• Title/Summary/Keyword: Construction Standard

Search Result 3,407, Processing Time 0.052 seconds

A Study on the Revision of Construction Standard Unit Price for Interior Finishing Work and Carpentry Work (건설공사 표준시장단가의 수장공사 및 목공사 개정에 관한 연구)

  • Lee, Ju-hyun;Baek, Seung-ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.245-246
    • /
    • 2023
  • A construction site survey is carried out for the Construction Standard Unit Price(CSUP) in order to establish a standard for the appropriate estimated price. This paper proposed the revised plan by surveying the 56 sites under construction from March to October 2022 for interior finishing work and Carpentry work. It is expected that the revision of the CSUP for interior finishing work and Carpentry work will more accurately reflect the actual construction situation and contribute to improving the adequacy of the CSUP.

  • PDF

Research on Efficient Applicability Through Review on Standard for Selection of Construction Method for Railway Underground Crossing Transit (철도지하횡단 통과 공법 선정기준에 관한 검토를 통해 효율적인 적용성에 대한 연구)

  • Hwang, Young-Ho;Shon, Jung-Chul;Baek, Jong-Myeong
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.595-600
    • /
    • 2007
  • Greater expansion and more frequent operation of the railroad transportation system anticipated due to its characteristics including low cost, safety and mass transportation. Recently, effects on the railway structures due to expansion of newly constructed road, construction of subway, city gas pipeline, communication network, electric power network and construction of other railway underground crossing in accordance with urban planning and organization has influenced safe operation of trains. Accordingly, standard for selection of construction method that will enable construction of more economical and rational subway underground crossing structures by preventing problems occurring at the time of above construction works and accidents in safe operation of trains due to construction in advance is definitively necessary. Although there are numerous construction methods that can be applied at the time of construction of railway underground crossing, there are much difficulties in selection of appropriate construction method that considers characteristics of each construction method on non-excavation type construction method, train operation plan of number of operational routes and on-site circumstances. Therefore, this research aims to present rational standard for selection of construction method for such, and standard for slowdown speed and interception of train when passing the areas of slowdown in sectors under construction.

  • PDF

A Study on Estimating Construction Equipment Annual Standard Operating Hours (건설기계 연간표준가동시간 산정에 관한 연구)

  • Lee, Joong-Seok;Huh, Young-Ki;Ahn, Bang-Ryul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.1
    • /
    • pp.37-42
    • /
    • 2008
  • As use of construction equipment has been increasing continuingly, the proportion of equipment expense to the total construction cost has become higher. However, there is a difference between the equipment expenses section in 'Poom-Sam' and practical data, because 'Poom-sam' does not consider non-working days due to weather conditions, legal holidays and management conditions. Therefore, 'Poom-Sam' does not present a reasonable standard for estimating construction equipment expenses. In this study, to estimate realistic construction equipment operating hours, firstly, construction equipment was classified according to work, and weather conditions, in which each work could not be executed, were established. Then, weather data on Seoul and Busan($2004{\sim}2006$) and legal holidays were analyzed to suggest annual standard operating hours. The annual standard operating hours of earthmoving & excavating, compaction, and drilling equipment was estimated to be 1,430 hours, and lifting equipment, concrete paving equipment, asphalt paving equipment, concrete equipment, and crushing & conveying equipment were estimated to be 2,124 hours, 1,156hours, 1,188hours, 1,688hours, and 2,152hours respectively.

A Study on the improvement plan of regulatory standard for construction noise and vibration (공사장 소음진동 규제기준 개선방안에 관한 연구)

  • Park, Young-Min;Kim, Kyoung-Min
    • Journal of Environmental Impact Assessment
    • /
    • v.22 no.4
    • /
    • pp.369-379
    • /
    • 2013
  • Noise and vibration problems at the construction site, expansion of construction scale and frequency of urban construction is increased, has given the damage to local residents. Also, the result of civil complaint about noise and vibration that occurred in 2011 was 56,244; it is showing an increasing trend of more than 4% annually. In particular, the construction noise and vibration, the civil complaints of around construction site accounts for 64.6%(36,353), are harmful to the tranquility of living environment. As a result, the government has managed to strengthen the regulatory standard of construction noise (65dB(A), Day-time) from 2011. However, the regulatory standard of construction noise and vibration does not meet and also complaints related the construction noise and vibration not decreased. Because the management system can be applied to the construction site is insufficient and a shortage of manpower. In this study, investigated the status and problems of the regulatory standards related to construction noise and vibration, we propose an efficient management plan of construction noise and vibration.

A Study on the Establishment of Construction Cost Estimation Standard of Underground Steel Construction through Field Survey (지하철골공사 공사비산정기준 마련을 위한 현장조사 연구)

  • Song, Taeseok;Han, Sangjun;An, Bangyul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.339-340
    • /
    • 2023
  • Steel construction is one of the commonly used methods in building construction due to its efficiency in terms of time and cost. In particular, the top-down method using steel frames is widely used in the construction of underground structures in urban areas to shorten the construction period. However, there is currently no standardized cost estimation for subway steel frame construction in Korea, causing difficulties in determining the expected cost. In this study, we aim to provide basic data for establishing a cost estimation standard for subway steel frame construction through on-site surveys of subway steel frame construction commonly used in urban areas.

  • PDF

Integrated Code Classification System for Work Sections in Standard Method of Measurement and Construction Standard Specifications (수량산출기준 및 공사시방서의 공종분류코드 통합기준 연구)

  • Kang Leen-Seok;Kwak Joong-Min
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.80-91
    • /
    • 2001
  • Considering that the classified items in the work section level can have an applicability when those items are being used to cost and specification information with consistency, the work section classification code should be applied as an Integrated code system. Our construction industry is using three work section classification systems for civil engineering projects, such as integrated construction information classification system, standard method of measurement and guide of project specification. And each standard construction specification is also using different work section classification systems. This study suggests a methodology to integrate the code systems in construction specifications with civil engineering standard method of measurement. And the methodology suggested in this study was applied to a web-based prototype system with practical specification codes.

  • PDF

Standard Architecture of Information Systems for Virtual Construction (가상건설 정보시스템 통합을 위한 표준 아키텍처)

  • Han, Shocky
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.247-252
    • /
    • 2008
  • Systems architecture of information models for construction industry is introduced. The architecture ful fills international standards, such as ISO 10303(STEP) and IAI IFC, etc. It is defined in web service description language(WSDL) and ISO 10303-11(EXPRESS) language. A standard platform for this standard architecture is also developed. This platform has several tools which can transform EXPRESS description file into C++ or Java languages and which also can generate an IDL file or OWL file from an EXPRESS file. System architects, software engineers, information system consultants can use these standards to define their information model for construction industry in standardized way. Construction engineers can test this information model with ease using standard testing tools and testing method, which is also a part of standard architecture of information systems for virtual construction.

  • PDF

A Study on the standardization of Construction material by the use of three-tier classification system of Korean Industrial Standard (KS(한국산업규격)의 3단계분류체계를 활용한 건자재 표준화 방안 연구)

  • Lim, Seok-Ho
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2009.04a
    • /
    • pp.236-239
    • /
    • 2009
  • Since 1990s, we have achieved a certain level of success in standardization of design, construction, and material on housing and public buildings with the national-level promotion. A practical connecting device that can synthesize all the serial processes is required to maximize the effect of construction material standardization. However, desired outcome of the standardization is not achieved yet because these serial standards and notification practices are decided by each part of the process and some are congested. In this study, we aim to improve a general organizational system of Korean Industrial Standard (KS) which is the most fundamental tool for the standardization of construction materials moving from a conventional idea that the standard is only for the material and components producers to a concept that can also be shared by the designers and construction workers. To achieve this, we propose an improvement plan for the Korean Industrial Standard in the perspective of three-tier classification system.

  • PDF

A Study on the Standardization of Construction Material by the Use of Three-tier Classification System of Korean Industrial Standard (KS(한국산업 규격)의 3단계분류체계를 활용한 건자재 표준화 방안 연구)

  • Lim, Seok-Ho
    • Journal of the Korean housing association
    • /
    • v.20 no.3
    • /
    • pp.59-67
    • /
    • 2009
  • Since 1990s, we have achieved a certain level of success in standardization of design, construction, and material on housing and public buildings with the national-level promotion. A practical connecting device that can synthesize all the serial processes is required to maximize the effect of construction material standardization. However, desired outcome of the standardization is not achieved yet because these serial standards and notification practices are decided by each part of the process and some are congested. In this study, we aim to improve a general organizational system of Korean Industrial Standard (KS) which is the most fundamental tool for the standardization of construction materials moving from a conventional idea that the standard is only for the material and components producers to a concept that can also be shared by the designers and construction workers. To achieve this, we propose an improvement plan for the Korean Industrial Standard in the perspective of three-tier classification system.

Extension of Korea Standard of the CAD Drawings in Construction CALS/EC to Adopt the Port Field (항만분야 수용을 위한 전자도면 작성표준 확장 개발)

  • Moon, Jin-Seok;Han, Choong-Han
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.11
    • /
    • pp.957-967
    • /
    • 2013
  • While a vast number of cad drawings are produced in the life cycle of construction projects from the planning, design, and construction phases to the maintenance and control phases, the creation and distribution of non-standard drawings make it difficult for the construction parties to communicate with one another and to recycle, maintain, and control drawings by project phase. The Korea standard of CAD drawing in construction CALS/EC, which stipulates the standard for construction CAD drawings, is based on roads, rivers, and railways in line- and unit-based structures, allowing the creation of standardized CAD drawings. Such standard, however, cannot be easily applied to construction projects with multiple facilities like harbors, housing sites, or lands consisting of surface forms. In particular, port field consist of complex docks and amenities located in a certain coastal area based on multiple objectives. They also contain the concept of housing sites, like background land, and are composed of various civil engineering facilities, construction facilities, and port field, so that the existing CAD drawing standard cannot be easily implemented. Therefore, the purpose of this study is to maximize the efficiency of the information related to drawing information and to ultimately support smooth information exchanges in construction design by conducting a development research on the expansion of the CAD drawing standard that meets the needs of port field.