Enhancing Work Trade Image Classification Performance Using a Work Dependency Graph (공정의 선후행관계를 이용한 공종 이미지 분류 성능 향상)

  • Jeong, Sangwon;Jeong, Kichang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.106-115
    • /
    • 2021
  • Classifying work trades using images can serve an important role in a multitude of advanced applications in construction management and automated progress monitoring. However, images obtained from work sites may not always be clean. Defective images can damage an image classifier's accuracy which gives rise to a needs for a method to enhance a work trade image classifier's performance. We propose a method that uses work dependency information to aid image classifiers. We show that using work dependency can enhance the classifier's performance, especially when a base classifier is not so great in doing its job.

Development of the procurement system for Just-in-Time Building Construction (건설공사 적시생산(Just-ln-Time)을 위한 조달시스템 개발 - 콘크리트 타설 공사를 중심으로 -)

  • Shin Bong-Soo;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.235-244
    • /
    • 2004
  • The effective management of major construction resources is the key to the success in high-rise residential building construction projects. It is even more important and challenging as well especially in CBD(central business district) area under tight project duration since little leeway in interface between construction trades, severe constraints in staging n and heavy demands for lifting among construction resources. In order to meet high demands among major construction resources, highly effective construction resource management information system is required This research develops and provides a system which selects and disseminates these information from each phase of procurement transportation, lift-up and storage for major construction resources This research applies the Kanban system, well recognized material information system technique in automobile manufacturing industry, in concrete work processes. It develops concrete procurement information system utilizing VSM(Value Stream Mapping) and also applies the model in actual super-high rise residential building construction project in order to analyze the benefit of the research model.

Review of Qualitative Approaches for the Construction Industry: Designing a Risk Management Toolbox

  • Zalk, David M.;Spee, Ton;Gillen, Matt;Lentz, Thomas J.;Garrod, Andrew;Evans, Paul;Swuste, Paul
    • Safety and Health at Work
    • /
    • v.2 no.2
    • /
    • pp.105-121
    • /
    • 2011
  • Objectives: This paper presents the framework and protocol design for a construction industry risk management toolbox. The construction industry needs a comprehensive, systematic approach to assess and control occupational risks. These risks span several professional health and safety disciplines, emphasized by multiple international occupational research agenda projects including: falls, electrocution, noise, silica, welding fumes, and musculoskeletal disorders. Yet, the International Social Security Association says, "whereas progress has been made in safety and health, the construction industry is still a high risk sector." Methods: Small- and medium-sized enterprises (SMEs) employ about 80% of the world's construction workers. In recent years a strategy for qualitative occupational risk management, known as Control Banding (CB) has gained international attention as a simplified approach for reducing work-related risks. CB groups hazards into stratified risk 'bands', identifying commensurate controls to reduce the level of risk and promote worker health and safety. We review these qualitative solutions-based approaches and identify strengths and weaknesses toward designing a simplified CB 'toolbox' approach for use by SMEs in construction trades. Results: This toolbox design proposal includes international input on multidisciplinary approaches for performing a qualitative risk assessment determining a risk 'band' for a given project. Risk bands are used to identify the appropriate level of training to oversee construction work, leading to commensurate and appropriate control methods to perform the work safely. Conclusion: The Construction Toolbox presents a review-generated format to harness multiple solutions-based national programs and publications for controlling construction-related risks with simplified approaches across the occupational safety, health and hygiene professions.

Constructionarium: Turning Theory Into Practice

  • Stevens, Julia
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1220-1220
    • /
    • 2022
  • Constructionarium Ltd is a not-for-profit organisation which delivers a residential, experiential, immersive learning opportunity to university students from across the built environment education sector. Since 2002, the Constructionarium education model has been available to students in engineering, construction management and architecture at a purpose built, 19-acre multi-disciplinary training facility in Bircham Newton, England simulating real site life and reflecting site processes, practices and health and safety requirements. The unique approach of Constructionarium puts experiential learning and sustainability at the heart of everything. In a week, students develop a practical understanding of the construction process, develop transferable skills, build a team and are exposed to the latest in sustainable technologies. Experiential learning is what differentiates a Constructionarium project from regular field trips or site visits. At Constructionarium the focus is on learning by participation rather than learning through theory or watching a demonstration. The projects cannot be replicated in a classroom or on campus. Using the hands-on construction of scaled down versions of iconic structures from around the world, students learn that it requires the involvement of the whole construction team to successfully complete their project. Skills such as communication, planning, budgeting, time management and decision making are woven into a week-long interrelationship with industry professionals, academic mentors and trades workers. Working together to enhance transferable skills brings the educational environment into the reality of completing an actual construction project handled by the students. Constructionarium has used this transformational learning model to educate thousands of students from all over the United Kingdom, Europe and Asia. Texas A&M University in the United States has sent multiple teams of students from its Department of Construction Science every operational year since 2016.

  • PDF

A Study on the Tact Management Using a Daily Report Information (작업일보 정보를 이용한 택트공정관리방안 연구)

  • Kim Sun-Kuk;Na Kwang-Soo;Kim Tea-Hui;Yu Jung-Ho;Lee Hyun-Soo;Kim Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.80-87
    • /
    • 2003
  • Recent construction projects, characterized by its complication and high-tech, requites highly efficient management efforts. Among others, labor management is very important due to various trades and increasing number of activities. Along with advanced information technology, Web-based construction site management systems are widely adopted in order to improve the efficiency of construction management. However, such information systems have mainly 2 (two) shortcomings. One is that the existing systems were developed and implemented not in subcontractor-centered way but in main contractor-centered way, though the daily construction information is mainly generated, gathered and reported by subcontractors. As a result, subcontractors seldom have access to such information systems. The other is that loss or omission of information may uclw during the information processing process, in which subcontractors have no direct access to such information system. This becomes a major reason of losing the reliability of the information in daily construction report. As a solution for these problems, this paper suggests a Web-based information system that is subcontractor-oriented and also suitable for tact schedule management.

Development of the lift-up and procurement system for Just-in-Time in the Building Construction (건설공사의 적시생산(Just-In-Time)을 위한 양중시스템 개발)

  • Shin Bong-Soo;Kim Chang-Duk;Suh Sang-Wook;Lim Hyoung-Chul;Choi Woon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.182-191
    • /
    • 2003
  • The material lift-up and procurement management for high-rise buildings is complex and critical key to the success of projects. It has been hardly managed by the heuristic or rule-of-thumb techniques which are adapted in usual construction building sites. Especially in downtown high-rise residential building project sites, the limit of heuristic management techniques is critical. It has space constraint for materials loading and site transportation especially in finish work phases in which construction period diverse work trades struggle for their own material and manpower transportation. Hence, it is essential to adapt JIT(Just-In-Time) concept in these particular types of building construction project sites. According to the analysis of the case project sites, the communication and flow of relevant information regarding material lift-up and transportation in project sites is the key factor for successful performance. Therefore, this study analyzes the flow and site transportation of the key materials and provides the system, PLUTO(Procurement & Lift-Up for material Transport Optimizing system). This study also applies the system in the case site and verifies the model validation in actual project.

Efficient Application of Multi-Trade Contract Method to Public Construction Project (공공건설사업 직할시공제 적용의 문제점 및 효율적 적용 방안)

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.35-44
    • /
    • 2013
  • Multi-trade Contract Method was introduced as a means of cutting down construction cost of public housing for low income people. Before a specific project delivery method is applied to large public construction project, it is necessary to discuss all the issues raised up from all the parties in construction industry and all the issues which can impact project performance. Thus the interviews were conducted with industrial professionals from diverse organizations and previous studies were investigated to figure out how this newly introduced project delivery method may impact owner's role and responsibility and project performance in terms of cost, schedule, quality and risk. Under the Multi-trade Contract Method, project owner's management tasks will be highly increased, so it should be checked out if the owner can do its role and responsibility. Public owner's organization also needs to be changed and proper project management procedure and system need to be established. In addition, for efficient application of Multi-trade Contract Method, public owner should consider diverse management approach to deliver the project, and how to select and maintain qualified specialty trades.

A Model for Assessing Maximum Overtime Rate in Labor Subcontracting Practices

  • Nassar, Khaled;Hosny, Ossama
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.2
    • /
    • pp.18-27
    • /
    • 2012
  • Despite the rapid development in the construction industry due to the changing new technologies, many projects still fail to meet target deadlines. Shortage in manpower and skilled laborers is one of the main reasons for such delays. Markets with high economic growth and economic expansion (such as Gulf Countries in the Middle East) may have pronounced labor the shortages. Labor subcontracting practices are used sometimes to increase production rates and meet project deadlines. This paper explains and analyses labor subcontracting practices currently being used in many places around the world (and especially in the Gulf Countries) and in particular defines a maximum overtime rate for laborers in the laborer-subcontracting method ensuring that the contractor gains both the time saved during overtime and also reduces the cost per unit produced. The mathematical model used formalizes a closed-form equation for overtime pay in similar situations and as such can be applicable worldwide. Data was collected from representative projects that employed such practices from various trades. Validation of the model and formula has been tested successfully by analyzing historic data. The results prove that contractors often do not reach the optimum use of their practices resulting in a higher cost per unit. The presented model and the analysis should be of interest to many contractors currently involved in the practice or considering its use and to those who wish to find new methods that would help in eliminating as much wastes as possible by allocating their resources in the most efficient way.

Finding on Preventive Intervention of Fatal Occupational Injuries Through Empirical Analysis of Accident Death (사고사망자의 심층적 실증분석을 통한 예방적 개입점 발견 연구)

  • Yi, Kwan Hyung;Rhee, Hong Suk
    • Journal of the Korean Society of Safety
    • /
    • v.34 no.3
    • /
    • pp.83-88
    • /
    • 2019
  • The 7,993 cases of Survey Report of Fatal Industrial Accidents conducted jointly by the MEOL and the KOSHA for the recent seven years(2007-2013) were categorized according to personal and occupational characteristics, industry types, business sizes, job types, activities at the time accident, types of accidents, material agents(assailing materials), unsafe conditions, and unsafe acts. And it is found that among the 72.2 percent of fatal occupational accidents in the construction and manufacturing industries are caused by falling, sticking, bumping and being caught under objects & overturning. For this study, through the empirical analysis on causes of fatal industrial accidents, was used to identity high risk groups based on total data of 7,993 victims of occupational accidents. An annual fatal occupational injury (FOI) rate per 10,000 workers was about 0.47‱. The middle-aged group and the elderly group showed the highest FOI rates per 10,000 workers (0.73‱, 0.80‱), and the daily workers showed the highest FOI rate (1.46‱), and the craft and related trades workers showed the highest FOI rate (2.17‱). In case of industry type the mining industry (7.26‱) showed the highest FOI rate, followed by the sewerage, waste management, materials recovery and remediation activity industry (3.91‱) and the construction industry (2.71‱). The primary high risk target group that requires a strategy designed to reduce fatal occupation injuries caused by falling and bumping & contact(collision) is the construction industry, and the secondary high risk target group in the construction industry is classified as the equipment, machine operating and assembling workers in the construction industry, those aged 50 years old and above need the prevention measures against bumping & contact(collision) and being caught under an object & falling(objects), while those aged less than 50 years old need prevention measures against falling(persons).

Study on Processing Properties for Improving the Utilization of Food Resources (식품자원의 활용가치 향상을 위한 가공적성 연구)

  • Kim, Young-Boong
    • Food Science and Industry
    • /
    • v.49 no.2
    • /
    • pp.51-55
    • /
    • 2016
  • The needs to develop high value-added foods are expanding due to the trends of food market, such as importance of food security by enlarged international free trades and expanded market size for processed foods. However, our home country exhibits limit transport to development of new products and high-value added area compared to other advanced countries. For this reason Ministry of Agriculture, Food and Rural Affairs and Institute of Planning and Evaluation for Technology have launched "High Value-Added Food Technology Development Program" for improvement of value of food resources for practical use since 2013. The program contains research to increase the values of agricultural and animal resources and the construction of database. Main research topics are studies in pretreatment techniques to improve the values of agricultural and animal resources, improvement of acceptability, and processing qualities that would be engrafted on materializaton and commercialization technologies. In addition the construction of a consolidated database regarding the research achievements is included in the program. Currently, studies in processing qualities for about 30 food materials re under progress, being suitable for materialization, for examples drying, fermentation, grinding, heat-treatment, and so on. The research results are provided in public through the consolidated database website after reconstruction in the form of united database format. To date the database containing the about 300 of research contents for process qualities has been constructed.