THE STUDY OF MULI-LEVEL PERFORMANCE MEASUREMENT APPROACH FOR VALUE MANAGEMENT OF CIVIL INFRASTRUCTURE PROJECTS

  • Jong-Kwon Lim;Min-Jae Lee;Dong-Youl Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1294-1299
    • /
    • 2009
  • Best value in value engineering has relation to cost and performance. But a severe problem in VE study of a project is to reduce value due to loss of performance, caused by focusing on cost reduction. Also a lack of understanding performance concept, no trial VE workshop as well as cost saving-based policy have not satisfied customer needs. A efficient and practical methodology for accomplishing best value in construction projects is proposed. This study developed a more objective approach for performance measurement approach of mega projects and suggested a systematic process of performance quantitative analysis verifying value improvement. The proposed performance measurement method would be very useful for better communication and consensus between stakeholders and VE team especially through value engineering.

  • PDF

효과적인 설계VE 활동을 위한 기능분석 유형조사 (An investigation of Function Analysis patterns for the Effective VE at the Design Phase)

  • 민경석
    • 한국건설관리학회논문집
    • /
    • 제5권6호
    • /
    • pp.63-71
    • /
    • 2004
  • 설계VE 활동작업 중 대상의 기능을 철저하게 분석할 수 있는 기능분석 활동은 그 중요성에도 불구하고 수행자의 인식부족, 분석방법에 대한 어려움 및 설계VE 활동 시간적 제약 등의 이유로 활동 자체가 약화, 변형되거나, 생략되는 경우가 발생하고 있다. 이와 같이 기능분석이 변형된 VE활동은 아이디어 창출과정에 있어서 기능부분이 약화된채 아이디어의 결과를 창출함으로 신뢰성이 매우 떨어진다고 할 수 있다. 따라서 본 연구는 현재 시행되어진 설계VE작업중 기능분석활동 부분을 분석하여 이를 활동유형별로 분류, 그 특징을 파악한다. 이를 통해 기능분석 활동에 대한 올바른 이해를 확립하고, 기능분석 활동의 개선부분을 도출하여 올바른 설계VE 활동을 유도하고자 한다.

철도건설사업의 효율적인 VE수행을 위한 성능측정기법 (Performance Measurement Method for Efficient Value Engineering Study of Railroad Construction Project)

  • 임종권;박미연;박흥민;김성훈;이광균
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 춘계학술대회 논문집
    • /
    • pp.2242-2249
    • /
    • 2008
  • A severe problem in VE study of a project is to reduce value due to loss of performance, caused by focusing on cost reduction. Also a lack of understanding performance concept, no trial VE workshop as well as cost saving-based policy have not satisfied customer needs. A efficient VE job plan for especially large scale railroad construction project is proposed in this study. This study developed a more objective performance evaluation system for value engineering study of mega projects and suggested a systematic process of performance quantitative analysis for value improvement. The proposed performance measurement method would be very useful for better communication and consensus between decision makers and VE team.

  • PDF

민간투자사업을 위한 VE 적용방안 (Value Management of Private Finance Initiative Projects)

  • 임종권;김성일
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.123-130
    • /
    • 2006
  • 최근 정부는 임대형민간투자사업(BTL, Build Transfer Lease)방식을 적극 도입함으로써 민간의 축적된 지식과 경험을 이용하여 보다 효율적인 사회간접자본(Social Overhead Capital) 확충을 도모하고 있다. 공공부분 및 사업시행자 등 민간투자사업의 사업기획단계에서 운영단계에 이르기 까기 전문화된 기술과 경험을 바탕으로 한 설계를 통하여 시설물 사용자의 요구를 충족시키는 동시에 창의적 기법을 총동원 예산과 리스크 범위내에서 최대한의 효율과 수익 창출을 극대화하려는 노력이 필요하다. 이처럼 BTL등 민간투자사업의 투자가치(Value for Money)를 극대화시키기 위해서는 VM(Value Management) 방법론의 효과적인 사용이 불가피하다. 여기서는 BTL 사업에서의 "VE job Plan" 활용 절차 및 적용방안을 제시하였다. BTL 사업에서의 효율적인 "VE job Plan"을 제시하기 위하여 국내 민간투자사업 및 VE 추진을 위한 법적제도의 변화를 분석하였다. 국내 BTL 사업 수행절차 및 BTL 사업에서의 VE적용방안을 "VE job Plan"과 함께 제시하였다. 실제 적용사례 연구를 통하여 BTL 사업에서의 "VE job Plan"의 작성과 작성된 프로세서를 활용한 의사결정 및 대안평가 방법을 제시하였으며, 속성 중 비용은 LCC(Life Cycle Cost : 이하 LCC) 분석결과를 바탕으로 평가하였고, 프로젝트 기능개선을 위한 평가방법으로는 기술적 FAST도를 사용하여 분석하였다. 사례는 "대구시립미술회관" 사업자 선정을 위한 BTL VE 활동을 통해 보다 향상된 가능의 개선, 비용절감 및 양질의 서비스 수준을 제공한 VM사례를 소개하였다.

  • PDF

SEOUL TOLL PLAZA VALUE ENGINEERING STUDY CONSIDERING PERFORMANCE MEASUREMENT AND LIFE-CYCLE COSTS

  • Jong-Kwon Lim;Min-Jae Lee ;George Hunter;Sung-il Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.621-626
    • /
    • 2005
  • Recent increases in construction costs on Korean public works projects, largely due to change orders caused by poorly elaborated design, become a motivation of applying VE process in Korean construction industry. The Seoul Toll Plaza project, recently value analyzed by four VE teams, demonstrates how value management helps save time, money and increase functional performance. The objective of this project is to upgrade and expand existing pay and ticket booths system on "Kyungboo Express Highway", the main artery for the Korean peninsula linking Seoul to Pusan. The value management study generated several innovate alternatives capable of saving up to 50% of project cost from the baseline project plan.

  • PDF

농촌지역 아파트 공사 설계VE의 공간별 적용방법 분석 연구 (A study of analysis about application of design value engineering in the rural apartment building)

  • 민경석
    • 한국농촌건축학회논문집
    • /
    • 제8권1호
    • /
    • pp.17-24
    • /
    • 2006
  • The purpose of this study is to provide the systematic report and analysis about Apartment VE application in Design Phase. In this study, the method of VE application is classified into foure groups-changing materials, changing a method of construction, acceptance of new technology, and use of new device. The facts found in this study can be summarized as follows. Application rate of VE is highest in building circumference parts. The main reason would be that there are many applicable factors according to locations, types of work, etc. Parking lots also show similar results with the same reason. It means there are a lot of possibility to adapt value engineering in these steps during the work. So far application of value engineering has been so limited that just small changes of process or method have been tried. One reason is the lack of challenging and the other is some characteristics of construction work which is very difficult to fix after completion. In the future, it would be more efficient to apply new technology and new device in construction work. Though these attempts have been ignored in Korea so far, there are still lots of possibilities to be developed in value engineering.

  • PDF

공동주택 설계VE의 요구항목 분석을 통한 대상선정 체계화 모델 (A Systematization Model of the Design Phase VE Selection by the Analysis of the Required Items in the Apartment)

  • 정호근;양진국;이상범
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.1015-1018
    • /
    • 2007
  • VE는 여러 산업분야에서 지속적으로 요구되는 개선 목표를 달성하고 제한된 건설예산을 보다 효과적으로 관리하기 위해 사용되어온 체계화된 절차를 말한다. VE의 업무절차 중 준비단계의 주요 목적은 원활한 VE수행을 위하여 관련된 집단의 협력체계 구축과 공동목표 달성을 통하여 분석단계에서 요구되는 충분한 자료를 확보하는데 있다. 그리고 사용자 및 발주자 등 프로젝트 이해당사자들의 요구를 측정하는 데는 주로 품질모델(Quality Model)이 사용되며, 이러한 품질모델은 VE활동 시 대안이 발주자의 요구에 적합한지를 확인할 수 있는 평가척도로 활용된다. 하지만, 현행 준비단계 업무는 단순히 발주자 및 사용자의 요구사항을 확인하는 수준이며, 이를 통해서 대상선정 및 기능분석 단계의 명확한 목표 및 방향제시를 해주지 못하고 있다. 이에 본 연구에서는 사례분석과 전문가 설문조사 및 면담조사를 실시하여 현행 준비단계 업무의 문제점을 분석하고, 각 주체별 요구항목을 정확히 파악하여 새로운 대상선정 모델을 제안하고자 한다.

  • PDF

공동주택의 설계VE단계에서 주체별 요구항목 분석을 통한 대상선정 개선방안 (Improved Method for VE Items Selection by Analysing the Required Items of Stakeholder on the Apartment in Design Phase)

  • 정호근;양진국;이상범
    • 한국건설관리학회논문집
    • /
    • 제9권4호
    • /
    • pp.111-119
    • /
    • 2008
  • VE는 대상 시설물의 가치향상을 위하여 설계내용에 대한 경제성 및 현장적용 타당성을 기능별, 대안별로 검토하는 체계화된 절차를 말한다. VE의 업무절차 중 준비단계의 주요 목적은 원활한 VE수행을 위하여 관련된 집단의 협력체계 구축과 공동목표를 달성하기 위하여 분석단계에서 요구되는 충분한 자료를 확보하는데 있다. 그리고 사용자 및 발주자 등 프로젝트 이해당사자들의 요구사항을 측정하는 데는 주로 품질모델(Quality Model)이 사용되며, 이러한 품질모델은 VE활동 시 대안이 발주자의 요구사항에 적합한지를 확인하는 평가척도로 활용된다. 하지만, 현행 준비단계 업무는 단순히 발주자 및 사용자의 요구사항을 확인하는 수준이며, 이를 통해서 대상선정 및 기능분석단계의 명확한 목표 및 방향을 제시해주지 못하고 있다. 이에 본 연구에서는 사례분석과 전문가 설문조사 및 면담조사를 실시하여 현행 준비단계 업무의 문제점을 분석하고, 각 주체별 요구항목을 정확히 반영한 새로운 대상선정 모델을 제안하고 사례를 통해 효용성을 검증하였다.

VE 대상선정을 위한 평가항목의 가중치결정방법에 관한 연구 (A Study on the Subject Selection of VE Using Decision Weights Techniques)

  • 윤동진;신병윤;정용식;이상범
    • 한국건축시공학회지
    • /
    • 제5권3호
    • /
    • pp.83-90
    • /
    • 2005
  • Was used at step space-time mainly after VE technique sponsors in domestic in the 1960s but have been expanded to design step recently. Possibility of value elevation or cost reduction must choose member that is effectively for active and effective application of VE technique. In this study, when enforce design VE examining for weight decision corrosion protection been using in weight grant composition estimation technique, target choice process wishes to suggest formality and method that can be achieved effectively Main conclusion of this study sorts valuation items step by step for weight appropriation of valuation basis and give point on article of high position point after expert which employer is included estimates article by low rank step and this presented high position method that do union item by item and establishes by item weight. Did these techniques for giving weights so that importance for weight appropriation developed estimation program, and data save of target estimation standard and target estimation standard is possible using straight sit.

VE 대상선정을 위한 평가항목의 가중치 결정방법에 관한 연구 (A Study on the Subject Selection of VE Using Decision Weights Techniques)

  • 유형한;배수용;황재우;윤동진;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2005년도 춘계 학술기술논문발표대회 논문집
    • /
    • pp.149-155
    • /
    • 2005
  • Was used at step space-time mainly after VE technique sponsors in domestic in the 1960s but have been expanded to design step recently. Possibility of value elevation or cost reduction must choose member that is effectively for active and effective application of VE technique. In this study, when enforce design VE examining for weight decision corrosion protection been using in weight grant composition estimation technique, target choice process wishes to suggest formality and method that can be achieved effectively. Main conclusion of this study sorts valuation items step by step for weight appropriation of valuation basis and give point on article of high position point after expert which employer is included estimates article by low rank step and this presented high position method that do union itembyitemandestablishesbyitemweight. Did these techniques for giving weights so that importance for weight appropriation developed estimation program, and data save of target estimation standard and target estimation standard is possible using straight sit.

  • PDF