• 제목/요약/키워드: Construction System

검색결과 14,694건 처리시간 0.044초

건설노무제공자제도의 도입에 따른 영향 및 개선방안 (Impact of Introduction of Construction Labor Providers System and Improvement Plan)

  • 안혜균;서희창;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.149-152
    • /
    • 2010
  • Construction labor provider system is requested system by professional construction companys of profitless caused by directly hire of construction labor and labor management of difficulty after construction participants system abolition. Complemental laws which occured problems of Payment of wages, illegal subcontracting In construction participants system is prepared and no complemental point included in revised bill. but Construction labor groups oppose introduction of Construction labor provider system because groups concern to occurr before problem in construction participants system. The purpose of this study is drawn satisfactory system to Specialty contractor and construction worker.

  • PDF

공공 도로건설사업에서의 원격 현장모니터링 체계 구축에 관한 연구 (A Study on Development of Remote Site Monitoring System in Public Road Construction Projects)

  • 옥현
    • 한국도로학회논문집
    • /
    • 제14권6호
    • /
    • pp.57-65
    • /
    • 2012
  • PURPOSES : Efficiency Improvement of a public road construction project management work using the development of a real-time remote site monitoring system METHODS : In this study, we developed the remote site monitoring system using a web camera for road construction projects in the RCMA(Regional Construction Management Administration). We can be monitored a construction progress and a weak point of the situation in real time using this. To achieve this, we tested about 10 road construction projects ordered by RCMA. Then, we verified a applicability for the site monitoring system in future. RESULTS : Take advantage of the remote site monitoring system consists of the Construction CALS System, one of the business systems used in the part of the MLTM(Ministry of Land, Transport and Maritime Affairs) institution-agencies. Was configured to be served through the "Construction CALS System" of "Construction Management System(Contractors)" and the "Construction CALS Portal System". Through this, Benefit analysis through a pilot application of the 10 road construction sites and developing considerations and "Guide for visual information processing equipment installation-operating in construction sites"are presented. CONCLUSIONS : Through the establishment of remote site monitoring system can improve the efficiency of construction management services. In addition, Various disasters and calamities, accidents and illegal construction will be prevented in advance is expected. This is expected to further improve the quality of the facilities.

건설CALS 표준화 체계 정립에 관한 기초적 연구 (A Study on Establishment of Construction CALS Standardization system)

  • 이상호;김명원;김봉근;유인채
    • 한국전자거래학회:학술대회논문집
    • /
    • 한국전자거래학회 2001년도 International Conference CALS/EC KOREA
    • /
    • pp.141-154
    • /
    • 2001
  • This paper presents a fundamental study to establish a standardization system of the Construction Continuous Acquisition and Life-cycle Support(CALS). States of standardization in the Construction CALS were reviewed to find some defects in developing CALS system in construction industry. It is analyzed that three of major parts were needed to put up a standardization system for the Construction CALS. Firstly, the range of Construction CALS standardization is set up by identifying of Construction CALS and defining the standard and standardization. Secondly, the strategy to enable more effective implementation of Construction CALS standardization and the relationship of the concerned system presented can be used for establishing the Construction CALS standardization system. In addition, the spread and application device is proposed for using Construction CALS standards at public institutions and construction related companies. Conclusively, a classification system of the Construction CALS standards was proposed and some objects to be standardized were presented in the classification system. What were studied in this paper will provide the primary information and guidance to develop a guideline for standardization of the Construction CALS.

  • PDF

Analysis on the Problems of Construction Temporary Work through Review on Technology System

  • Park, Junmo;Kim, Okkyue;Kim, Jinlee;Lim, NamGi
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.716-717
    • /
    • 2015
  • A construction temporary work is main process and importance trade section. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study reviews literature researches and can verify that changes to a comprehensive technology system for construction site. In addition, it suggests a breakdown structure of new standards for temporary construction technology based on views of construction site managers. Meanwhile, temporary construction technology in Korea has changed with a specification of construction temporary work which had been revised in 2014. However, the revision is merely dividing the design and building off of construction temporary technology. It is lacking in many ways to change this in a new standard system for temporary construction technology. Henceforth, it needs to develop a standard system for temporary construction technology and a professional system that is appropriate for different purposes by detail trade sections.

  • PDF

건설공사 사후평가 제도 활성화 방안 수립 (Strategies for Facilitating Post-Construction Evaluation and Management System)

  • 이강욱
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.379-380
    • /
    • 2023
  • The Post-Construction Evaluation and Management System has been operated over the past 20 years not only to analyze the performance of large-scale construction projects, and but also to provide useful reference data for future similar projects. Although the Post-Construction Evaluation and Management Center has been legally designated and operated since 2020, various problems have been occurring in the operation of the system. Accordingly, this study proposes strategies for facilitating Post-Construction Evaluation and Management System in terms of the following three aspects: (1) improving the implementation rate of post-construction evaluation; (2) improving the information management system related to post-construction evaluation; (3) improving the utilization of post-construction evaluation outcomes. Based on the results of this study, a specific action plan will be prepared, which is expected to contribute to the efficiency of construction project performance management in the future.

  • PDF

A CASE STUDY OF CONSTRUCTION ENGINEERING FOR CABLE SUPPORTED BRIDGE BY COLLABORATIVE SYSTEM

  • Jung-Min Nam;Sung-Ho Kim;Jae-Hong Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.586-590
    • /
    • 2011
  • This paper presents the case study of the CE by collaborative system and proposes a model of the CM group for the cable supported bridge. The cable supported bridges have a large project scale and need a high level of construction method. Therefore an advanced construction management system is required for successful completion of project. The construction management (CM) group which control design management, construction plan, subcontract, technical support and R&D is organized for the cable supported bridge project. The CM group established a collaborative system with construction site and drew an effective management of cost, process, quality, safety for each project. Furthermore, the CM group established the procedure of construction management based on the construction engineering (CE) items and performed the project management on the construction phase. Efficiency of cost reduction and site control is maximized by using a collaborative system.

  • PDF

INDICATOR FOR PERFORMANCE MANAGEMENT OF CONSTRUCTION CALS

  • In-Su Jung;Jin-Uk Kim;Chan-Sik Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1340-1345
    • /
    • 2009
  • Ministry of Land, Transportation and Maritime Affairs has implemented Construction CALS project for improving informationization level of construction industry and for making construction production system efficient. Although an importance of evaluation on level and performance of construction informationziation projects has been emerged, Construction CALS hasn't been evaluated so far. In this study, the performance indicators of construction CALS as the most important base in creating a performance management system were deduced. For this aim, this study reviewed the former researches on system construction for managing performance, analyzed current status of Construction CALS, arranged the relationship between upper strategies and ISP, developed pools of performance indicators, and this study followed IT BSC methodology. As a result, this study developed performance indicators of Construction CALS through four strategies such as globalization and activation of Construction CALS standards, research & development for reaching to international level in construction informationization technology, stabilization of system operation and distribution by publicizing Construction CALS and improving its functions, and policy implementation for managing and coordinating Construction CALS projects. These indicators will be applied to build a system of performance management.

  • PDF

건설CALS 표준화 체계 정립에 관한 기초적 연구 (A Study on Establishment of Construction CALS Standardization system)

  • 이상호;김명원;김봉근;유인채
    • 한국전자거래학회지
    • /
    • 제6권3호
    • /
    • pp.181-196
    • /
    • 2001
  • This paper presents a fundamental study to establish a standardization system of the Construction Continuous Acquisition and Life-cycle Support(CALS). A state of the art in standardization of the Construction CALS is reviewed to find some defects in developing CALS system in construction industry. It is analyzed that three major parts were needed to set up a standardization system for the Construction CALS. Firstly, the range of Construction CALS standardization is set up to identifying Construction CALS and defining the standards and standardization. Secondly, the strategy to carry out more effectively in Construction CALS standardization and make the relationship of the concerned system presented here can be used to establish the Construction CALS standardization system. In addition, the spread and application device are proposed to use Construction CALS standards at public institution and construction related companies. Conclusively, a classification of the Construction CALS standards was proposed and some objects to be standardized were represented in that. Results studied in this paper will provide the primary information and basic model to develop a guideline for standardization of the Construction CALS.

  • PDF

세그멘탈 PSC박스거더교량의 시공간 계측모니터링을 통한 확률적 구조안정성 평가 및 제어 시스템 (Safety Assessment and Behavior Control System using Monitoring of Segmental PSC Box Girder Bridges during Construction)

  • 신재철;조효남;박경훈;배용일
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제5권3호
    • /
    • pp.191-201
    • /
    • 2001
  • In spite of the increasing construction of segmental PSC box girder bridges, the techniques associated with real-time monitoring, construction control and safety assessment during construction have been less developed compared with the construction techniques. Thus, the development of an integrated system including real-time measurement and monitoring, control and safety assessment system during construction is necessary fur more safe and precise construction of the bridges. This study presents a prototype integrated monitoring system for preventing abnormal behavior and accidents under construction stages, that consist of behavior control system for precise construction, reliability-based safety assessment system, and structural analysis. Also, a prototype software system is developed on the basis of the proposed model. It is successfully applied to the Sea-Hae Grand Bridge built by FCM. The integrated system model and software system can be utilized for the safe and precise construction of segmental PSC bridges during construction.

  • PDF

건축물 시공 자동화 시스템 구축을 위한 건설공장 구조체 개발 (Development of Construction Factory for Automated Building Construction System)

  • 김태훈;신윤석;조훈희;강경인;박귀태
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.163-169
    • /
    • 2008
  • 첨단 로봇 기술의 적용은 건설 산업의 인력난으로 야기되고 있는 문제점을 해결하기 위한 유효한 방안으로 인식되고 있으며, 이에 대한 해결책 중 하나로 건설 현장에서의 로봇 활용 방안에 대한 연구가 꾸준히 이루어지고 있다. 1990년대 이미 일본에서는 초고층 구조체의 전자동 시공시스템을 개발하였으나, 장비의 개발과 운영에 천문학적 비용이 소요되는 비경제적 시스템으로 실용화에 실패하였다. 이에 국내에서는 시스템을 경량화하고 국내 건설 상황에 적합한 경제성을 갖춘 고층 건물 구조체의 시공 자동화 시스템 개발을 위한 연구를 진행하고 있다. 본 논문은 국내 시공 자동화시스템의 핵심이라 할 수 있는 건설공장 구조체와 이를 상승시키기 위한 크라이밍 유압로봇 시스템 개발을 중심으로 고층건물 구조체 시공 자동화 시스템에 관해 소개하고자 한다.

  • PDF