CONSTRUCTION PROJECT CLAIM MANAGEMENT

  • M. ASLAM MIRZA
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.160-168
    • /
    • 2007
  • Conflicts of interest and independent agenda of the parties brought together for implementation of a construction project often leads to dispute in Contract and claim situations. Construction Industry is notorious for claim that is managed on its arising and there lacks an endeavor to minimize the breeding grounds through efficient planning and alignment to purpose, of all contract-documents. There failure of a concerted effort entails wastage of resources, delayed completion of facilities and stained relationships of parties when collide in mistrust in contract to win over the other. There needs a focus on the claim breeding issue and establish an effective mechanism to deal with disputes in urgency. Claim occurs mostly during the construction phase. But the seeds of claim and nutrients essential for development are contained in the contract documentation and the information supplied or not in pre-contract phase. Opportunity to prevent nutrients for seed of Claim comes to an end once tender-documents are finalized, the contract is awarded and established or not a mechanism for dealing with claim situation. The processes presented here would help in minimizing the breeding grounds and emergence of disputes during progression of works and dealing with eventualities in forceful manners for finding a resolution most effectively in relevant time.

  • PDF

Claim Management Process of General Contractors in South Korea

  • Seo, Wonkyoung;Kang, Youngcheol
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.207-215
    • /
    • 2020
  • The purpose of this study is to investigate the current status of claim management process of general contractors in South Korea. As the claim management becomes more important nowadays, maintaining the process for claim management systematically and consistently becomes more important as well. To improve the claim management process, it is necessary to diagnose the current status of claim management process so companies establish their targets for improvement. This study develops a survey to identify the current status of claim management process that major general contractors in South Korea have. Questions in the survey are classified into four categories including entitlement check, potential claim event check, time bar check, and tasks for substantiation. By conducting a series of statistical analyses with 94 survey data collected from employees working in the general contractor companies in South Korea, this study examines and analyzes their claim management process in terms of the several categories. It is expected that the results contribute to diagnosing how practitioners maintain their claim management, which will help them establish the direction of management enhancement.

  • PDF

Development of Checklist to Prevent Claim through Dispute Case Analysis of Public Construction Projects (공공공사의 분쟁사례 분석을 통한 클레임예방 체크리스트 개발)

  • Shin, Chang-Joon;Kim, Yoon-Kyum;Cho, Kyu-Man;Hyun, Chang-Taek;Hong, Tae-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.13-22
    • /
    • 2011
  • Many studies on cause and prevention of claim have been carried out but they were mostly intended to come up with the improvement measures, improvement system or the measures to deal with the claim, which consequently lacked the substantial ways to identify the details of claim for prevention purpose. That is, there's in fact no tool, in preparation for potential claims, to identify and review the major potential causes at design stage to mitigate the claim and thus, it's necessary to develop the tool such as checklist needed to prepare the claim-supporting documents, check the relevant laws as well as to identify the cause of claim. Hence the study, given the fact that cause of claim is mostly generated at the design stage though the claim itself tends to occur at the construction stage, was aimed at developing the checklist based on contract document such as design documents at design stage for public construction projects in a bid to prevent the potential claim occurred at the design stage.

Datamodel for Productivity Management of Construction Project (건설공사 생산성 관리를 위한 데이터모델)

  • Ryu Han-Guk;Yu Jung-Ho;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.442-445
    • /
    • 2002
  • Construction delay claim occurs more often than any other claim. Delay claim impacts adversely the company's existence as well as the project's monetary problem. Because the calculation of the delay is not quantitative, owing not to have enough evidence, it is hard to solve evenly the delay claim. So, it is need to cumulate structurely the construction data or evidence during the construction. This study considers the established study about construction delay claim database and the problems and then presents the relation method between phase schedule and database. Finally, this study established the productivity claim database modeling for construction project through conceptual database modeling and logical database modeling based on information needed to make construction productivity database. So. the purpose of the study is to establish the datamodel for productivity management of construction project for calculating the delay days considering the lost productivity.

  • PDF

An Improved Process System to File a Claim in Construction Projects (건설공사 시 클레임 제기를 위한 프로세스 시스템 개선 방안)

  • Bang, Taewon;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.3
    • /
    • pp.22-32
    • /
    • 2017
  • Judging from the past cases, the contractor has frequently suffered losses caused by disapproved requests or reduced payments since it has not known the conditions of the contract or it has filed a claim to the owner without any proper claim system. Therefore, the existing claim process needs to be reformed. In order to reform the claim process, the contractor should consolidate the organizational structure, grant accurate duty assignments to the claims manager, implement regular staff training on how to deal with claims. In addition to this reformation, the contractor needs to improve the management of construction period and process control, and manage related documents thoroughly. Regular meetings are also necessary in claims. This study attempts to prove the effectiveness of the reformed process applied to Project "A", where the owner was responsible for the delayed supply of materials, inaccurate oral instructions, insufficient information on the work, and frequent changes of design. The project was completed in 96 months, which was extended by 34 months from the initial construction period of 62 months. The reformed claim process is expected to be of great help not only to largescale construction works but also to smallscale ones.

Claim Management during Construction based on Key Claim Management Factors (클레임 핵심관리요인을 기반으로 한 건설공사 중의 클레임 관리)

  • Lee, Jun-Hyung;Lee, Hyun-Soo;Park, Moon-Seo;Kim, In-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.463-468
    • /
    • 2007
  • The disputes in construction projects are very important issue for stakeholders. However, many of presented claims have not received the compensation money required, and frequently turned down. The most cause is that the claims are not managed systemically on construction. Therefore, it is important to identify which management works are conducted on construction and how significantly do they relevant to construction claim. This research derives key claim management factors through analyzing causes for claim success and failure, and then presents management works relevant to them. This research also proposes the method for effective claim management and its expected effect through expert interview.

  • PDF

An Analysis of Accident Causes in Construction project by Using Insured Claim Payouts (건설공사보험 손실액을 활용한 사고원인 분석연구)

  • Yu, Yeong-Jin;Kim, Sang-Ho;Yang, Sungpil;Kim, Ji-Myong;Son, Kiyoung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.60-61
    • /
    • 2015
  • In recent years, the accidents in construction projects are continuously increasing due to their complexity and variety. However, few studies have been conducted regarding the risk prediction model and the database of risk assessment in construction projects. To address of these issues, the objective of this study is to analyze the accident causes by using insured claim payouts of insurance companies. First, the descriptive analysis of accidents causes is conducted according to scheduling rate, season, and total construction costs. Second, the correlation analysis is conducted between accidents causes and total construction costs. In the future, the risk assessment model can be developed to quantify the accident causes in construction projects to estimate claim payouts of insurance companies.

  • PDF

Forecasting the Effects of the Claims in the Korean Construction Industry (국내 중재사례를 통한 주요 건설 클레임 예측 방안)

  • Kim, Jihye;Im, Haekyung;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.5
    • /
    • pp.35-44
    • /
    • 2016
  • Various risk factors are known to be the nature of construction project execution process. These factors lead to potential claims, dispute mediation, arbitration, and litigation which can result in huge loss of money and time. Therefore, it is necessary for construction companies in Korea to improve overall project management capability through the evaluation before entering into the overseas construction market. Also, after examination of the claim and dispute caused by construction project risks, a substantial degree of influence and active preparation for the claim and dispute management should be confirmed via the effect analysis of the each factors. Main claim causes were derived through claim and dispute cases involved with domestic construction projects. As a prediction result of the main claim, 16.1% of the construction change claim, 5.7% of the bad faith claim and 2.7% for the construction delay claim were found to be the portion of the total construction cost. As a result of this analysis, risk management methodology was suggested to improve a project management capability for domestic construction companies through analysis result of the main factors of construction claims.

Preliminary Study on the Factors Analysis of Change Order-Claim in Design-Build Project (설계시공일괄입찰공사의 설계변경 클레임요인 분석에 관한 기초 연구)

  • Ryu, Hyeok-Jun;Park, Byung-Ju;Yoo, Seung-Kyu;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.129-130
    • /
    • 2012
  • Although the order of Design-Build is being expanded by increasing construction scale and demanding hybrid function, the suitable regulation of the contracts is not settled. Design-Build is way by government because there are big construction of much government leading in contract relation high position occupy. So, case that prebendary's claim institution develops by litigation is very rare. But, recently Design-Build is magnified. So, these dispute factors is becoming visualization gradually. The contract system is needed to be consistent by international standard to deal with the problem. This study suggests the useful solutions in detail concerned with the main factor of change order claim by each Design-Build phases through practical sorting and analysis of the causes of Change Order-Claim.

  • PDF

PROPOSING MANAGEMENT OF WORK PRIORITY TO REDUCE CONSTRUCTION FAILURE CLAIMS

  • In-ho Kim;Moon-Seo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1171-1176
    • /
    • 2005
  • Dispute related to construction projects involving numerous persons is one of the biggest challenges faced by contractors today. It costs a substantial amount of money and time in resolving these kinds of claims. Recently, with the changes in the construction environment and thought of relation with owner, the number of construction claims has increased. But, a majority of these claims do not prevail, and in fact, frequently get dismissed in its entirety. The reasons for such dismissals include the ignorance about the claims, lack of clear and convincing evidence, and so on. But most of reasons are the claims are not managed well on construction process. This paper analyzes the failure causes by relying on past claim failure cases, and then drew works that have connection with failure causes through interview. It also presented importance degree of construction management works.

  • PDF