increased. In order to achieve high productivity and flexibility, it becomes very important to develop the visual feedback control system with Off-Line Programming System(OLPS). We can save much efforts and time in adjusting robots to newly defined workcells by using OLPS. A proposed visual calibration scheme is based on position-based visual feedback. The calibration program firstly generates predicted images of objects in an assumed end-effector position. The process to generate predicted images consists of projection to screen-coordinates, visible range test, and construction of simple silhouette figures. Then, camera images acquired are compared with predicted ones for updating position and orientation data. Computation of error is very simple because the scheme is based on perspective projection, which can be also expanded to experimental results. Computation time can be extremely reduced because the proposed method does not requirethe precise calculation of tree-dimensional object data and image Jacobian.

Performance Measurement of Split PC Sleepers for Safety in Maintenance Work (분절형 PC침목의 안전성 확보를 위한 성능평가 시험)

  • Eum, Ki-Young;Um, Ju-Hwan;Sin, Seung-Kwon;Lee, Chang-Hun
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.6 no.4 s.23
    • /
    • pp.1-6
    • /
    • 2006
  • In terms of the speed-up of the conventional line, the research for a improved turnout was carried out continually around world. A turnout is known that it is the most unstable equipment structurally in the rail system. So, the turnout is needed more stable structure. An accurate assembly of turnout affects traveling qualify of turnout area and running safety. Therefore, a turnout which is pre-assembled at a factory by using the split PC sleeper is transported to construction site recently in advanced countries. In this paper, the performance measurements which estimate the safety of the split PC sleepers which are adopted for the first time to improve performance of turnout are implemented indoors. The split PC sleeper is one of components of the improved turnout. The test is considered of the worst ballast condition under the maintenance work as like STT(Swithc Tie Tamper) or MTT(Multiple Tie Tamper). These experiments results indicate that structural safety for the expansion joint of the split PC sleepers.