Browse > Article
http://dx.doi.org/10.6106/JCEPM.2013.3.4.020

Variation Determinants in Building Construction: Ghanaian Professionals Perspective  

Asamaoh, Richard Oduro (CSIR-Building and Road Research Institute)
Offei-Nyako, Kofi (CSIR-Building and Road Research Institute)
Publication Information
Journal of Construction Engineering and Project Management / v.3, no.4, 2013 , pp. 20-25 More about this Journal
Abstract
Variation in construction means modification of design, changes in quality, quantity of work including the alteration of standard of materials or goods to be used in the work and the removal from site any kind of material not in accordance in the contract. In Ghana, Variation order has become major issue in the construction industry. This had resulted in cost overruns, delay and in some contracts dispute, between parties. The aim of this paper was to identify the root causes of variation; effects of variations on projects in Ghana and the means of reducing the impact of variation order. The method of the study involved literature review, primary data collection, interview and closed - ended- questionnaires. Mean Scores Method was used to rank the identified factors causing variation. Analysis Of Variance Test was use to test for the significant difference between means among the professional groups. The study revealed that most causes of variation were change of design by client and inadequate working details. Establishment of oversight project management committee and flow of information were identified as means of controlling variations during project administration.
Keywords
Variation; Major determinants; Effects; Minimizing Variations;
Citations & Related Records
연도 인용수 순위
  • Reference
1 J. Watson, "How to Determine a Sample Size: Tip sheet #60", University Park, PA: Penn State Cooperative Extension, 2001.
2 P.X.W. Zou, G. Zhang, J. Wang, "Understanding the key risks in construction projects in China", International Journal of Project Management, vol. 25, no. 6, pp. 601-614, 2007.   DOI   ScienceOn
3 http://www.arcghana.org/memberlist (assessed 23rd January, 2013)
4 http://www.ghie.org.gh (assessed 23rd January, 2013)
5 http://www.ghisonline.org/47/31/Registered-Members (assessed 23rd January, 2013)
6 A.O. Akinsola, K.F. Potts, I. Ndekugri, F.C. Harris, "Identification and Evaluation of Factors Influencing Variations on Building Projects", International Journal of Project Management, vol. 15, no. 4, pp. 263-267, 1997.   DOI   ScienceOn
7 F.M. Arain, S. Assaf, S.P. Low, "Causes of Discrepancies between Design and Construction", Architectural Science Review, vol. 47, no. 3, pp. 237-249, 2004.   DOI
8 F.M. Arain, S.P. Low, "The Potential Effects of Variation Order on Institutional Buildings Projects", Facilities, vol. 23, no. 11/12, pp. 496-510, 2005.   DOI   ScienceOn
9 F.M. Arain, S.P. Low, "Effective Management of Contract Variations using a Knowledge Based Decision Support System", Centre for Education in Built Environment, Working Paper No. 10, 2005.
10 D. Bower, "A systematic approach to the evaluation of indirect costs of contract variations", Construction Management and Economics, vol. 18, no. 3, pp. 263-268, 2000.   DOI
11 F.D.K. Fugar, A.B. Agyabvah-Baah, "Delays in building construction projects in Ghana", Australasian Journal of Construction Economics and Building, vol. 10, no. 112, pp. 103-116, 2001.
12 W. Gyadu-Asiedu, "Assessing Construction Project Performance in Ghana: Modeling Practitioners' and Clients' Perspectives", Dissertation, Eindhoven University of Technology, Netherlands, 2009.
13 G.D. Israel, "Determining Sample Size", Agricultural Education and Communication Department, UF/IFAS Extension, Fact sheet PEOD6,1992.
14 McGraw-Hill T. Ma, A. Olifent, J. Zuo, "Towards the minimization of variations in design and build projects", Proceedings of the 2010 Australasian Universities Building Education Association, 35th Annual Conference: AUBEA, pp. 1-13, 2010.
15 C.W. Ibbs, "Quantitative Impacts of Project Change: Special Issues", Journal of Construction Engineering and Management, vol. 123, no. 3, pp. 308-311, 2001.
16 P. Keane, B. Sertyesilisik, A. Ross, "Variations and Change Orders on Construction Projects", Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, vol. 2, no. 2, pp. 89-96, 2010.   DOI
17 S.M. Levy, "Project Management in Construction", 4th ed., Columbus, 2002.
18 N. Mohammad, A.I. Che Ani, R.A.O.K. Rakmat, M.A. Yusof, "Investigation on the Causes of Variation Orders in the Construction of Building Project - A Study in the State of Selangor, Malaysia", Journal of Building Performance, vol. 1, no. 1, pp. 73-82, 2010.
19 R. Ndihokubwayo, "An analysis of the impact of variation orders on project performance", Dissertation, Cape Peninsula University of Technology, South Africa, 2008.
20 R.S.M. Jawad, M.R.B. Abdulkader, A.A.A. Ali, "Variation Orders in Construction Projects", Journal of Engineering and Applied Sciences, vol. 4, no. 3, pp. 170-176, 2009.
21 R.V. Krejcie, D.W. Morgan, "Determining Sample Size for Research Activities", Educational and Psychological Measurement, vol. 30, pp. 607-610, 1970.   DOI
22 M. Sun, X. Meng, "Taxonomy for change causes and effects in construction projects", International Journal of Project Management, vol. 27, no. 6, pp. 560-572, 2009.   DOI   ScienceOn