• Title/Summary/Keyword: Construction Works

Search Result 1,812, Processing Time 0.027 seconds

An Analysis on the Safety Accident Network and Risk Level of Construction Machine and Equipment (건설기계·장비의 안전재해 네트워크 및 위험도 분석)

  • Shin, Won-Sang;Son, Chang-Baek
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.5
    • /
    • pp.35-42
    • /
    • 2018
  • In order to seek out methods to reduce safety accidents caused by construction machinery and equipment, this study collects data about safety accidents and draws main risk factors by construction from the data, through SNA. It aimed to suggest safety management points to be used in future construction fields, by analyzing risk index of such factors. The finding can be summarized: First, Backhoe Bucket is the risk factor for crash accidents of average workers in earth works; boring machines-maintenance is the risk factor for fall accidents of construction machinery operators in foundation works; bending machine-reinforcing rod processing is the risk factor for jamming accidents of reinforcing rod engineers in frame works; and mobile crane-hook is the risk factor for crash accidents of average workers in lifting works. Second, works can be arranged in turn, according to the risk index: earth, lifting, frame and foundation works. Risk factors can be also arranged according to the risk index: Backhoe in earth works, pile drivers in foundation works, bending machines in frame works and mobile cranes in lifting works. This study has some limits, in that it only analyzed main machinery/equipment, among various kinds of them, for earth, foundation, frame and temporary works (lifting works) and used data collected over three years. Therefore, it is necessary to conduct an analysis using big data, by collecting additional data about a lot of machinery/equipment in future construction fields.

Special Technician Jeong Woo-tae's Activity and Role in the Governmental Construction Works during the Reign of King Jeong-jo and King Sun-jo of the Joseon Dynasty (정조.순조연간 관영공사에서 별간역(別看役) 정우태(丁遇泰)의 조영활동)

  • Kim, Dong-Uk
    • Journal of architectural history
    • /
    • v.16 no.3
    • /
    • pp.115-131
    • /
    • 2007
  • Jeong Woo-tae(?-1809) was a military official who had worked as Byeol-Gan-Yeok in the governmental construction works during the late 18th century through the early 19th century. Byel-Gan-Yeok, literally a special technician, was an official post in the governmental construction works that carries specific technical tasks from the mid 18th century. Over 30 years, Jeong Woo-tae had devoted himself in the construction of various royal tombs, city walls, and palace buildings. He showed superb and various techniques in the works of stone carving and architectural details. After finishing the construction of the tomb of King Jeong-jo's father successfully, he was appointed as a governor of a rural town. Being on duty of the governor, he used to participate in the construction works as a technician. He also made a couple of innovative devices in the field of construction, like a carrying apparatus, Byel-Nok-No. His works secured the setting up of the post of Byel-Gan-Yeok in the governmental construction system in the 19th century. But his technical achievement remained as his own private works rather than developing to the universal growth of the craftsmen's skill. This might be a limitation of the Byel-gan-Yeok's role, whose position was remained in the midway between official and craftsman.

  • PDF

Weight Evaluation of Risk Factors for Early Construction Stage (초기 건설공사 리스크인자의 중요도 산정)

  • Hwang Ji-Sun;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.115-122
    • /
    • 2004
  • This study identifies various risk factors associated with activities of early construction stage, then establishes the Risk Breakdown Structure(RBS) by classifying the risks into the three groups; Common risks, risks for Earth works, and risks for Foundation works. The Common risks are identified and classified by considering various aspects of the early construction stage such as financial, political, constructional aspects, etc. The risks for Earth works and Foundation works are identified in detail by surveying technical specifications, relevant claim cases and interviewing with experts. These risks are classified based on the Wok Breakdown Structure(WBS) of the early construction stage. The WBS presented in this study classifies the works of early construction stage into four categories; excavation, sheeting works, foundation works, footing works. This study suggests a risk analysis method using fuzzy theory for construction projects. Construction risks are generally evaluated as vague linguistic value by subjective decision making. Fuzzy theory is a proper method to quantify vague conditions of construction activities. Therefore, this study utilizes fuzzy theory to analyse construction risks. The weight of risks is estimated by reflecting the interrelationship among risk factors from absolute weights obtained by fuzzy measure into the relative weights by Analytical Hierarchy Process(AHP). The interrelationship is estimated by Sugeno-fuzzy measure.

A Study of Landscape Construction Work Classification for System Instruction of New Estimation System based on Historical Construction data. - With regard to Housing Landscape Construction - (실적공사비 적산방식 도입을 위한 조경공사 공종분류체계에 관한 연구 -주택단지 조경공사를 중심으로-)

  • 박원규;김두하;안동만
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.25 no.1
    • /
    • pp.82-99
    • /
    • 1997
  • The purpose of this study is to establish work classification system of landscape construction in order to offer the basis of new estimation system of public landscape construction. New estimation system is based on historical construction data. For application of this system, the standard work classification system is necessary. Because extensive cost data should be accumulated under an unified construction work classification system. In the study of new estimation system carried by KICT(Korea Institute of Construction Technology), landscaping works belong to earth work of civil engineering. It looks very unreasonable work classification, because landscape archtecture has its own specialties and professional domain. In this study, information classification systems in the construction industry and various landscaping works of housing developments are analysed. As a result. a standard work classification system of housing landscape construction is proposed in section VI-3. This standard work classification structure consists of three levels divisions (i.e large work division, middle work division, small work division) . Now in this study, housing landscape construction works are divided into four large works and twenty six middle works. According to work attributes, middle and small work division is possible to subdivide into details.

  • PDF

EVALUATING PRODUCTIVITY-AFFECTING FACTORS ON FINISHING WORKS IN HIGH-RISE HOUSING CONSTRUCTION

  • Chi-Joo Lee;Jae-Jun Kim;In-Suk Park;Sang-Hyo Lee;Yoon-Sun Lee
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.398-406
    • /
    • 2007
  • Constructing high buildings is a global trend, and skyscrapers for residing are also increasing. But a period of works for finish construction is different depending on a company while a period of works for frame construction of skyscrapers for residing in the country is regular when considering a difference of a method of construction, and the increase of repeated construction for high buildings and number of related process for finish construction are stressing the importance of improving productivity through construction management and plan for works. Because there are many compositive factors affecting productivity other than technical factors, we should intensively study the way of improvement and prevention preferentially through analyzing factors affecting productivity. So in this study, we present important management factors for making systematic strategy and plan for improvement of productivity by finding factors affecting productivity depending on the degree of importance unifying factors affecting productivity of plan factor(internal factor of construction process) and management factor(outer factor of construction process).

  • PDF

Process Interference Management for Finish Works using Mobile Technology (모바일 기술을 이용한 마감공사의 작업간섭 관리)

  • Ko, Yong-Ho;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.35-36
    • /
    • 2017
  • The finish works of construction projects comprises approximately 40% of the total construction duration. Thus, the management of finish works have as big as impacts on total project duration as the earthworks, foundation and structure works. Process interference management is considered one of the most important issues dealt during finish works. However, it was investigated that effective management systems have yet not been applied for practical use. Accordingly, this paper suggests a mobile technology based finish works management system that mainly focuses on preventing process interference occurred due to ineffective communication between general and sub-contractors.

  • PDF

Classifying Management Tasks to Improve PC Construction Management System (PC공사 관리체계 개선을 위한 주요 관리업무 분류)

  • Mun, Seong-Hwan;Kim, Taehoon;Cho, Kyuman
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.177-178
    • /
    • 2020
  • In the construction industry, expectations for the Precast Concrete(PC) construction method are rising due to demands for high quality and productivity and social and environmental issues. However, although technical problems that occurred in the early stages of technology introduction have been solved, research related to proper construction management for PC construction methods has been relatively neglected and the advantages of PC construction methods have not been fully utilized. In this study, each group involved in PC works was surveyed to identify important management tasks affecting productivity of PC works to improve PC contruction management system. Based on factor analysis, 22 tasks were calssified into 5 management groups. The results of this study will be used to present a framework for the application of automation and information technology to improve the productivity of PC works.

  • PDF

Development of Support System in Preparing Placing Drawings for the Improvement of Efficiency of Reinforcing Steel Works

  • Hyeon-Yong Park;Tai-Kyoung Kang;Yoo-Sub Lee;Hun-Hee Cho;U-Yeol Park;Hyun-Oak Jung;Kyo-Sun Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1370-1376
    • /
    • 2009
  • Reinforcing steel works should be carefully controlled by the construction manager considering the severe fluctuation of the price of reinforcing steel bars and for the safety of structure in building constructions. In particular, preparing rebar placing drawings needs more effort and time than before because of the emergence of higher and more complicated buildings. Moreover, the experience of field engineers or foremen (fabricators or detailers) in preparing placing drawings gives rise to the differences in fabricated bar type and quantity of bars used. To address these problems, this study proposed the support system in preparing placing drawings for reinforcing steel works efficiency. In the near future, if this system can be made available on the web, multiple end-users will be able to share the result; the efficiency of rebar supply chain management will also be improved.

  • PDF

A Study on the Hazard Analyses of Construction for Base Station of Mobile Communication (이동통신 기지국 공사의 위험요인 분석에 관한 연구)

  • Lee, Sang-wook;Kwon, Soon-joon;Yi, Young-seop
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.5
    • /
    • pp.44-51
    • /
    • 2015
  • As the domestic communication industry has been made rapid progresses, the construction of base stations are also expanded yearly from more than 86,000 ones in the year 2005 to over 300,000 ones in 2013. While the new construction and rebuilt works have been rapidly increased, there has been not tried about the analysis as well as the control of hazards for the construction works. This study is conducted to do not only the focus interview for 27 expert groups who are engaged in the construction works and safety, but also the questionnaires for AHP analysis which is suggested by the Korea Occupational Safety and Health Agency for 92 persons who are engaged in the construction works in order to analyze the hazards of construction works for base stations. The high ranked risk works which are acquired from the two methods are fall under installation of antennae, struck by the hand tools and construction materials under installation of antennae, fall during going up and down the steel tower and telegraph poles and the fall by electric shock during the underground cable works. The control for the above hazards are the installation of fall protection equipments, the installation of safety nets for falling objects and the installation of protection equipment of electric shock.

XML-base Process Improvement for Change Order of Construction Steel Works (XML 적용 철골공사 설계변경 프로세스 개선)

  • Nam, Gyoung-Woo;Seo, Yong-Chil;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.64-72
    • /
    • 2006
  • The participants of steel works should exchange a variety of information with others through documents. However construction steel works in the multistage contract system has a difficulty in exchanging information through the documents promptly. So if the trouble as change orders arise, conducting steel works will take much time, and the participants may not discuss the trouble sufficiently. Consequently this study improved the current business process of steel works. And this developed business support system(XCOS) based on XML so that participants of steel works achieve a successful management of steel works through conducting business rapidly and correctly.