• Title/Summary/Keyword: Construction disaster

Search Result 1,500, Processing Time 0.028 seconds

A Study on the Cause and Improvement Plans of Construction Monitoring Sensors Decline in Durability (건설 계측센서의 내구연한 저하원인 및 개선방안 연구)

  • Woo, Jong-Tae
    • Journal of the Society of Disaster Information
    • /
    • v.15 no.1
    • /
    • pp.28-38
    • /
    • 2019
  • Purpose: The purpose of this study is to contribute to improvement of measurement management level of construction structure and technology development of monitoring sensor by presenting the detailed causes and improvement plans of construction monitoring sensor's decline in durability. Method: The causes and improvement plans of the durability degradation of the construction monitoring sensor were divided into the construction field and the electric, electronic field. The detailed status was reviewed. Results: In the field of construction, approval and inspection, inspection and testing, verification and calibration, and minimization of loss and damage ratio were reviewed. In the field of electric and electronics, sensor package and sealing, disconnection of stress concentration area, damage caused by lightning and corrosion were reviewed. Conclusion: It is expected that the durability of monitoring sensors applied to the construction site will become longer than the present status based on the study that analyzed causes and improvement plans of construction monitoring sensor's decline in durability in the field of construction and electric, electronic devices.

A Study on the Construction Equipment Object Extraction Model Based on Computer Vision Technology (컴퓨터 비전 기술 기반 건설장비 객체 추출 모델 적용 분석 연구)

  • Sungwon Kang;Wisung Yoo;Yoonseok Shin
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.4
    • /
    • pp.916-923
    • /
    • 2023
  • Purpose: Looking at the status of fatal accidents in the construction industry in the 2022 Industrial Accident Status Supplementary Statistics, 27.8% of all fatal accidents in the construction industry are caused by construction equipment. In order to overcome the limitations of tours and inspections caused by the enlargement of sites and high-rise buildings, we plan to build a model that can extract construction equipment using computer vision technology and analyze the model's accuracy and field applicability. Method: In this study, deep learning is used to learn image data from excavators, dump trucks, and mobile cranes among construction equipment, and then the learning results are evaluated and analyzed and applied to construction sites. Result: At site 'A', objects of excavators and dump trucks were extracted, and the average extraction accuracy was 81.42% for excavators and 78.23% for dump trucks. The mobile crane at site 'B' showed an average accuracy of 78.14%. Conclusion: It is believed that the efficiency of on-site safety management can be increased and the risk factors for disaster occurrence can be minimized. In addition, based on this study, it can be used as basic data on the introduction of smart construction technology at construction sites.

Research on Landscape Plan Strategy of Urban Waterside Space Buffer Zone - Focused on the Case of the Resilient Perspective of Plan - (도시 수변 완충지역의 경관 계획에 관한 연구 - 탄성 (resilient) 관점의 계획 사례분석을 중심으로 -)

  • Yang, Meng;Hong, Kwan-Seon
    • The Journal of the Korea Contents Association
    • /
    • v.20 no.7
    • /
    • pp.404-416
    • /
    • 2020
  • Flooding is an unavoidable natural disaster for the city. Flood disasters seriously undermine the city's economy, safety, and sustained development. In the course of development and construction of waterfront space in the same city, the construction of basic disaster prevention facilities cannot be avoided completely even if huge amounts of capital are invested to reduce the economic damage of flooding. The cost of rebuilding the city after the disaster is much higher than the cost of building disaster prevention facilities. In recent years, the theory of elasticity in urban reconstruction and so on has been a subject of city problem solving, creating widespread discussion and attention in academia. In other words, how to transform the concept of elasticity into practice based on theoretical and empirical factors is a real problem facing urban disaster. Through theoretical literature on the waterfront (space) buffer zone of a city (flood-weak area) and the case study of the city's practice, this paper tries to clarify the element of 5R, the theory of elastomeric fire prevention, and present detailed measures accordingly. In addition, the following two problems are addressed while emphasizing the feasibility of implementing the urban waterfront (space) plan of the elastomeric element around the urban water buffer zone. First, the means of disaster prevention planning are used to mitigate conflicts between individual utility of urban waterfront and disaster prevention functions in waterfront buffer zones, and second, the waterfront buffer zone can respond to flood-causing problems in terms of disaster prevention as much as possible through the elastic disaster prevention plan.

Analysis on Disaster Information Effect Process to Occupant Behaviour : Focusing on Relationship to Egress Time (피난시간을 중심으로 본 재실자특성에 대한 재난정보의 작용 과정 분석)

  • Ji, Donghoon;Lee, Seulbi;Lee, Hyun-Soo;Park, Moonseo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.11-22
    • /
    • 2018
  • Existing efforts to reduce total egress time actually focused on reducing travel time. However, consideration to reduce perception time or response time was insufficient although the ratio of travel time is one-third of total egress time and situations which the safety cannot be ensured by only reducing travel time were aroused. Therefore, the concept of disaster information, which could reduce both perception time and response time got attention To analyze the effect of disaster information on occupant behaviour, this study identified a relationship between 10 major disaster information and 3 occupant behaviour factors in terms of reducing egress time. By referring the relationship, this study conducted an virtual egress experiment with survey on 4 cases, the elderly, intellectual disabled, hearing disabled and visual disabled, to identify disaster information which reduce total egress time effectively. Finally, by analyzing the experiment result, this study proposed the process of disaster information effect on occupant behaviour as complementing insufficient occupant behaviour to ensure the minimum level of safety and maximizing relatively high occupant behaviour to ensure enough level of safety. The results are expected to account for relationship between disaster information and occupant behaviour with more explanatory power in terms of egress time. With further studies of disaster information and group behaviour, these series of studies could provide basic references for disaster information and occupant behaviour.

A Study on the Development Prospects of Building Construction Productivity through Construction Status Analysis (건설업 실태분석을 통한 건설업생산성의 발전전망에 관한 연구)

  • Park, Hong Tae;Jeon, Jun Tai;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.3
    • /
    • pp.242-257
    • /
    • 2012
  • Korea's population change trend is the aging and feminization as Reduction in mortality, average life extension. and is further increased Reduction of birth rate and aging population. if Our country concluded FTA(Free Trade Agreement) with the United States, Europe and China etc. labor-intensive industries will be the decline. Then, the construction workers' jobs are continually reduced. This is critical to the nation's economic, social and environmental influences due to Shortage of construction workforce and increasing labor costs. Eventually this is a major factor in reduced construction productivity. Therefore, this study is presented as a construction productivity development prospects on the value-added analysis per Labour productivity employee from Construction market trends, industry-specific productivity index, industry trends Employed, age tiered workforce trends, women's workforce trends, labor time trend, foreign workers, workforce trends, analysis of trends in construction contract, awarded by Company Size trends, construction management analysis index.

The Review of Studies on Safety and Health Management System of the Specialized Construction Company (전문건설업 안전보건경영시스템 동향연구)

  • Kim, Se-hoon;Kang, Hwi-jin
    • Journal of Korean Society of Disaster and Security
    • /
    • v.13 no.1
    • /
    • pp.41-50
    • /
    • 2020
  • The introduction, construction, and operation of the safety and health management system of specialized construction companies have a problem incurred in the cost of introducing and operating the safety system. In addition, it is difficult to establish a virtuous cycle system to build a safety system, obtain a certification, and settle in a harsh environment that does not have technical personnel in construction safety. The purpose of this paper is to investigate and review the literature related to the safety and health management system of the construction industry and to analyze various research trends such as the actual situation. Through this, it is to find ways to improve the safety and health management system level of specialized construction companies that want to build and obtain the safety and health management system of the construction industry and specialized construction companies that are carrying out the post-assessment and extension examination after obtaining the certification.

Root Cause Analysis of Construction Accident Using 5 Why (5Why를 통한 건설사고 원인분석)

  • Choonhwan Cho
    • Journal of the Society of Disaster Information
    • /
    • v.20 no.3
    • /
    • pp.644-653
    • /
    • 2024
  • Purpose: Looking for the root cause of a construction accident leads to the problem of unreasonable construction costs and air setting by the person placing an order. In addition, low-cost bidding by a contractor with insufficient capacity is combined, creating an inappropriate construction structure that can cause an accident before the start of construction. Method: Analysis of the problem that the lack of original contractor resources in the construction environment is passed on to suppliers, and the phenomenon that partners and their workers are forced to push ahead with excessive work to secure a minimum margin. Result: Going back to the root of construction accidents, there are several dimensions of causes from physical phenomena to root causes, but the reason why accident prevention measures so far remain almost at the one-dimensional level of responding to the phenomenon is the lack of fundamental cause analysis. Conclusion: It is necessary to shift the paradigm to safety accident measures led by the client (the client) and the government, and construction accidents are reduced only when root cause of construction accidents is found through fundamental cause analysis techniques such as 5Why.