MITIGATION AND REMISSION OF CONTRACTOR'S DEFECTS LIABILITY IN KOREAN CONSTRUCTION CONTRACTS

  • Jong-Gwang Lee ;Yong-Su Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.447-451
    • /
    • 2005
  • The purpose of this study is to improve regulations such as law and standard contract forms related to defects liability in Korea. Defects liability has been one of the major causes of construction contract disputes in Korea in recent years. It is important to avoid or resolve disputes regarding defects liability through regulations containing clear criteria and to specify the standard regarding the mitigation and remission of the contractor's defects liability. This study was carried out through document research and analysis of judicial precedents. The following are the courses of improvement regarding the mitigation and remission of defects liability in Korea. First, laws and standard contract forms must contain more detailed clauses regarding exemption of a contractor's defects liability, which clearly set out the scope of the defects liability of the contractor. Second, the current system for defects liability favors the owner rather than the contractor - it is necessary to change the defects liability system in order to give the owner and the contractor an equal standing. Third, strict liability is taken on by the contractor even when the term of guarantee for defects lasts longer than the legally set period of liability for defects. Hence, it is necessary to improve the system by alleviating the liability of the contractor through applying negligence liability as opposed to strict liability during the term of guarantee.

  • PDF

건설공사 품질.안전.환경 통합관리를 고려한 해외 사례 고찰 (An advanced nation's case study considering integrated control for construction work quality.safety.environment)

  • 김동희;김운수;정한교;노정원
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2008년도 정기학술발표대회 논문집
    • /
    • pp.819-823
    • /
    • 2008
  • 현재 국내의 건설공사 품질관리, 안전관리, 환경관리는 각각의 법령을 기반으로 고유특성에 맞게 발전되어와 통합을 위한 기반이 형성되어 있지 못하다. 즉, 인력에서는 품질관리자와 안전관리자를 법적 배치인력으로 정하고 있으나, 환경관리자는 법적 배치인력이 아니다. 또한 품질관리계획은 KS A ISO 9001 규격의 모든 요구사항이 반영되어 PDCA(계획-실행-체크-조치) 시스템으로 업무를 수행하도록 되어 있으나, 안전관리계획 및 유해 위험방지계획은 KOSHA 18001 규격 요구사항 중 4항 실행(D) 및 운영에만 치중되어 P(계획), C(체크) 및 A(조치) 시스템이 제대로 반영되어 있지 못하다. 더욱이 환경관리계획은 수립기준조차 마련되어 있지 못한 실정이다. 이에 건설공사 품질 안전 환경 통합관리 기준을 마련함에 앞서 해외의 건설공사 운영사례를 조사하여 국내 적용가능성을 검토하고자 하며 본고에서는 싱가폴의 건설공사 운영사례를 살펴보기로 한다.

  • PDF

도로포장 및 유지공사 표준품셈 개정 방법에 대한 연구 (A Study on the Standard of Cost Estimation in the Construction of Pavement and Maintenance)

  • 정대권;태용호;안방률;조윤호
    • 한국도로학회논문집
    • /
    • 제11권1호
    • /
    • pp.85-94
    • /
    • 2009
  • 실적공사비 적산방식은 품셈견적, 실측견적, 단가견적, 및 총액견적 등 매우 다양하다. 표준품셈은 공공기관 및 민간기관의 공사비 책정기준이 되는 자료이다. 본 논문에서는 도로공사에 이용되는 기존 품셈견적의 문제점을 개선하기 위해 현장조사를 실시하고 분석하였으며 그 결과로 각 공종에 대한 실측견적 방법을 통계적 방법을 통해 제시하였다. 또한, 기존 품셈과 실측품셈을 공사단위의 비교를 통해 제안된 품셈이 보다 간단한 견적 작성을 가능하게 하고 보다 현실적인 공사금액을 산출함을 알 수 있었다. 본 연구에서는 보조기층의 Case-Study를 통하여 각 방식별 장단점을 가시적으로 비교해 보았다. 실측품셈으로 적용하였을 경우, 계산과정은 기존품셈의 50%로 축소되었으며 1일 1장비 사용으로 기존의 1일미만 장비 사용에 대한 편차가 보완되었다. 또한 품셈만을 이용하여 공정의 시공내용을 짐작하고 이를 바탕으로 공정계획이나 인력투입계획 등을 수립할 수 있었다.

  • PDF

"Standard Model" approach to building projects in the UK and potential role of project team to mitigate any local difference~from international developer's perspective

  • Tanaka, Koji
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.425-432
    • /
    • 2020
  • In order to improve the sustainability and smart construction, it is discussed arguably that developing and applying consistent "standard model" to plan business, design, construct and operate a building is considered to be one of the effective and efficient approach. The scope of this article is to examine, from the international developer's perspective, the "standard model" approach of a hotel brand to building projects in the UK, and also to explore potential role of project team to mitigate any local difference at the project level. These projects are developed by the same developer adopting the same business plan, design and operation to each project. In order to clarify the actual and likely difference in construction results, reference is also made to those building projects located in other geographical markets including Japan, Germany and USA, and focus is given on the analysis of its programme and cost. Principle findings are that there exists geographical difference especially in environmental and planning system, and that major local difference is found at least in the programme at the design stage. In contrast, the difference in the building cost itself may not be necessarily considered major if currency exchange rate being taken into account appropriately. It is also observed that there were cases where any difference in the programme was mitigated by taking different approach to procuring and defining roles of management and professional team at the project level. In conclusion, from the international developer's perspective, the geographical difference of the "construction system" surrounding building projects can typically lead to major prolongation of programme, however, these different construction results could be mitigated at least to a certain extent by introducing appropriate changes to the role of project team.

  • PDF

건설폐기물 재활용촉진을 위한 종류별 분류 및 발생원단위 산정 방안 (The method for the classification according to their kinds and the estimation of unit generation rate for promoting recycling of construction and demolition(c&d) debris)

  • 이희선;김동식
    • 한국재난정보학회 논문집
    • /
    • 제4권1호
    • /
    • pp.86-100
    • /
    • 2008
  • It is needed to classify the kinds of construction and demolition(c&d) debris to 6 catagories of waste concrete, waste asphalt concrete, waste wood, scraps, combustible waste and incombustible waste in order to properly do a separate discharge and to estimate unit generation rate in construction site. Also, in this case, the unit treating cost for mixed wastes should be applied with the unit treating cost for combustible waste. The construction standard materials estimation data is used for basic data for estimating unit generation rate. The mixed wastes in this data should be classified to waste wood, combustible waste and incombustible waste, and their ratio is obtained by using the unit generation rate of Asia Pacific Environment and Management Institute and Seoul Metropolitan Development Institute. The waste amounts generated from newly-built construction can be obtained from multiplying the loss rate by the amount of materials used from construction standard estimation data. Also, those from dismantling construction can be obtained by subtracting waste amount generated during newly-built construction from total input amount of materials in newly-built construction. Those in two cases can be used in construction site. It can be used for estimating the amount generated and establishing the treating plan in the case of setting up the policy of waste management and doing the environment impact assessment.

  • PDF

건설기계 연간표준가동시간 산정에 관한 연구 (A Study on Estimating Construction Equipment Annual Standard Operating Hours)

  • 이중석;허영기
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.219-224
    • /
    • 2007
  • 최근 건설공사의 대형화와 복합화로 인해 건설기계의 사용은 지속적으로 증가하고 있으며 전체공사비 중 기계경비가 차지하는 비율 또한 점차 높아지고 있다. 하지만 현행 '건설공사 표준품셈'은 기상조건으로 인한 작업불가능일, 법정공휴일, 공사관리조건에 따른 작업중지일 등을 고려하지 않고 있어 실제 운전시간과는 많은 차이를 보이고 있는 실정이며, 따라서 현실적이고 합리적인 건설기계경비 산출기준을 제시해주지 못하고 있다. 본 연구에서는 견설기계의 현실적인 연간표준가동시간을 산정하기 위하여 우선 표준품셈 상의 건설기계를 각 공종별로 분류하고, 각 공종의 작업이 불가능한 기상조건을 설정하였다. 한편 2004${\sim}$2006년의 서울과 부산의 일일 기상자료를 분석하여 기상조건 및 법정공휴일에 의해서 연간 각 작업이 불가능한 일수를 산출하고, 중복일수를 공제하여 각 장비의 연간표준가동시간을 산정하였다. 그 결과 연간표준가동시간은 토공장비, 다짐장비, 기초공사장비는 1,430시간, 운반 및 하역기계(양중장비로 한정)는 2,124시간, 콘크리트 포장기계는 1,156시간, 아스팔트 포장기계는 1,188시간, 콘크리트기계는 1,688시간, 골재생산장비는 2,152시간으로 산정되었다.

  • PDF

Web-based Daily Report for Data Repository of Standard Cost Data for Modernized Korean Housing (Hanok)

  • Kim, SuJi;Jung, Youngsoo
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.595-596
    • /
    • 2015
  • Growing demand for traditional Korean housing, modernized Korean traditional housing (Hanok) was developed as a way of providing Hanok for the public. However, the standard cost data for Hanok has limitations, as it was developed based on single mock-up project actually constructed and verified by another mock-up Hanok. In order to meet these research objectives, daily report composition which is easy-to-use for on-site workers and managers and also easy-to-accumulate standard cost data was developed first. Secondly, access to the system was made easy through a web server. Finally, an automated calculation formula was inserted to allow the last inputted data to be automatically included for adjustment of standard costs. This system was designed from an industry perspective so that any unspecified and nonprofessional users can easily use. For the users, it has an advantage that on-site workers are provided with a daily report system through web server and also they are able to complete such reports through simple input and output without any additional forms.

  • PDF

토목공사 정보분류체계에 관한 연구 (A Study On Information Classification Systems For Civil Construction)

  • 김병수
    • 한국건설관리학회논문집
    • /
    • 제4권3호
    • /
    • pp.102-111
    • /
    • 2003
  • 최근 건설업은 건설 프로젝트의 계획에서부터 해체에 이르기까지 프로젝트 전 과정에서 생성되고 사용되는 다양한 정보를 효과적으로 공유하고 활용하기 위한 일관된 방법이 요구되고 있다. 그러나 각 기관마다 정보분류체계의 상이성으로 인하여 정보의 재생산 및 교환에 많은 비용을 소비하고 있다. 이러한 비효율을 개선하기 위해 체계적이고 통일된 건설정보분류체계의 구축이 필요하여 그 동안 국내외에서 건설정보분류체계에 대한 연구가 있었으나 대부분이 건축공사를 위주로 진행되어 토목공사를 위한 정보분류체계의 연구는 부족한 실정이다. 최근 건설교통부에서 국내 건설정보분류체계를 정비하고 외국의 분류체계를 참조하여 토목 건축 모두 활용가능 한 건설정보 표준분류체계를 공시하였으나 분류체계 자체의 논리성 및 현업활용성에 대한 검증이 필요한 상태이다. 본 연구는 국내표준으로서의 표준분류체계를 분석하고 검증하기 위하여 분류체계의 분석기준을 설정하고, 분류체계가 갖추어야 할 논리성 및 요구조건에 따라 외국의 대표적인 분류체계인 Uniclass 및 Uniformat과의 비교분석을 통하여 문제점을 도출하여 개선방안을 제시하였다.

조경공사 표준품셈 공종 개정에 관한 연구 (A Studies of Amendment a Standard of Estimated Unit Manpower and Material of Landscape Architectural Construction Work Classification)

  • 윤주철;이관희
    • 한국조경학회지
    • /
    • 제39권5호
    • /
    • pp.119-126
    • /
    • 2011
  • 조경공사 표준품셈은 표준적이고 보편적인 공종과 공법들로 구성되어 있다. 그러나 최근 조경분야는 건설기술의 발전과 공사품질의 고급화가 요구되고 있는 실정이다. 그러나 현행 조경공사 표준품셈으로는 이러한 변화에 대응하기에는 한계가 있다. 이에 본 연구는 조경공사 표준품셈의 발전방안을 제시하는 것이 중요하다고 판단하여 우선 개정들이 필요한 품셈 공종을 파악하였다. 개정이 필요한 공종을 파악하기 위하여 문헌고찰과 예비설문조사를 통하여 설문 항목을 선정하였으며, 선정된 항목들은 조경 분야 전문가 60명으로부터 응답을 받아 통계처리 하였다. 연구의 결과는 다음과 같다. 첫째, 조경공사 표준품셈에 대한 활용도는 식재공종의 품셈이 가장 높았다. 둘째, 신규로 추가될 필요가 있는 공종으로는 정지공사, 조경 구조물공사, 포장공사, 수경시설공사, 옥외 시설물공사들로 파악되었다. 셋째, 조경공사 품셈공종 분야에서는 설문응답자들의 66.7%가 개정이 필요하다고 응답하였고, 개정이 필요한 품셈 공종으로는 식재 공종에서는 대형수목, 조형수목, 수목가식, 수목하자 등으로 파악되었다. 굴취공종에서는 대형수목, 조형수목 등으로 파악되었다. 유지관리공종에서는 전정폐기물 처리 품셈, 정원석 쌓기 및 놓기 공종에서는 돌틈 식재 품셈, 떼붙임 및 초류파종 공종에서는 현실적인 잔디규격의 품셈을 필요로 한다고 응답하였다. 연구의 결과들을 바탕으로 조경공사 표준품셈의 발전방안을 제시하면, 조경 식물의 규격과 조경공사 품질에 대한 공종별 세부 품셈과 조경공사 품질에 영향을 미치는 품셈분야의 개정이 필요하다.

BIM 표준프레임워크 기반의 건축 표준상세도면 구축방안 (Study for Architectural Standard Details Based On BIM Information Framework)

  • 권순호;이운재;조찬원
    • 한국CDE학회논문집
    • /
    • 제18권2호
    • /
    • pp.93-103
    • /
    • 2013
  • In the situation where there should be a gap between the design environments of 2D drawing and 3D BIM modeling, it is unavoidable aspect to face confusion caused by parallel usage of both technologies unless the project delivery systems are entirely upgraded to 3D. Therefore, it is critical to make efforts to minimize this confusion. Meanwhile, detailed drawings have very important roles in the construction process because they do not only concretely express construction methods for a given design plan but also provide basis for quantity takeoff and construction cost estimation etc. This paper suggests a plan to standardize detailed information based on BIM standard framework in order to make BIM realize the information. In the short term, this plan provides improved environment where both BIM and CAD technologies can be applied and, in the long term, it provides bases for BIM to replace CAD technology.