• Title/Summary/Keyword: Construction Tool

Search Result 1,426, Processing Time 0.033 seconds

Development of Performance Indicators for Construction IT Tool based on BSC (건설 정보화 시스템의 BSC기반 성과지표 개발)

  • Kang, Leen-Seok;Kim, Hyeon-Seung;Moon, Hyoun-Seok;Kim, Chang-Hak;Lee, Dong-Wook
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.3220-3225
    • /
    • 2011
  • Current IT Tools for construction project have been developing to satisfy the requirements of improving productivity and quality. Especially, the critical technology of the construction IT tools is the BIM (Building Information Modeling) which integrates and controls the construction information by modeling the structures in the virtual environment. Many domestic studies have been performed for developing various BIM tools and these have been demonstrated through a successful case study. However, because of the most studies focused on architecture and major construction firms, small construction firms are very difficult to utilize a BIM tool without a verification of it. To resolve these problems, this study suggests performance indicators to quantitatively assess the utilization of 4D CAD which is one of the representative BIM tools by BSC (Balanced Score Card). This performance indicator will be used as a measurement for applying IT tools in Construction Project.

  • PDF

A Modified-AHP Method of Productivity Analysis for Deployment of Innovative Construction Tools on Construction Site

  • Kwon, Soonwook;Lee, Gaeyoung;Ahn, Dooyong;Park, Hee-Sung
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.1
    • /
    • pp.45-50
    • /
    • 2014
  • Productivity analysis is the most important and significant method for evaluating management and engineering performance during whole project stage. However, it is very difficult in developing qualitative index to construction industry comparing to other industries. Therefore, analytical hierarchy process (AHP) is one of the methods for overcoming these limitations by checking consistency index using duality comparison. In this study, it is scraped up an application plan and selection for innovative tools by analyzing survey results on tool users and site managers with respect to using Modified-AHP performance measurement method.

RISK FRAMEWORK FOR NEXT GENERATION NUCLEAR POWER PLANT CONSTRUCTION

  • John Walewski ;Stuart Anderson;Jaeheum Yeon;Amy Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.451-458
    • /
    • 2013
  • This research documents the initial findings and recommendations for developing a risk management tool to assess and quantify the risks associated with the construction of the next generation of nuclear power plants. The proposed tool builds upon the Construction Industry Institute's International Project Risk Assessment (IPRA) Best Practice. This paper provides an overview of the investigation to assess the unique risk elements pertaining to nuclear power plant construction and documents the preliminary findings from historical project performance data to better understand the function and use of the IPRA's Relative Impact value.

  • PDF

A Study on the Possibility to Use Christopher Alexander's Pattern Language by Using Network Analysis Tool (연결망 분석도구를 이용한 크리스토퍼 알렉산더 패턴언어 활용 가능성에 관한 연구)

  • Jung, Sung-Wook;Kim, Moon-Duck
    • Korean Institute of Interior Design Journal
    • /
    • v.25 no.3
    • /
    • pp.31-39
    • /
    • 2016
  • This study is aimed to increase the possibility of using the Christopher Alexander's pattern language. The methodology of this study is (i) to analyze the pattern language by using the network analysis tool in order to understand the complicate network structure of the pattern language, and (ii) to apply the Alexander's method of using the pattern language by using the network analysis tool (Gephi) and to examine the feasibility of the network analysis tool as a tool for using the pattern language. Firstly, as a result of analysing the pattern language, (i) the pattern language classified by pattern number is distinguished by the patterns of towns, buildings and construction, among which the pattern of buildings plays a key function in the networks; (ii) the buildings functions a medium connecting between the towns and the construction; and (iii) the pattern language is divided into 6 sub-modules, through which the user can select a pattern. Secondly, the result of using the network analysis tool as a tool for using the pattern language (i) suggests the new method of using the pattern language by using the network analysis tool (Gephi); (ii) makes it possible to easily figure out the characteristics of the links between the patterns; and (iii) increases the completeness of the pattern language by making it easy to find out the sub-patterns in selecting a pattern.

A Study on the Development Direction of a BIM Performance Assessment Tool (BIM 수행성과 평가도구의 개발방향에 대한 연구)

  • Kang, Tae Wook;Won, Jongsung;Lee, Ghang
    • Spatial Information Research
    • /
    • v.21 no.1
    • /
    • pp.53-62
    • /
    • 2013
  • The purpose of this study is to suggest the development direction of a BIM performance assessment tool. To do this, a series of focused group interviews were conducted with BIM experts in South Korea regarding the objective, characteristic, potential problems of a BIM performance assessment tool. A survey questionnaire was developed based on the focused group interviews and distributed to practitioners through four different occasions. The survey results showed that there were the significant differences between practitioners by their field and years of experience about the objective, characteristic, potential problems of a BIM performance assessment tool. Based on the survey results, the consideration factors for developing a BIM performance assessment tool was suggested.

A Study On the Predicting Method of the EAC according to the Performance Index of Construction Projects (건설공사 수행에 따른 최종공사비 예측방법에 관한 연구)

  • Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.4
    • /
    • pp.105-112
    • /
    • 2002
  • The EVMS(Earned Value Management System) comes from C/SCSC which was first released by the United States Department of Defense in December 1967, and preyed very powerful and efficient project management tool from a lot of practices. Although it is an excellent tool, we can not be succeed appling foreign system due to the differences of construction culture and law between the Korean and US construction industries. EAC(Estimate at Completion) is one of the most important functions in the EVMS. The purpose of this study is to propose the improved EAC method according to the performance indices better than old that and to prove from examples. In advance, the improved EAC method is to estimate more exactly costs and to promote efficiency in construction projects.

BALANCED SCORECARD PERFORMANCE MEASUREMENT AND CONTRACTOR SELECTION USING A WEB-BASED SYSTEM

  • J. Johnson;V. Peansupap;S. Jayasena
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.259-268
    • /
    • 2007
  • In a very competitive construction business environment there is a need to measure and manage business performance across a wider spectrum of business success criteria. The Balanced Scorecard (BSC) and Triple Bottom Line (TBL) reporting concepts are emerging as champions in the race for sustainable business success. The construction business organisations are often judged based on their financial performance as well as wider performance. This paper aims at developing a universally accepted tool for assessing contractors' wider business performance in the construction industry. A prototype of web-based business performance measurement system has been developed to help contractors assess their own performance aimed at uplifting their performance. The consultants/clients can also use the tool to measure contractors' performance in a value-based contractor selection. The system was developed based on the research conducted among 63 senior construction professionals and therefore further research with the participation of a large number of managers across different countries and also an upgrade of the system will be required.

  • PDF

DEVELOPMENT OF A FRONT END PLANNING TOOL FOR SUSTAINABILITY

  • Sang-Hoon Lee;Spencer Howard;Lingguang Song;Kyungrai Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.506-513
    • /
    • 2009
  • The Construction Industry Institute (CII) developed the Project Definition Rating Index (PDRI), as a part of their Front End Planning best practices, which helps project managers assess and measure project scope definition risk elements. U.S. Green Building Council are seeing the benefits of sustainable building and Leadership in Energy and Environmental Design certification by positively impacting life cycle costs, building marketability, and organizational productivity. However, there have been no efforts to integrate these two planning tools in construction industry. By applying a supplemental tool which combines the PDRI with the LEED rating system, construction industry can develop and implement a tailored instrument that leads to total project success in sustainability. The objective of this research is to assemble a new front end planning mechanism for green buildings by incorporating the current PDRI and LEED systems.

  • PDF

A Blockchain Network Construction Tool and its Electronic Voting Application Case (블록체인 자동화도구 개발과 전자투표 적용사례)

  • AING TECKCHUN;KONG VUNGSOVANREACH;Okki Kim;Kyung-Hee Lee;Wan-Sup Cho
    • The Journal of Bigdata
    • /
    • v.6 no.2
    • /
    • pp.151-159
    • /
    • 2021
  • Construction of a blockchain network needs a cumbersome and time consuming activity. To overcome these limitations, global IT companies such as Microsoft are providing cloud-based blockchain services. In this paper, we propose a blockchain-based construction and management tool that enables blockchain developers, blockchain operators, and enterprises to deploy blockchain more comfortably in their infrastructure. This tool is implemented using Hyperledger Fabric, one of the famous private blockchain platforms, and Ansible, an open-source IT automation engine that supports network-wide deployment. Instead of complex and repetitive text commands, the tool provides a user-friendly web dashboard interface that allows users to seamlessly set up, deploy and interact with a blockchain network. With this proposed solution, blockchain developers, operators, and blockchain researchers can more easily build blockchain infrastructure, saving time and cost. To verify the usefulness and convenience of the proposed tool, a blockchain network that conducts electronic voting was built and tested. The construction of a blockchain network, which consists of writing more than 10 setting files and executing commands over hundreds of lines, can be replaced with simple input and click operations in the graphical user interface, saving user convenience and time. The proposed blockchain tool will be used to build trust data infrastructure in various fields such as food safety supply chain construction in the future.

A Development of performance criteria tool for lightweight dry wall (건식경량벽체 요구성능 도출 도구 개발에 관한 연구)

  • Ji, Suk-won;Yoon, Sang-chun;Choi, Soo-kyung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.215-216
    • /
    • 2019
  • The following conclusions were reached through the research on the development of the required performance extraction tools for the application and utilization of various construction methods of lightweght dry wall. 1) Performance required for walls of apartment buildings can be divided into safety, habitation, durability and productivity. Among these, horizontal load resistance, shock resistance, anti-seismic performance, insulation, and acoustic characteristics are the main performance that correspond to dry walls. In addition, safety related to toxic gases and contaminants are required according to recent eco-friendly requirements. 2) To select a wall according to the required performance of an inner wall applied to an apartment, a map tool in the form of 2D matrices was constructed to enable the required performance to be applied, indicating that the wall location and wall material and its differentiating according to the old method.

  • PDF