LEAN CONSTRUCTION MEANS TO PROMOTE GOOD- AND ERADICATE BAD VARIATION

  • Iris D. Tommelein
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.51-59
    • /
    • 2009
  • Lean construction researchers and practitioners have established a new paradigm for managing construction projects. This paradigm stems from insights gained by viewing project delivery as one kind of production and, inspired by the success of the Toyota Production System, leveraging Toyota's 'lean thinking' in the context of such one-of production. Premises of lean construction are that (1) production systems are riddled with variation, (2) variation can be good or bad, but most of it is bad, (3) most of this variation-good or bad-is self-inflicted; consequently 'lean' passionately promotes good- and relentlessly eradicates bad variation. This paper surveys a few of many lean construction means to manage variation. Lean thinking encompasses a lot more than thinking about variation, but that is the lens used here through which construction project management is viewed. Pairing these premises with lean variation-management tools may help readers broaden the insights they can gain from reading the lean construction literature.

  • PDF

A Study on the Task Variation and Social Network Analysis in the Construction Process (시공 프로세스에서 발생하는 공사변동 요인 및 네트워크 분석에 관한 연구)

  • Park, Yoona;Lee, Dongdeok;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.105-113
    • /
    • 2019
  • A construction project is a complex process consisting of interdependent tasks. If one task has variation, other tasks will be affected additionally and it is difficult to reach consensus on task variation due to the characteristics of the construction site that is going on quickly and complicatedly. Therefore, this study identified the root cause of task variation in construction process. Adjacent matrix was created with the tasks corresponding to major causes of variation, and the network analysis was performed. The results of social network analysis in the construction process can stabilize the work flow in the complex process and improve the reliability of the process plan and the project performance.

Variation Determinants in Building Construction: Ghanaian Professionals Perspective

  • Asamaoh, Richard Oduro;Offei-Nyako, Kofi
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.4
    • /
    • pp.20-25
    • /
    • 2013
  • Variation in construction means modification of design, changes in quality, quantity of work including the alteration of standard of materials or goods to be used in the work and the removal from site any kind of material not in accordance in the contract. In Ghana, Variation order has become major issue in the construction industry. This had resulted in cost overruns, delay and in some contracts dispute, between parties. The aim of this paper was to identify the root causes of variation; effects of variations on projects in Ghana and the means of reducing the impact of variation order. The method of the study involved literature review, primary data collection, interview and closed - ended- questionnaires. Mean Scores Method was used to rank the identified factors causing variation. Analysis Of Variance Test was use to test for the significant difference between means among the professional groups. The study revealed that most causes of variation were change of design by client and inadequate working details. Establishment of oversight project management committee and flow of information were identified as means of controlling variations during project administration.

Development of A Computerized Risk Management System for International EPCS Projects

  • Yoo, Wi Sung;Kim, Woo-young;Sung, Yookyung
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.614-615
    • /
    • 2015
  • In these days, global construction market is speedily increasing and domestic construction companies have a chance of new contracts. In the meantime, international projects have been increasingly forced to cope with potential risks, which seriously impacted achieving the targeted time and cost. In this study, we introduce a computerized risk management system for international EPCS projects, which is constructed on the needs of practitioners and decision makers as an aid to proactively control the potential risks and to monitor continuously their status and variation. The system is called the Project Risk Management System (PRiMS) is useful for furnishing project managers with warning signals as a project is progressing and helpful for producing the total risk score and tracking risk variation.

  • PDF

Seasonal Variation of Water Temperature Before and After Weir Construction Using Satellite Image in the Nakdong River (낙동강유역에서 위성영상을 이용한 보 건설 전후 수온의 계절변화)

  • Kim, Sang-Woo;Kim, Hae-Dong;Lim, Jin-Wook;Ahn, Ji-Suk
    • Journal of Environmental Science International
    • /
    • v.24 no.11
    • /
    • pp.1417-1430
    • /
    • 2015
  • In this study we were to explore the seasonal variation of water temperature distributions before and after weir construction at Gumi, Chilgok, Gangjung(Goryung), Dalsung in the Nakdong River using Landsat satellite images. Relationship between in-situ water temperature and radiance values of Landsat-5, 7, 8 satellite images showed high correlation. Seasonal variation of water temperature in Nakdong River showed that the fluctuation ranges of water temperature before weir construction were larger than those after weir construction. This indicated that the variation of water temperature is due to the difference of heat storage volume by weir construction and dredging work. In particular, the water temperature after weirs construction in autumn was 4-8 times lower than that before weirs construction. Water temperature after weir construction decreased in spring and summer at the downstream of Gumi weir and Gangjung(Goryung) weir, and the upstream of Dalsung weir. In autumn and winter, the water temperature after weir construction increased in the upstream and downstream of the whole weirs except upstream of Gumi weir. Relationship between water temperature and meteorological elements (air temperature, wind speed, sunshine, radiation) showed high correlation of above 94% in air temperature, and then radiation was high correlation before and after 65%.

Case Study on Development of Residential Building Cost Index Compilation Model (주택원가지수 산정모델 작성 사례연구)

  • Cho Hun-Hee;Lee Yoo-Seob;Kang Tai-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.220-226
    • /
    • 2003
  • The Residential Building Cost Index which presents price variation of construction resources required in a residential building project in single value, has been compiled to evaluate appropriate level of the price variation. This research reviewed the compilation methodology for Residential Building Cost Index based on comparative analysis on domestic statistics and proposed the Residential Building Cost Index through a variety of case studies. It would facilitate monitoring the price variation of a residential building cost and contributes to enhancing the applicability of construction cost data.

A Study on the Pattern of Price Variation for the Remodeled Multi-Family Housing (리모델링 사업에 따른 공동주택의 가격변화에 관한 연구)

  • Kim, Jaesung;Cho, Kyuman;Kim, Taehoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.257-258
    • /
    • 2016
  • Construction of Multi-Family Housing(MFH) was rapidly spread in the 1990s, it has been mostly passed more than 20 years and it is faced to aging time. Remodeling has emerged a major issue in the construction industry as an alternative of improvement and recovery the initial performance of the deteriorated MFH. But, Many decision-makers are struggling to determine whether to conduct a remodeling because of profitability. In this context, this research was conducted as the following steps to achieve this research goal, i) remodeled MFH cases and comparative cases were collected, ii) the price information based on three time frames (i.e., before remodeling, after remodeling, and present) was collected, and iii) the relative price variation of the remodeled cases was analyzed and finally it is revealed that there are four patterns of price variation.

  • PDF

Elimination of environmental temperature effect from the variation of stay cable force based on simple temperature measurements

  • Chen, Chien-Chou;Wu, Wen-Hwa;Liu, Chun-Yan;Lai, Gwolong
    • Smart Structures and Systems
    • /
    • v.19 no.2
    • /
    • pp.137-149
    • /
    • 2017
  • Under the interference of the temperature effect, the alternation of cable force due to damages of a cable-stayed bridge could be difficult to distinguish. Considering the convenience and applicability in engineering practice, simple air or cable temperature measurements are adopted in the current study for the exclusion of temperature effect from the variation of cable force. Using the data collected from Ai-Lan Bridge located in central Taiwan, this work applies the ensemble empirical mode decomposition to process the time histories of cable force, air temperature, and cable temperature. It is evidently observed that the cable force and both types of temperature can all be categorized as the daily variation, long-term variation, and high-frequency noise in the order of decreasing weight. Moreover, the correlation analysis conducted for the decomposed variations of all these three quantities undoubtedly indicates that the daily and long-term variations with different time shifts have to be distinguished for accurately evaluating the temperature effect on the variation of cable force. Finally, consistent results in reducing the range of cable force variation after the elimination of temperature effect confirm the validity and stability of the developed method.

A Study on the Performance Evaluation of Synthetic Resin Formwork Material (합성수지 거푸집 재료성능 검증에 관한 연구)

  • Nam, Kyung-Yong;Kim, Seong-Deok;Choi, Suk;Lee, Young-Do
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.151-152
    • /
    • 2019
  • This study length variation test, shock test were conducted to evaluate the performance of synthetic resin form. Results of both thermal length variation test and shock test satisfied the KS standards. for length variation test, the result of the horizontal and vertical valuse were -0.1% in average.

  • PDF

A Study on Application of Lean Construction Theory in Schedule Management (린 건설 공정관리이론의 현장적용에 관한 연구)

  • Jung, Joo-Young;Kwon, Won;Park, Sang-Jun;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.515-518
    • /
    • 2006
  • Construction project has various effective factor and many producer in multifarious process of the work. Thus it has many variation. However, Process management up to now is management method of conclusion oriented. So, it do not consider sequency and variation occurrence. In a result that a lot of problems happen. Lean Construction can solve limit of the present management method. And Lean Construction is estimated new management method of process management for reliance on process plan, safety of process and promotion of effectiveness. This study analysed application of real construction project in Lean Construction theory and examined to utilize VSM and TACT for field application.

  • PDF