As issued the development of energy resources, EPC work process through the IT technology is essential for efficient business management, and systematic management of data generated in this process is needed. In domestic, the research related to system development for the collection and management of construction data detected in the field has been done continuously, but pipeline business target the long-distance in extreme cold weather, almost no cases have been studied up to now. Therefore, this research is aimed to derive the data item for efficient management in EPC Stage of pipeline business in extreme cold weather. WBS system of EPC work are classified easily at two levels, data items can be divided based on the type of document. In the future I will be expected to be the foundation of the systematic management of data generated in the EPC step-by-step of pipeline business.
HOSSEN, MUHAMMED MUFAZZAL;KANG, SUNKOO;KIM, JONGHYUN
Nuclear Engineering and Technology
/
제47권3호
/
pp.362-379
/
2015
In this study, Nuclear Power Plant (NPP) construction schedule delay risk assessment methodology is developed and the construction delay risk is assessed for turnkey international NPP projects. Three levels of delay factors were selected through literature review and discussions with nuclear industry experts. A questionnaire survey was conducted on the basis of an analytic hierarchy process (AHP) and Relative Importance Index (RII) methods and the schedule delay risk is assessed qualitatively and quantitatively by severity and frequency of occurrence of delay factors. This study assigns four main delay factors to the first level: main contractor, utility, regulatory authority, and financial and country factor. The second and the third levels are designed with 12 sub-factors and 32 sub-sub-factors, respectively. This study finds the top five most important sub-sub-factors, which are as follows: policy changes, political instability and public intervention; uncompromising regulatory criteria and licensing documents conflicting with existing regulations; robust design document review procedures; redesign due to errors in design and design changes; and worldwide shortage of qualified and experienced nuclear specific equipment manufacturers. The proposed combined AHP-RII methodology is capable of assessing delay risk effectively and efficiently. Decision makers can apply risk informed decision making to avoid unexpected construction delays of NPPs.
In this paper, development of TIM Module for constructing PDM will be introduced. Technical information relevant product data influences cost, quality, precision and productivity. One of the very important feature of product data is organizing not by oneself but very closed to many technical information such as document, file, image and analysis sheet. To manage various technical information, several kinds of management system are used in multi level of production system. PDM and TIM systems are being developed for suitable purpose and are in need of Network technology, Information Technology, Database, sharing and distributing information. Developed TIM system is based on Web environment. By using this system, we can manage systematic technical information and reduce cost for constructing PDM system. And also we will put to practical use another technical information management system for mold plant.
International Journal of Knowledge Content Development & Technology
/
제13권4호
/
pp.119-137
/
2023
In this study, it was intended to explore a way to build a DB which links the resources and areas and regions already registered as cultural assets in connection with a project which is newly building local culture and arts resources. Towards this end, this study first identified the type and scale of existing local culture and arts resources that could be linked. Following which, to link the local cultural resources and collected cultural assets, this study investigated the websites such as the Cultural Heritage Administration's National Cultural Heritage Portal, municipal and provincial tangible cultural festivals, municipal and provincial intangible cultural assets, and Gyeonggi Memory. Furthermore, this study identified the amount of information sources to be built and the current status of each information source to identify detailed information sources. Finally, the metadata of local culture and arts resources were presented by classifying them into material and publication data metadata, document metadata, audiovisual metadata, oral recording metadata, village information metadata, and personal information village information metadata.
건설사업정보시스템은 국토교통부에서 건설사업정보화(CALS)의 일환으로 구축된 정보시스템으로 건설사업 전 업무단계의 디지털화, 정보 공유 등을 통해 건설사업의 생산성과 효율성 향상 및 투명행정을 실현하는데 목적을 두고 있다. 건설사업정보시스템은 국토부 내부 업무시스템 중 하나로 업무처리 위주의 기능과 데이터 관리에 중점을 두고 구축되어 운영 중에 있다. 하지만 구축된 지 10년 이상 경과된 정보시스템으로 주로 텍스트 및 문서위주의 건설사업정보로 이루어지고, 시각화 된 공간정보(Geographic Information System, 이하 GIS)와 결합되지 못해 정보 공유 및 전달과 전체적인 현황 파악에 한계를 가진다. 본 연구는 기존 건설사업정보시스템의 한계 및 문제점을 해결하고 시스템을 보다 고도화를 위한 방안으로 국내외 GIS 기술동향 및 관련 정보시스템을 살펴보고, 건설사업정보시스템의 현황 및 문제점을 분석하였다. 이를 통해 건설사업정보시스템의 고도화를 위한 전체적인 GIS 적용방안을 제시하였다. 또한 건설사업정보 단위시스템별 세부 활용 및 적용방안을 도출하고 향후 GIS 적용에 따른 고려사항을 분석하여 제시하였다.
최근의 인터넷 정보검색은 방대한 정보의 수용과 지능적이고 개인화된 검색 결과 요구라는 사뭇 상반된 요구를 만족시켜야 한다. 기계적으로 키워드를 매칭시켜 나오는 문서를 사용자에게 맡기는 식의 검색은 더 이상 환영을 받지 못한다. 우리는 이러한 추세에 맞추어 의미기반 정보검색에 필요한 개념망과 정답문서집합으로 구성된 지식베이스를 제안한 바 있다. 본 논문에서는 방대한 구조의 개념망과 연결되는 정답문서집합을 유동적인 인터넷 환경에 적용하기 위해 자동으로 구축하는 시스템을 제시한다. 자동구축은 문서분류(document categorization) 기술을 활용하여 개념어에 문서를 할당하는 방법과 속성에 문서를 할당하는 방법으로 나누어 이루어진다. 제시한 방법은 실험을 통하여 기본적인 속성 할당에는 상당한 효과가 있는 것으로 판단되었고, 일부 미할당 문서에 대해서는 클러스터링과 같은 다른 알고리즘이 필요하다.
The command of Subway is intended to adjust and control the train operation, and to play a key role of the total passenger transport and all kinds of affairs related to the safe train operation. Also, this can be considered as affairs to be controlled and operated by Total Traffic Control. For the purpose of developing the ATO system in using the new control technology by substituting the conventional ATS equipment, this technical document includes the technical points resulted from doing the replacement construction in the entire section of Subway Line 2 by Seoul Metro. The replacement work with the new ATO System should neither stop nor affect the system under operation while operating the current ATS System. The different systems should not interfere with each other while performing their individual affairs, and be composed to share the important data for the parallel operation. This technology is needed to proceed in assurance of a high degree of reliability.
Comprehensive landscape architectural services provided from schematic design through construction document for this 22,000 square foot, linear, urban rooftop garden situated on top of an in-ground parking garage. The Butterfly Garden serves as a green buffer between a fully renovated historic, seven story condominium building and 15 newly constructed luxury town houses. The park was developed with the cooperation and input from the Washington Butterfly Society during an intensive design charette. The garden will one day soon serve as an ecological amenity to the residents of Alban Towers as well as the surrounding community.
For the systems engineering process-based development, all requirements of 'Smart UAV Development Program' have been constructed as the database of CORE(R), computer aided systems engineering tool. In this paper, the construction and application of model-based test & evaluation system using those database is described, which prevents omitting essential tests and performing unnecessary rests and enables automatic reflection of database changes and standardization of document formats.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.