• 제목/요약/키워드: Construction costs

검색결과 1,535건 처리시간 0.039초

The Economics of Skyscraper Construction in Manhattan: Past, Present, and Future

  • Barr, Jason
    • 국제초고층학회논문집
    • /
    • 제5권2호
    • /
    • pp.137-144
    • /
    • 2016
  • This paper discusses the economics of skyscraper construction in Manhattan since 1990. First the paper reviews the economic theory of skyscraper height. Next it documents the frequency and heights of skyscraper construction in the last 25 years. Then the paper reviews the relative movements of office rents, condominium prices, and construction costs. Statistical results suggest that the resurgence of Manhattan's skyscraper construction is being driving by the rise in the average price of apartments, and is not being driven by rising office rents or falling construction costs. Statistical evidence shows that the height premium has not been rising over the last decade. Developers have been purchasing air rights (and bidding up the prices) in order to satisfy the demand for supertall buildings. In the next five to ten years, Manhattan is likely to see over thirty 200-meter or taller buildings, as compared to only four since 2010.

A COST-BENEFIT ANALYSIS OF INTEGRATING ERP SYSTEMS WITH PROJECT MANAGEMENT SYSTEMS IN CONSTRUCTION

  • BooYoung Chung;Miroslaw J. Skibniewski
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.575-586
    • /
    • 2005
  • This paper presents an approach to quantifying the costs and benefits of integrating ERP systems with project management systems, including potential time and cost savings. To properly identify the costs and the benefits, the paper shows the relevant construction information flows and the desired milestones in the integration process. The proposed benefit analysis model should allow construction firms considering the integration of their ERP systems with legacy systems or commercial project management software make informed decisions in regard to the existing alternatives in the early stages of decision making.

  • PDF

공장가공에 따른 샌드위치 패널공사의 생산성 및 경제성 분석 (Productivity and Economic Analysis of Sandwich Panel Construction Work by Shop Fabrication)

  • 조동열;손재호;이승현
    • 한국건설관리학회논문집
    • /
    • 제10권5호
    • /
    • pp.113-122
    • /
    • 2009
  • 1970년대부터 고도의 산업발전을 이루기 시작한 국내 건설현장에서 저렴한 공사비용 및 간편한 시공성 등을 장점으로 샌드위치패널을 활용한 건축물이 급격하게 증가하는 실정이다. 하지만 샌드위치 패널의 시공을 담당하는 기업들은 대형 건설업체보다 중소건설업체인 관계로 생산성 향상을 위한 연구가 부족한 상황이다. 본 연구는 샌드위치패널공사 현장조사를 하여 작업조별 작업싸이클을 분석하고 Webcyclone을 이용한 모델링을 하였으며, 각 작업조별 생산성 및 공사금액을 분석하였다. 또한 생산성 영향요인중 하나인 패널의 가공장소에 따른 생산성 및 공사금액의 변동을 민감도 분석하여 각 작업조별 최적화된 생산성 및 공사금액을 분석하였다. 분석결과 공장가공 작업조가 현장가공 작업조에 비하여 약 30% 정도의 생산성이 향상됨으로 조사되었고, 공사비용 분석 결과 약 15% 정도의 공사비용이 증가됨으로 조사되었다. 또한 개구부 요율에 따른 민감도 분석에 의하여 약 20% 정도의 개구부를 공장에서 가공을 하였을 때 공사금액 최적화가 이루어짐을 보여준다.

개보수 대상 건물의 비용 측면에서의 효율성 평가에 관한 연구 - 바닥 마감재를 중심으로 - (A Study on the Evaluation of the Efficiency in the Costs of the Remodeling)

  • 김상용;정병우;강경인
    • 한국건축시공학회지
    • /
    • 제3권4호
    • /
    • pp.129-134
    • /
    • 2003
  • The purpose of this study is to evaluate efficiency by the Life Cycle Cost(LCC) analysis of floor covering materials for remodeling. This study has been performed as a case study. The LCC analysis is a technique which takes account into both initial-future costs and benefits of an investment over some period of time. LCC is important in commercial decision making because it provides improved assessment of the living-term cost effectiveness of construction projects as well as alternative economic methods that focus on initial costs. For LCC analysis and comparison, the present value technique is used. The results of this study are summarized as follows; (1) A LCC analysis model of floor covering materials is suggested through a case study (2) As a result of LCC case study, the type of sheet is analysed more economical than that of tile in floor covering materials.

폐콘크리트의 현장재활용 사례를 통한 이산화탄소 배출에 따른 사회적 비용 비교분석 (The Comparison and Analysis of Social Cost according to Emission of Carbon Dioxide through Case Study on the Site-Recycling of Waste Concrete)

  • 권순범;이재성;장서연;배기선;정종석
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.459-462
    • /
    • 2007
  • 최근 급증하는 건설폐기물의 재활용이 중요한 문제로 대두 되고 있으며, 이를 활성화하기 위하여 건설폐기물 현장재활용의 논의 가 활발히 진행되고 있다. 이미 선행연구에서 현장재활용의 경제성 우수성이 입증되었지만, 현장재활용에 따른 사회적 비용의 정량화에 관한 연구는 미진하다. 본 연구에서는 현장재활용에서 발생하는 이산화탄소 발생량에 따른 사회적 비용을 산출하여 이를 중간처리 시 및 석산골재 생산 시 산출된 사회적 비용과 비교/분석하였다. 분서결과에 따르면, 현장재활용이 가장 우수하였다.

  • PDF

에머지(Emergy) 개념을 이용한 다목적댐 건설의 생태경제학적인 평가방법에 관한 연구 (A Methodological Study on Ecological Economic Evaluation of a Multipurpose Dam Construction Using Emergy Concept)

  • 강대석;박석순
    • 환경영향평가
    • /
    • 제8권2호
    • /
    • pp.45-51
    • /
    • 1999
  • Emergy concept was used to evaluate the contributions of a dam construction to the real wealth of our economy. A dam that is proposed as a multi-purpose dam was used to illustrate emergy evaluation methodology. Models for emergy evaluation were constructed with energy systems language, a symbolic modeling language which presents network properties of systems holistically. Water supply was the most important contribution in terms of emergy, which reflects that the dam is proposed for stable water supply to a local region. Generation of electricity was the second in emergy benefits of the dam. Emergy costs were more evenly distributed among the costs which would occur as a result of the dam construction. Emergy yield ratio was 1.30 if sediments are not included, and 1.15 if sediments are included, which results in net yield in both cases. The ratio would, however, fall below 1.0 if rare species within the system boundary are lost as a result of the dam construction because of the high emergy value included in biotic species, which means that emergy costs will be greater than emergy benefits. This study illustrated a new methodology in environmental impact assessment to better manage our environments in an age of diminishing resources.

  • PDF

장수명주택 인증기준별 최적화를 위한 Infill 연구 (A Study of Infill Optimization Methods Applied with Life-long Housing Certification Standards)

  • 왕우철;임석호
    • 한국주거학회논문집
    • /
    • 제27권6호
    • /
    • pp.57-64
    • /
    • 2016
  • Life-long housing refers to housing units whose performance is certified by the head of a Life-long Housing certification authority with respect to durability, variability and ease of repair. Since life-long housing should be able to meet residents' demands for changes in living space, the space of the housing should be able to be varied by using a dry construction method, instead of a wet construction method. For life-long housing to be approved, the installation of infill systems that life-long housing certification standards is needed. At present, apartment houses are being constructed only in accordance with the general rating, which is the lowest rating in the life-long housing certification system. The reason for this is that, since the infill system was created, it has not yet been actively used due to a rise in construction costs when infill products are utilized. In this regard, this study seeks to propose ways to optimize infill usage and create scenarios that can minimize the costs of life-long housing construction, taking into consideration variations in construction costs based on the characteristics of infill systems applied to housing.

초고층 공동주택의 CO2 배출량과 경제성 분석에 관한 연구 (The Analysis CO2 Emission and Economic Efficiency of High-rise Apartment Houses)

  • 노승준;태성호;김태형;금원석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.47-48
    • /
    • 2012
  • In this study, the CO2 emission and economic efficiency of high-rise apartment houses were evaluated, and were analyzed as a way to establish database on the evaluation of environment-friendliness of high-rise buildings. To that end, standard of buildings to be evaluated were proposed through analysis of the designing guideline for high-rise apartment houses proposed by Seoul city, and CO2 emission of the subject buildings were evaluated based on the characteristics of materials admitted into each building and the amounts of energy consumed during lifecycle period. In addition, the initial costs in construction stage and annual costs in operation stage were set as analysis parameters, and along with calculation of direct cost by the consumption of construction materials and energy, the costs of CO2 emission were evaluated and analyzed. As a result, the CO2 emission and economic efficiencies of high-rise apartment houses by construction stage and operation stage could be analyzed quantitatively.

  • PDF

Framework to Compute Vehicle Emission Costs Associated with Work Zones

  • Shrestha, K. Joseph;Adebiyi, Jeremiah;Uddin, Mohammad Moin;Sturgill, Roy
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.952-959
    • /
    • 2022
  • Active construction work zones will result in longer travel time and/or longer travel distances for road users because of reduced speed limits and/or detours. This results in increased fuel consumption and increased emissions of harmful gases such as Carbon Monoxide (CO), Nitrogen Oxides (NOx), and Sulfur Oxides (SOx), which causes discomfort to the environment and road users around the work zone. The impact of such emissions should be considered while designing work zones or determining the number of days the roadway will be allowed to be closed partially or fully. This study develops a methodology to compute additional road user costs associated with such work zones. To achieve this goal, a) an extensive literature review is conducted, b) a framework to compute emission cost is developed, c) emission rates are computed for all counties (95) of the state of Tennessee, and d) a case study is conducted to demonstrate the use of the framework to estimate the additional impact of emission because of the work zone. For the case study conducted, the emission cost was computed to be $10,653.60 for the duration of the project. State DOTs can account for such road user costs while selecting contractors using A+B bidding. Accounting for such impact of emission will also indicate the agency's willingness to consider sustainability as a part of the business practices.

  • PDF

실적공사비적산제도 도입에 따른 도급금액 변동 분석 (An Analysis of Differences between Contract Costs Estimated by the Actual-Cost-Data-based Method and the Quantity-based Method)

  • 박창배;김동영;김주형
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2004년도 제5회 정기학술발표대회 논문집
    • /
    • pp.510-514
    • /
    • 2004
  • 본 연구는 실적공사비적산제도의 과도기적 문제점 분석과 이의 개선방안에 관한 연구의 기초 단계로 수행되었다. 이를 위해 원가 계산 방식과 실적 공사비 방식의 정의 및 구조를 알아본 후 세 개의 프로젝트를 대상으로 양 방식을 적용해 도급금액 내역서를 작성해 보았다. 이와 함께 현재 실재로 실적공사비 적산제도를 활용해 도급금액을 산정하고 있는 한국 S공사의 두 개의 프로젝트를 대상으로 공사측에서 제시한 금액과 원가견적방식으로 산출된 금액을 비교하였다. 이를 통해 실적공사비적산제도로 공사를 발주했을 경우 현재 방식과 비교해 도급금액이 어느 부문에서 어느 정도 변하는 가를 파악하였다.

  • PDF