• Title/Summary/Keyword: Construction System

Search Result 14,715, Processing Time 0.04 seconds

ANALYSIS OF THE PROCESS OF FABRICATION OF STEEL STRUCTURES USING AN AUTOMATIC CONSTRUCTION SYSTEM

  • Hak-Ju Lee;Yoonseok Shin;Wi Sung Yoo;Hunhee Cho;Kyung-In Kang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1081-1087
    • /
    • 2009
  • An automatic construction system in Korea is now at the stage of the full automation like in Japan, and an actual pilot project is going to be built in 2009. However, in developing a new construction system that has never been implemented before, there is a need to assess the performance and to consider the uncertainty of the system. The program evaluation and review technique (PERT) allows dealing with this uncertainty. Thus, this paper implements an analysis of the process of steel fabrication and makes suggestions for time-related problems arising from the analysis. The time required for steel erection by the automatic system was compared with that in the traditional method. In the result, finding out another construction process and improving robot performance were proposed to resolve the problems. The results will contribute to promoting the development of an efficient system for the new automatic construction system.

  • PDF

The Regional Construction & Management Office Construction Management System Based On The Web (웹을 기반으로 한 지방청 공사현황 정보시스템 구축)

  • 서명배;강의석;김남곤
    • Proceedings of the CALSEC Conference
    • /
    • 2003.09a
    • /
    • pp.84-89
    • /
    • 2003
  • For running various construction processing information and technological information, it is supplied by Construction CALS/EC systems properly during whole facilities life cycle. So it is urgently necessary to change Regional Construction 8t Management Office (RCMO) equipment construction administration business to electron processing system (CALS/EC). From construction work plan to completion, a present storage documents system is unsystematic. Therefore, it needs management system to store documents and to read in turn documents properly. This research suggest that it is to connect with various information systems and Construction CALS/EC for RCMO which is running public construction field. So it can be driven systematic and effective administration system about public construction business by Web-based present construction situation information system.

  • PDF

A Study on the Necessity for the Standardization of Information Classification System about Construction Products

  • Hong, Simhee;Yu, Jung-ho
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.121-123
    • /
    • 2017
  • The widespread dissemination of the green building certification system has led to the ongoing development of information management technologies with the aim to effectively utilize construction product information. Among them, a data crawling technology enables to collect the data conveniently and to manage large volumes of construction product information in Korea and overseas. However, without a standardized classification system, it is difficult to efficiently utilize information, and problems such as an additional work for classifying information or information-sharing errors. Therefore, this study suggests to present a necessity for the standardization of the information classification system through expert interviews, and to compare construction product classification systems in Korea and overseas. This study is expected to present a necessity for the effective management of construction product information and the standardization of information-sharing with regard to various construction certifications.

  • PDF

Improvement scheme of utilization of the results of the post-construction evaluation system (건설공사 사후평가 수행결과 활용도 개선 방안)

  • Lee, Du-Heon;Park, Jae-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.78-89
    • /
    • 2013
  • Post-evaluation system reflects the results of performing a public construction project in the future similar public construction projects to be utilized in the planning. However, the current system simply compares the expected values, such as demand, B/C ratio, cost of construction, construction period, with the actual values after the completion of construction. In addition, most public owner does not actively conduct the post-construction evaluation tasks, so that the evaluation results has not been returned to early stage of a construction project. In this study, status of the post-construction evaluation system is investigated by a survey of the public owner and the construction project evaluation system of the United States and Japan was analyzed. This paper presents the improvement scheme of utilization of the results of the post-construction evaluation system. Through improving the post-construction evaluation system, it is expected that public agencies would easily utilize the post-construction evaluation.

The Economic Feasibility of Building-Integrated Photovoltaics System Installed on the Roof of Residential Building - Focused on Comparison with Construction Cost of BAPV System Depend on Roof Finishing Materials

  • Oh, Byung-Chil
    • KIEAE Journal
    • /
    • v.17 no.1
    • /
    • pp.15-21
    • /
    • 2017
  • Purpose: This study was on the economic feasibility of BIPV system, focused on comparison with construction cost of BAPV system depend on roof finishing materials, and to suggest basic data on the construction cost. Method: Construction cost of BAPV system was calculated, by selecting asphalt single, flat type roof tile, color steel plate, titanium zinc plate as roof finishing material of residential building and by sum up each cost for roof finishing construction and cost for 3kWp-volumed PV module installation. Also, the economic feasibility was analysed quantitatively by comparing the cost for BIPV system construction, installing same volumed PV module instead of roof finishing materials. Result: 1. By installing BIPV system instead of the roof finishing material, the cost of construction falls ; about 19% in case of the titanium zinc plate, which is the most expensive, and about 11% in case of the color steel plate. 2. Reducing amount of the construction cost gets larger because of installing BIPV module instead of the roof finishing material, as the construction cost for roof finishing material gets higher ; therefore, it is more economical than BAPV system in terms of whole cost of construction.

A Basic Study on the Improvement of PC Project Management System Process (PC 공사 프로젝트 관리 시스템 프로세스 개선을 위한 기초연구)

  • Kim, Chang-Hun;Ahn, Yong-Han
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.95-96
    • /
    • 2023
  • The purpose of this study is to derive the limitations of the existing management system by analyzing the characteristics of the PC process to improve the PC construction project management system process. To overcome the limitations derived, we present a process of managing integrated information from the design-production-construction stage using QR codes and clouds. This is expected to help develop a PC construction project management system.

  • PDF

Development of Construction Schedule Management System based on BIM (BIM데이터를 활용한 건설공사 일정관리 시스템 개발 연구)

  • Park, So-Hyun;Song, Jeong-Hwa;Oh, Kun-Soo
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.3
    • /
    • pp.61-68
    • /
    • 2018
  • As construction projects become larger, higher and more complex, efficient use of information is increasingly more important. As a result, there is a growing demand to apply BIM data obtained in the design stage to the construction stage. In this study, we propose a BIM-based construction schedule management system in order to promote introduction and application of BIM in the construction stage. Specifically, we provided how to build BIM database to be used for construction schedule management, and proposed how to obtain progress information and enter information based on analysis of progress schedule. We also provided a system of classifying construction works for more systematic use of BIM database, a process of using BIM database in construction projects, and a step-by-step guideline on how to establish the system. The proposed construction schedule management system provides information on particular construction schedule, as well as information and progress chart on delayed parts of the work so that a change in schedule can be managed. Additionally, by linking system database with the BIM model, construction progress can be checked in 3D simulation and a delay in construction schedule can be managed. As a result, using BIM at construction sites contributes to improving project productivity.

Development of Optimum Design Factor for Automated Steel Fabrication Construction System (철골조립자동화시스템의 설계최적화를 위한 요구성능도출에 관한 연구)

  • Lee, Myung-Do;Kim, Dae-Won;Lee, Bo-Hyeong;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.235-239
    • /
    • 2009
  • As robotic technologies have become more actively utilized to automate many construction tasks, they have been able to improve the construction productivity, quality, and worker's safety on site. A new advanced system, Robot-based Construction Automation (RCA) system, is currently being developed. To accomplish RCA system effectively, Design for automation (DFA) should be performed in automation system developing phase. The performance criteria of this system are a major cause of design changes. It is required exhaustive review for development new system. This research analyzed the design changes of Climbing Hydraulic Robot system and Construction Factory (CF), being currently developed in the field of applied RCA systems. And the design change matters according to performance criteria in each system's design-by-step were analyzed. The purpose of this research is developing the performance criteria in the developing phase of RCA system, and then will be served as basis for system design in similar projects.

  • PDF

The Study on the Suggestion of Development Guideline for Automated Building Construction System (건물 자동화 시공 시스템 개발 방향에 관한 연구)

  • Lee, Ung-Kyun;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.3
    • /
    • pp.67-73
    • /
    • 2007
  • Increasing wages and decreasing skilled labors are problems awaiting solution. The development of automatic technologies contributes to accelerating the one of construction automation. Thus, this study is to suggest the way to develop the automated building construction system base on one performed in Japan in order to solve urgent problems of construction industry in Korea. Therefore interviews and questionnaires were performed based on experts who work for the automated building construction system field and analyzed through analytic hierarchy process. In doing so, it was the most important factor to develop a branch of automatic, mechanical or machine technologies for the automated building construction system. Especially the study indicated the importance of the technologies to substitute skilled labors such as a robot. This research could contribute to developing the automated building construction which is very unique and suitable for construction industry in Korea.

A vision and strategy for developing virtual construction system (가상 건설 시스템 비전과 구축 방향)

  • Choi, Cheol-Ho;Chin, Sang-Yoon;Kim, Jae-Jun;Shin, Hyun-Mock;Lee, Kwang-Myong;Yoon, Su-Won
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.62-67
    • /
    • 2007
  • The research team for the virtual construction development was established with the support of Korea Ministry of Construction and Transportation, and KICTEP (Korea Institute of Construction and Transportation Technology Evaluation and Planning). Its aims are to develop system that is to improve productivity & quality, to create a higher value-added business, and to cultivate international competitiveness in the construction industry. The virtual construction system is a design, engineering, and construction management information system that allows the project participants to effectively share the information throughout the construction life cycle with the support of 3D and design information. To achieve this, the research team focuses on developing several systems. First, the team focuses on developing for the pre-planning, the structural engineering, MEP, and the 3D based estimation system. Second, they focus on developing a simulation system for the construction process planning and feasibility study with help of the virtual reality technologies. Third, they focus on developing the CPLM (Construction Project Life-cycle Management) system for managing construction project data, and the decision support system that makes the collaboration among the project participants based on 3D technologies and information. We also focus on developing the SDAI (Standard Data Access Interface), the localized guideline for 3D design, and a training program. In addition, we focus on developing the undeveloped area of the commercial system and building an environment that can support the communication and collaboration in the construction life-cycle rather than developing the existing and commercialized system.

  • PDF