Action to Improve the Reliability of Production Planning

  • Kim Daeyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.139-144
    • /
    • 2002
  • Management of today's dynamic projects requires a shift of focus from product to process. The purpose of traditional project controls is to conform performance to plan. The purpose of lean project controls is to make the best possible choices at each point in time during the course of the project, as well as contributing knowledge to the parent organizations so they can learn from project experience. The Lean Construction Institute(LCI) proposed the Last Planner System(LPS) capable of accomplishing that purpose, principally through controlling the quality of planning and of management processes themselves, as distinct from concentrating exclusively on project performance. The case project was a pilot project for the implementation of the Last Planner. Consequently, the coordination of the work on this project was extremely successful. The project had its share of challenges. The coordination did not prevent design problems, or supplier errors, but helped the team deal with the problems effectively while maintaining the work flow. The last planner helped the contractors know: a) who will be doing what and where, b) what each one needs from the others, and c) what are the project priorities. The system itself created a more collaborative environment, because it 'demands' that the subcontractors address these issues.

Study on Development of Construction Management Module based on Risk factor classification system at Construction Phase (시공단계 위험요소 분류체계 구축을 통한 건설 프로젝트 관리모듈 개발에 관한 연구)

  • Lee, Joo-Sung;Moon, Sung-Kon;Jun, Yeong-Jin;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.199-202
    • /
    • 2009
  • Turn-key and CMF(CM for Fee) have been selected as procurement paths of large public projects in Korea. However, recently, researches and discussions on CMR(CM at Risk) have been popular as the Korean government seeks for alternative procurement paths to enhance the performance. In the CMR projects, the part who is responsible for construction management should predict and control the potential risks for guaranteeing benefits. In this research, CMR projects in which a general contractor plays the role as CMr is mainly analyzed. We give attentions to risk management during construction process given that subcontractors, main parts in this phase, work in various ways and thus more chances for faults exist. In this case, CMr manages risks to control the procedure of project. So, potential risk factors can constitute the database, and that database can be matched to following activity. And construction manager can forecast measures of risk using the result of matching. This chain of activities increase efficiency in roles of CMr on CMR(CM at Risk). Furthermore this study will propose one of the solution of Construction Management Module.

  • PDF

CONSTRUCTION DEFECTS AND MONETARY RETENTIONS IN CONSTRUCTION PROJECT: A REVIEW OF CASE LAW

  • Priyanka Raina;John Tookey
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.629-635
    • /
    • 2011
  • Retentions are generally considered to be intended to act as a powerful tool to incentivize contractors/subcontractors to remedy defective work in cases of non-performance. This study attempts to establish the extent to which retentions can be used for this purpose by investigating case law connected with insurance and defective work. One of the significant questions is whether retentions are sufficient to deal with construction defects or value of retentions in the rectification of defects is illusory. The cost to repair a defect may vary depending on a number of components including type, cause, magnitude and the construction stage at which the defect occurs. It is expected that a review of existing cases on defective workmanship will provide an insight on the issues and whether retentions are effective in their intended function. In order to establish their functionality, the study described in this paper investigated 6 construction insurance cases to identify the critical issues and the causes of dispute. It was found that the nature and the cause of defects were different in each case. It was also established that certain defect types not covered by insurance may be covered by retentions - potentially one of the key uses of a retention strategy. It is expected that the findings will assist in forming a view on the quantum of money that may be required paving the way for a first time understanding on a rational basis for setting up retention regime.

  • PDF

Definition of an Integrated Contract Package for Application of Multi-Trade Subcontract System (다공종 통합발주방식 적용을 위한 통합공종 규명에 관한 연구)

  • Song Hyung-Suk;Kim Kyoon-Tai;Han Choong-Hee;Kim Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.385-388
    • /
    • 2002
  • The construction industry has complicated production processes with diverse disciplines and subcontractors, which is the major cause of lowered productivity. To solve this problem, multi-trade subcontract system is recently suggested. Some general construction companies have applied this method to some sections of work process. However, this is in the early stage of application. The purpose of this study is to define an integrated contract package for improving both contractor and subcontractor efficiency. First, this study recognizes construction company to need of multi-trade subcontract system. Finally, it suggests feasible activities which can be useful for a construction company to apply to this subcontract system.

  • PDF

Improving the Contractor-subcontractor Relationship Through Partnering on Construction Projects in Zambia

  • Mudzvokorwa, Tafadzwa;Mwiya, Balimu;Mwanaumo, Erastus M.
    • Journal of Construction Engineering and Project Management
    • /
    • v.10 no.1
    • /
    • pp.1-15
    • /
    • 2020
  • With the increased dependence on subcontracting in the construction industry, the operational relationship between main contractors and subcontractor plays an imperative role in successful project delivery. Consequently, improving this relationship increases the probability of project success and enhancing project performance. A wide range of research has confirmed that partnering improves the main contractor-subcontractor relationship. Though the positive impact of partnering on project performance is supported by a plethora of evidence, the guiding theory on practical partnering process steps is limited. The study aimed at improving subcontracting in the construction industry through a partnering process relevant to Zambia guided by factors obtained from industry expects. Questionnaire surveys and Semi-structured interview were adopted to investigate the perception of construction industry professionals and academics towards the main contractor-subcontractor relationship along with improvement factors. The findings showed that the relationship between main contractors and subcontractors on most projects in Zambia is unsatisfactory therefore justifying attention. Top factors that can enhance the main contractor-subcontractor relationship were identified. From the factors deduced and guidelines on partnering best practices, a project partnering model was developed.

Identifying Factors Affecting Labor Productivity for Residential Fire Protection System Installation (공동주택 소방설비공사의 노무생산성 영향요인 분석)

  • Oh, Jae-Hoon;Kim, Dae Young;Kim, Jae Sik;Huh, Young-Ki
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.4
    • /
    • pp.377-384
    • /
    • 2017
  • It is generally acknowledged that subcontractors mostly allocate their resources to project relying on their previous experiences, instead of data-based judgement. Installing residential fire protection systems, typically performed by subcontractors, is labor-intensive job and its schedule is frequently changed as the contractor master schedule is often revised. Nevertheless, it is still important for subcontractors to make much effort to improve labor productivity through a thorough planning for scheduling and resource allocation. The purpose of this study is to identify significant factors that affect labor productivity for residential fire protection system installation. For this purpose, 50 potential factors that may affect productivity were identified based on literature reviews and expert interviews. These factors were further explored using correlation analysis and ANOVA test. The results showed that the labor productivity is significant impacted by various project characteristics.

Defect Classification and Management System Using CBR technique Based Internet in Apartment Housing Project (인터넷기반 공동주택 하자분류 및 관리 시스템 구축에 사례기반 추론기법을 활용한 연구)

  • Kim, Gwang-Hee;Shin, Han-Woo;Seo, Deok-Seok;Yoon, Jie-Eon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.63-70
    • /
    • 2008
  • Management process of apartment buildings construction has increased because the after service of construction company meet the needs of customers. Many defect data, which was inspected by construction company or customers before moving into a new apartment house, were classified by field engineers and then communicated to corresponding subcontractors. The classification process needs to be performed by an expert engineer because there is so much data, it is unfeasible to complete in a short period of time. For this classification process, an automatic classification system using case base reasoning (CBR) should be considered. This research proposed a defect management system with automatic classification system using CBR. This constructed defect management system consists of cyber after service system for tenants and the whole defect management process of construction, preservation and management of apartment buildings. This system could improve the efficiency of expert work in terms of time and accuracy, as well as helping laymen users to conduct defect classification work as experts do.

A Qualitative Analysis of Construction Projects From Supply Chain Management Perspective

  • Min Jung-Ung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.1 s.17
    • /
    • pp.80-87
    • /
    • 2004
  • This paper presents an analysis of construction project management from supply chain management perspective to gain insight from all constituents and to identify areas of improvement. In order to suggest opportunities for improvement, interviews with the members of a typical urban office building project in US were held. Based on that, a qualitative analysis of construction projects is presented. Focusing on electrical and mechanical sub-systems, this study illustrates the roles of subcontractors, suppliers, distributors, and manufacturing representatives as well as the complexity that a general contractor fares in managing its supply chain. The author$^{\circ}\phi$s recommendations are focused on process restructuring and automation, which include some quantifiable performance measures, incentives, and their alignment with each other

Innovation Culture and Process in Mediating Human Capital Supply Chain on Firm Performance

  • MUAFI, Muafi;SISWANTI, Yuni;DIHARTO, Awan Kostrad;SALSABIL, Imanirrahma
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.9
    • /
    • pp.593-602
    • /
    • 2020
  • The purpose of this study is to examine and analyze the effect of human capital supply chain on the firm performance mediated by innovation culture and innovation process on small- and medium-sized construction enterprises (SMEs) in Indonesia. A survey has been distributed to all construction SMEs that have direct involvement in construction work (contractors and subcontractors). The construction SMEs including medium- and small-scale construction services in three Provinces, namely, the special region of Yogyakarta, East Java, and Central Java. Through purposive sampling technique, primary data is collected by giving a questionnaire to the owner/manager of construction SMEs. The target sample in this study was 200 respondents who have been operating for a minimum of two years. 154 valid questionnaires could be processed. Data analysis uses structural equation modeling with AMOS 24. The results of the study conclude that there is a positive effect on human capital supply chain on firm performance mediated by innovation culture and innovation process, while innovation culture does not affect firm performance. In sum, the innovation culture mediates the relationship between human capital supply chain and firm performance, and the innovation process mediates the relationship between human capital supply chain and firm performance.

MODELING MEASURES OF RISK CORRELATION FOR QUANTITATIVE FLOAT MANAGEMENT OF CONSTRUCTION PROJECTS

  • Richard C. Jr. Thompson;Gunnar Lucko
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.459-466
    • /
    • 2013
  • Risk exists in all construction projects and resides among the collection of subcontractors and their array of individual activities. Wherever risk resides, the interrelation of participants to one another becomes paramount for the way in which risk is measured. Inherent risk becomes recognizable and quantifiable within network schedules in the form of consuming float - the flexibility to absorb delays. Allocating, owning, valuing, and expending such float in network schedules has been debated since the inception of the critical path method itself. This research investigates the foundational element of a three-part approach that examines how float can be traded as a commodity, a concept whose promise remains unfulfilled for lack of a holistic approach. The Capital Asset Pricing Model (CAPM) of financial portfolio theory, which describes the relationship between risk and expected return of individual stocks, is explored as an analogy to quantify the inherent risk of the participants in construction projects. The inherent relationship between them and their impact on overall schedule performance, defined as schedule risk -the likelihood of failing to meet schedule plans and the effect of such failure, is matched with the use of CAPM's beta component - the risk correlation measure of an individual stock to that of the entire market - to determine parallels with respect to the inner workings and risks represented by each entity or activity within a schedule. This correlation is the initial theoretical extension that is required to identify where risk resides within construction projects, allocate and commoditize it, and achieve actual tradability.