• Title/Summary/Keyword: Construction System

Search Result 14,684, Processing Time 0.042 seconds

Impact of Introduction of Construction Labor Providers System and Improvement Plan (건설노무제공자제도의 도입에 따른 영향 및 개선방안)

  • Ahn, Hye-Kyun;Seo, Hee-Chang;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.149-152
    • /
    • 2010
  • Construction labor provider system is requested system by professional construction companys of profitless caused by directly hire of construction labor and labor management of difficulty after construction participants system abolition. Complemental laws which occured problems of Payment of wages, illegal subcontracting In construction participants system is prepared and no complemental point included in revised bill. but Construction labor groups oppose introduction of Construction labor provider system because groups concern to occurr before problem in construction participants system. The purpose of this study is drawn satisfactory system to Specialty contractor and construction worker.

  • PDF

A Study on Development of Remote Site Monitoring System in Public Road Construction Projects (공공 도로건설사업에서의 원격 현장모니터링 체계 구축에 관한 연구)

  • Ok, Hyun
    • International Journal of Highway Engineering
    • /
    • v.14 no.6
    • /
    • pp.57-65
    • /
    • 2012
  • PURPOSES : Efficiency Improvement of a public road construction project management work using the development of a real-time remote site monitoring system METHODS : In this study, we developed the remote site monitoring system using a web camera for road construction projects in the RCMA(Regional Construction Management Administration). We can be monitored a construction progress and a weak point of the situation in real time using this. To achieve this, we tested about 10 road construction projects ordered by RCMA. Then, we verified a applicability for the site monitoring system in future. RESULTS : Take advantage of the remote site monitoring system consists of the Construction CALS System, one of the business systems used in the part of the MLTM(Ministry of Land, Transport and Maritime Affairs) institution-agencies. Was configured to be served through the "Construction CALS System" of "Construction Management System(Contractors)" and the "Construction CALS Portal System". Through this, Benefit analysis through a pilot application of the 10 road construction sites and developing considerations and "Guide for visual information processing equipment installation-operating in construction sites"are presented. CONCLUSIONS : Through the establishment of remote site monitoring system can improve the efficiency of construction management services. In addition, Various disasters and calamities, accidents and illegal construction will be prevented in advance is expected. This is expected to further improve the quality of the facilities.

A Study on Establishment of Construction CALS Standardization system (건설CALS 표준화 체계 정립에 관한 기초적 연구)

  • 이상호;김명원;김봉근;유인채
    • Proceedings of the CALSEC Conference
    • /
    • 2001.08a
    • /
    • pp.141-154
    • /
    • 2001
  • This paper presents a fundamental study to establish a standardization system of the Construction Continuous Acquisition and Life-cycle Support(CALS). States of standardization in the Construction CALS were reviewed to find some defects in developing CALS system in construction industry. It is analyzed that three of major parts were needed to put up a standardization system for the Construction CALS. Firstly, the range of Construction CALS standardization is set up by identifying of Construction CALS and defining the standard and standardization. Secondly, the strategy to enable more effective implementation of Construction CALS standardization and the relationship of the concerned system presented can be used for establishing the Construction CALS standardization system. In addition, the spread and application device is proposed for using Construction CALS standards at public institutions and construction related companies. Conclusively, a classification system of the Construction CALS standards was proposed and some objects to be standardized were presented in the classification system. What were studied in this paper will provide the primary information and guidance to develop a guideline for standardization of the Construction CALS.

  • PDF

Analysis on the Problems of Construction Temporary Work through Review on Technology System

  • Park, Junmo;Kim, Okkyue;Kim, Jinlee;Lim, NamGi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.716-717
    • /
    • 2015
  • A construction temporary work is main process and importance trade section. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study reviews literature researches and can verify that changes to a comprehensive technology system for construction site. In addition, it suggests a breakdown structure of new standards for temporary construction technology based on views of construction site managers. Meanwhile, temporary construction technology in Korea has changed with a specification of construction temporary work which had been revised in 2014. However, the revision is merely dividing the design and building off of construction temporary technology. It is lacking in many ways to change this in a new standard system for temporary construction technology. Henceforth, it needs to develop a standard system for temporary construction technology and a professional system that is appropriate for different purposes by detail trade sections.

  • PDF

Strategies for Facilitating Post-Construction Evaluation and Management System (건설공사 사후평가 제도 활성화 방안 수립)

  • Lee, Kang-Wook
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.379-380
    • /
    • 2023
  • The Post-Construction Evaluation and Management System has been operated over the past 20 years not only to analyze the performance of large-scale construction projects, and but also to provide useful reference data for future similar projects. Although the Post-Construction Evaluation and Management Center has been legally designated and operated since 2020, various problems have been occurring in the operation of the system. Accordingly, this study proposes strategies for facilitating Post-Construction Evaluation and Management System in terms of the following three aspects: (1) improving the implementation rate of post-construction evaluation; (2) improving the information management system related to post-construction evaluation; (3) improving the utilization of post-construction evaluation outcomes. Based on the results of this study, a specific action plan will be prepared, which is expected to contribute to the efficiency of construction project performance management in the future.

  • PDF

A CASE STUDY OF CONSTRUCTION ENGINEERING FOR CABLE SUPPORTED BRIDGE BY COLLABORATIVE SYSTEM

  • Jung-Min Nam;Sung-Ho Kim;Jae-Hong Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.586-590
    • /
    • 2011
  • This paper presents the case study of the CE by collaborative system and proposes a model of the CM group for the cable supported bridge. The cable supported bridges have a large project scale and need a high level of construction method. Therefore an advanced construction management system is required for successful completion of project. The construction management (CM) group which control design management, construction plan, subcontract, technical support and R&D is organized for the cable supported bridge project. The CM group established a collaborative system with construction site and drew an effective management of cost, process, quality, safety for each project. Furthermore, the CM group established the procedure of construction management based on the construction engineering (CE) items and performed the project management on the construction phase. Efficiency of cost reduction and site control is maximized by using a collaborative system.

  • PDF

INDICATOR FOR PERFORMANCE MANAGEMENT OF CONSTRUCTION CALS

  • In-Su Jung;Jin-Uk Kim;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1340-1345
    • /
    • 2009
  • Ministry of Land, Transportation and Maritime Affairs has implemented Construction CALS project for improving informationization level of construction industry and for making construction production system efficient. Although an importance of evaluation on level and performance of construction informationziation projects has been emerged, Construction CALS hasn't been evaluated so far. In this study, the performance indicators of construction CALS as the most important base in creating a performance management system were deduced. For this aim, this study reviewed the former researches on system construction for managing performance, analyzed current status of Construction CALS, arranged the relationship between upper strategies and ISP, developed pools of performance indicators, and this study followed IT BSC methodology. As a result, this study developed performance indicators of Construction CALS through four strategies such as globalization and activation of Construction CALS standards, research & development for reaching to international level in construction informationization technology, stabilization of system operation and distribution by publicizing Construction CALS and improving its functions, and policy implementation for managing and coordinating Construction CALS projects. These indicators will be applied to build a system of performance management.

  • PDF

A Study on Establishment of Construction CALS Standardization system (건설CALS 표준화 체계 정립에 관한 기초적 연구)

  • 이상호;김명원;김봉근;유인채
    • The Journal of Society for e-Business Studies
    • /
    • v.6 no.3
    • /
    • pp.181-196
    • /
    • 2001
  • This paper presents a fundamental study to establish a standardization system of the Construction Continuous Acquisition and Life-cycle Support(CALS). A state of the art in standardization of the Construction CALS is reviewed to find some defects in developing CALS system in construction industry. It is analyzed that three major parts were needed to set up a standardization system for the Construction CALS. Firstly, the range of Construction CALS standardization is set up to identifying Construction CALS and defining the standards and standardization. Secondly, the strategy to carry out more effectively in Construction CALS standardization and make the relationship of the concerned system presented here can be used to establish the Construction CALS standardization system. In addition, the spread and application device are proposed to use Construction CALS standards at public institution and construction related companies. Conclusively, a classification of the Construction CALS standards was proposed and some objects to be standardized were represented in that. Results studied in this paper will provide the primary information and basic model to develop a guideline for standardization of the Construction CALS.

  • PDF

Safety Assessment and Behavior Control System using Monitoring of Segmental PSC Box Girder Bridges during Construction (세그멘탈 PSC박스거더교량의 시공간 계측모니터링을 통한 확률적 구조안정성 평가 및 제어 시스템)

  • Shin, Jae-Chul;Cho, Hyo-Nam;Park, Kyung-Hoon;Bae, Yong-Il
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.3
    • /
    • pp.191-201
    • /
    • 2001
  • In spite of the increasing construction of segmental PSC box girder bridges, the techniques associated with real-time monitoring, construction control and safety assessment during construction have been less developed compared with the construction techniques. Thus, the development of an integrated system including real-time measurement and monitoring, control and safety assessment system during construction is necessary fur more safe and precise construction of the bridges. This study presents a prototype integrated monitoring system for preventing abnormal behavior and accidents under construction stages, that consist of behavior control system for precise construction, reliability-based safety assessment system, and structural analysis. Also, a prototype software system is developed on the basis of the proposed model. It is successfully applied to the Sea-Hae Grand Bridge built by FCM. The integrated system model and software system can be utilized for the safe and precise construction of segmental PSC bridges during construction.

  • PDF

Development of Construction Factory for Automated Building Construction System (건축물 시공 자동화 시스템 구축을 위한 건설공장 구조체 개발)

  • Kim, Tae-Hoon;Shin, Yoon-Seok;Cho, Hun-Hee;Kang, Kyung-In;Park, Kwi-Tae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.163-169
    • /
    • 2008
  • The application of robot technology on construction sites is recognized an effective solution to the problems caused by labor shortage on the construction industry, and relevant studies are being carried out increasingly. Automatic construction system for frames of high-rise building was developed in Japan in 1990's. Practical use o F the system, however, was failed due to inefficiency Now, we are developing economic and practical automatic construction system that is lighter and suitable for building construction In Korea. This study has discussed developing the system of construction factory and climbing control system, which is the core technology of the automatic construction system in Korea.

  • PDF