• Title/Summary/Keyword: Construction Supervision System

Search Result 126, Processing Time 0.026 seconds

Tracking Control of Ball and Plate System via Integrated Fuzzy Controllers (결합된 퍼지 제어기를 이용한 볼과 플레이트 시스템에서의 추정제어기 설계)

  • Seo, Min-Seok;Hyun, Chang-Ho;Park, Mig-Noon
    • Proceedings of the KIEE Conference
    • /
    • 2006.10c
    • /
    • pp.223-225
    • /
    • 2006
  • A ball moving on a beam is a typical nonlnear dynamic system, which is often adopted to proof test diverse control schemes. Ball and plate system is the extension of the traditional ball and beam problem that moves a metal ball on a rigid plate. In this paper, a trajectory planning and tracking problem is proposed for ball and plate system, which is to control the ball from a point to another without hitting the obstacles. Our scheme is composed of three controllers, TS type optimal path tracking controller, mandani type obstacle avoidance controller and trajectory planning controller that determines the desired trajectory. But this type of construction can give rise to chattering executions. Because the difference of contributions from concurrent controllers can cause behaviors unsmoothly. We propose fuzzy pid supervision control1er to handle this problem.

  • PDF

An optical fiber construction training curriculum and an embodiment system (광통신 시공인력 실습교과과정 및 종합 실습장 조성에 관한 연구)

  • Kim, Myoung-Saeng
    • Journal of The Institute of Information and Telecommunication Facilities Engineering
    • /
    • v.2 no.2
    • /
    • pp.22-31
    • /
    • 2003
  • The existing training courses for the optical communication construction in even a college and the university, consist of simple cutting and connecting cable technique and the subjects are splitted into parts, to which can not be grasped in a whole. Now, it is strongly demanded that the educational curriculum involves the whole process of the optical communication system construction, which includes design, supervision and up to the fusion splice connection. In this paper, the essential training elements for the optic execution worker are investigated and suggested with the appropriating solution for the experiment room.

  • PDF

Basic Study on Electrified Railway Design Management using VE(Value Engineering) Techniques (VE 기법을 이용한 철도 설계관리에 관한 기초연구)

  • Cho, Rae-Hyuck;Hwang, Sung-Gwang
    • Proceedings of the KSR Conference
    • /
    • 2005.05a
    • /
    • pp.849-855
    • /
    • 2005
  • Railway fields are complicatedly connected with engineering such as physics, civil engineering, architecture engineering, electrical engineering (Telecommunication, signal, catenary, system), machine engineering and performance phase of project in domestic railway can be divided with four steps : planning, design, supervision, construction. Value Engineering is needed to reduce the cost of long period construction duration and periodically maintenance. Currently, railway design is difficult to act optimum design due to limited time, short of manpower, downsized of design company. therefore, VE concept in Design must require In order to solve this problem. it is called Design Management. This paper presents both item of design management and total design management tool of practical aspects, and describes LCC (Life Cycle Cost) analyze process and accomplishment process for applying VE concept

  • PDF

Characteristics and Development of Database Program for Maintenance and Management of Railway Tunnel (철도터널의 유지관리 DB 프로그램 개발 및 특성)

  • Lee, Song;Koo, Ja-Kap;Shim, Min-Bo
    • Journal of the Korean Society for Railway
    • /
    • v.3 no.3
    • /
    • pp.139-146
    • /
    • 2000
  • Recently, many kinds of research have been actively developing for a standardization and information to the field of design, construction, supervision, maintenance and management on facilities. The establishment of standard classification system on tunnel facilities and inspection data is most important among the things to have a efficiently maintenance and management. This paper suggests standard classification system on tunnel facilities and inspection data, and, on the basis of that, code work with standard classification system and input work was practised. The purpose of this paper is to suggest a kind of statistics data and investigate a characteristics of inspection using statistic data on railway tunnel.

  • PDF

Enacting Law on Principles of Landscape Architecture and Remedial Directions for Its Related Regulations (조경기본법 제정과 관련 법규의 정비방향)

  • 신익순
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.29 no.5
    • /
    • pp.115-124
    • /
    • 2001
  • The purpose of this study is to examine the rightness of establishing the Essential Act of Landscape Architecture in Korea and to present the legal phase, the legislative system and the construction of a contents at the expected enactment of it. It is necessary to point out the problems of the various fields of landscape architecture and to propose the solutions of them. The contents of the study are as follows, 1 . The number of the regulations related to landscape architecture is a good reason for which the field of landscape architecture is worth being included to the positive law. 2. The problems by items(ordinance, engineer, contract, planning, design and supervision, construction, maintenance, plant and planting, material, aesthetics and sight, environmental conservation and ecology, right and penal regulations) to the domestic related regulations being at issue and the remedies for it shall be considered at the enactment of the Essential Act of Landscape Architecture. 3. The number of the domestic regulations being related to landscape architecture which have a term of\` the Essential Act∼\`is 5. 4. The Essential Act of Landscape Architecture is the separate Essential Act welch defines the scope of landscape architecture as construction works and controls the business essentially. 5. The meaning and character of the Essential Act of Landscape Architecture was examined and the reasons for that essential act were recognized in point of the legal, landscape architectural and educational systems. 6. The creation of new official landscape architectural organization is a reason to justify the enactment of the Essential Act of Landscape Architecture. 7. The legal phase, the legislative system and the construction of a contents of the Essential Act of Landscape Architecture ware presented and this act shall conform to such as the legal system of the Architectural Act, the Essential Act of the Construction Industry and so on. The result of this study will be the basic materials for the creation of the Essential Act of Landscape Architecture.

  • PDF

4S Framework Construction Structure for Interoperability of Spatial Information (공간 정보의 상호운용성을 위한 4S 기반 프레임워크 구축)

  • Oh, Byoung-Woo;Kim, Min-Soo;Joo, In-Hak;Lee, Jong-Hun;Yang, Young-Kyu
    • Journal of Korea Spatial Information System Society
    • /
    • v.3 no.1 s.5
    • /
    • pp.95-108
    • /
    • 2001
  • The provision of spatial data is a key infrastructural requirement for the promotion of economic growth, environmental quality, social progress, etc. 4S technology integrates 4 kinds of systems that process spatial data: GIS (Geographic Information System), GNSS (Global Navigation Satellite System), ITS (Intelligent Transport System), and SIIS (Spatial Imagery Information System). Spatial data processing field is expected to get synergy effect and overcomes development limit of individual unit technology via 4S technology. This paper discusses both the development of 4S-kernel technology and the construction of 4S-based framework, In the development of 4S kernel technology, we will concentrate on the following issues: the development of 4S base components for reciprocity integration among GIS, SIIS, GNSS and ITS technologies, the development of 4S-Mobile S/W and H/W, 4S-Van components, and national LBS technologies. And in the construction of 4S-based framework, we will especially concentrate on the ISP for overall 4S technologies, the international cooperative research center, and the guide model deduction for supervision and certification of 4S projects. Finally, we examine about how the construction of 4S-baed framework affects 4S industry.

  • PDF

The Improvement of Work Structure in the Private Investment SOC Project (민자 SOC사업의 시공단계 업무체계 개선방향)

  • Kim Daejin;Shin Seungtae;Lee Younghwan;Woo Sungkwon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.486-489
    • /
    • 2004
  • To enlarge the international competition and construction productivity, the domestic construction market attracts the private capital and expands the facility of :iocial Overhead Capital(SOC). However, the application of the business system used at the public project didn't utilize the effect of social overhead capital. It caused problems that parties' business was inefficient and their allotment of the risk was inadequate. This paper presents the course to reorganize the business system which the coincides with the origin aim of the SOC. For the reformation of the supervisor's work scope and business system and the government's overall project management, in other words, this paper proposes the professional organization to replace the superintendence and the formation of optimal business system. This paper confirms the privity of contract among parties of SOC project and parties' work scope and system between relative laws and concession agreement that government made a contract with Special purpose Company (SPC).

  • PDF

Computer Vision-based Automated Adhesive Quality Inspection Model of Exterior Insulation and Finishing System (컴퓨터 비전 기반 외단열 공사의 접착제 도포품질 감리 자동화 모델)

  • Yoon, Sebeen;Kang, Mingyun;Jang, Hyounseung;Kim, Taehoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.2
    • /
    • pp.165-173
    • /
    • 2023
  • This research proposed a model for automatically monitoring the quality of insulation adhesive application in external insulation construction. Upon case implementation, the area segmentation model demonstrated a 92.3% accuracy, while the area and distance calculation accuracies of the proposed model were 98.8% and 96.7%, respectively. These findings suggest that the model can effectively prevent the most common insulation defect, insulation failure, while simultaneously minimizing the need for on-site supervisory personnel during external insulation construction. This, in turn, contributes to the enhancement of the external insulation system. Moving forward, we plan to gather construction images of various external insulation methods to refine the image segmentation model's performance and develop a model capable of automatically monitoring scenarios with a considerable number of insulation materials in the image.

Analysis of Construction Management Market Using System Thinking (시스템 사고를 이용한 건설사업관리 시장 영향요인 분석)

  • Kim, Yoon-Woo;Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.3D
    • /
    • pp.239-245
    • /
    • 2012
  • The necessity of professional construction management has been increased as a construction project is getting larger, more complex and specialized. Thus, the CM market has steadily expanded since 1996 in Korea. Despite the external expanding of the CM market, experts claim that domestic CM regulations and infrastructures should be revised. Therefore, this paper developed a causal map which consists of elements vitalizing CM market. Then, the simulation model using NUMBER (Normalized Unit Modeling by Elementary Relationships) to predict the size of the CM market is established. As a result, in the case of more regulation related CM, the quantity of CM projects could not reach of construction supervision until 2020. This paper can be used as a baseline providing a prospection of the change of CM market according to causal relation between the improvement as well as the base of revitalization research of CM market based on non-institutional factors change.

AN APPROACH FOR ESTIMATING TOTAL COST OF OCCUPATIONAL SAFETY FOR BUILDING CONSTRUCTIONS

  • Gurkan Emre Gurcanli;Nesimi Teoman Korkutan;Ugur Mungen
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.168-175
    • /
    • 2011
  • Construction accidents are major problem in Turkish Construction industry and especially fatally rates are very high. Current legislative system on occupational safety in Turkey enforces employers to implement safety measures as well as safety management systems. However level of consciousness in the industry is unsatisfactory and safety are perceived as extra cost and unnecessary expenditure. Moreover, especially in small residential building constructions which have a big share in the industry and unfortunately safety measures to mitigate or abate construction risks do not exist. The study focuses on small residential building construction sites and in the scope of this study, thirty building projects are examined. For each building project, project cost including labour and material costs, service and consultancy costs for mechanical, electrical systems as well as architectural and structural services, costs for supervision and finally general expenditures for construction site facilities were calculated. On the other hand, occupational safety costs for personal protective equipment, collective protective measures, consultancy and training were determined. Work breakdown structures were established and for each work item firstly occupational risks were evaluated and furthermore according to risk scores safety measures to be implemented were defined and related costs were calculated. The study gave results for total safety cost on average, in terms of percentage of total project cost (3.73% of total project cost), safety cost per man-hour (0.40 USD) and safety cost in terms of unit construction area (11.60 USD per square meter). Since safety management is a part of whole project management process, study gives suggestions and techniques to calculate safety costs and implement safety measures as a part of project management service for professionals. Authors believe that suggested approach may easily developed by the usage of more data to establish a model for estimation not only for building construction sites but also for all construction projects.

  • PDF