A Study on the Tact Management Using a Daily Report Information  

Kim Sun-Kuk (경희대 대학원)
Na Kwang-Soo (경희대 대학원)
Kim Tea-Hui (서울대 대학원)
Yu Jung-Ho (경희대 토목건축대학)
Lee Hyun-Soo (서울대 건축학과)
Kim Chang-Duk (광운대 건축공학부)
Publication Information
Korean Journal of Construction Engineering and Management / v.4, no.4, 2003 , pp. 80-87 More about this Journal
Abstract
Recent construction projects, characterized by its complication and high-tech, requites highly efficient management efforts. Among others, labor management is very important due to various trades and increasing number of activities. Along with advanced information technology, Web-based construction site management systems are widely adopted in order to improve the efficiency of construction management. However, such information systems have mainly 2 (two) shortcomings. One is that the existing systems were developed and implemented not in subcontractor-centered way but in main contractor-centered way, though the daily construction information is mainly generated, gathered and reported by subcontractors. As a result, subcontractors seldom have access to such information systems. The other is that loss or omission of information may uclw during the information processing process, in which subcontractors have no direct access to such information system. This becomes a major reason of losing the reliability of the information in daily construction report. As a solution for these problems, this paper suggests a Web-based information system that is subcontractor-oriented and also suitable for tact schedule management.
Keywords
Framework; Materials Take-off; Algorithm;
Citations & Related Records
Times Cited By KSCI : 5  (Citation Analysis)
연도 인용수 순위
1 한국건설기술연구원(2002) 다중 현장관리 및 현장간 협엽 체계구축을 위한 멀티미디어형 지식관리 시스템 개발, 건설교통부
2 김태완외(2002), 생산성 달성율을 이용한 생산성 관리 방안, 대한건축학회추계학술대회 22권2호, pp499-502
3 손창백외(2002), 건축공사의 생산성 저하요인 분석, 대한 건축학회논문집 18권12호, pp125-132
4 임형철외(2001) , 조직위계에 따른 건설공정현황의 관리기 법 개발, 대한건축학회논문집 17권10호, pp121-128
5 이한민외(1997), 건설공사현장 진척정보시스템 개발에 관 한 연구, 대한건축학회논문집 13권1호, pp213-221
6 대림산업(1998), 현장정보수집용 관리시스템 개발에 관한 연구
7 조훈희외(2001), 공사실적정보 축적을 위한 작업일보 기반의 현장관리시스템 개발, 대한건축학회논문집 17권11호, pp123-130
8 Z.M.Deng et.al (2001), An application of the Internet-based project management system, AUTOMATION INCONSTRUCTION, pp239-246
9 Mireille G.Battikha(2002), Computer-Based System for Construction Quality Management, JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, pp164-173
10 유정호외(2002), 건설 프로젝트의 생산성 관리 시스템, 대한건축학회논문집 18권7호, pp103-113
11 한국건설관리학회(2003) 택트 공정관리 프로세스 개선 및시스템 개발
12 김영재 외(2003), 건축공사 마감공기 단축을 위한 택트공정관리 프로세스 모델, 대한건축학회논문집 19권l호, pp161-168
13 한택건설관리학회(2002) 사무소건축긔 마감공기 단축을 위한 영향요인 분석 및 관리기법에 관한 연구
14 김용수외(1996), 국내 건축공사 현장의 공정관리 현황 및 문제점 분석에 관한 연구, 대한건축학회논문집 12권12호, pp253-264
15 송상훈외(2003), 건설현장 공사관리 프로세스 개선방안, 대한건축학회논문집 19권2호, pp149-158
16 김봉년 외(2003), 작업일보 현황 분석에 따른 개선방향 제시, 한국건설관리학회논문집, 제4권 제2호 통권 제14호, pp.66-73