• Title/Summary/Keyword: Construction Stage Analysis

Search Result 923, Processing Time 0.027 seconds

A Study of Material Information System Model For Building Finishes (건축 마감자재정보 시스템 모델 연구)

  • Won, Seo-Kyung;Kang, Min-Woo;Woo, Ji-Youn;Kim, Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.597-601
    • /
    • 2006
  • There are considerable amount of man power and time spent for analysis and selection of various materials due to the inadequate application system and rapid searching process of material related information in each stage of building production process. Also, due to the insufficiency in recycling system of important information created for each process, they are hoarded at each task stage and project completion. As a result, because of the repetition of the similar/identical tasks on each process, it is the major reason for impeding the efficient employment of manpower of the company and decreasing competition of the company. Moreover, in selecting finish material in the project field, there are many difficulties due to the lack of technical information such as product characteristics and field applications. The construction quality also affects the profit and loss of the product which calls for a need to develop continued information management system that the finish material related examples could be shared in real time. The objective of this study is to propose a building finish material information which the real time research and application is possible to raise the productivity. TO do this, the current material information task status analysis and questionnaire research should be conducted to understand the demand of system development and reflect the result onto the system for easy access and application. Therefore, the building finish material information system for enhancement of productivity of construction task proposed in this study is expected to be utilized in enhancement of construction quality, maximization of company profit, and strengthening of company competition.

  • PDF

An Analysis of Construction Execution Tasks for Successful Residential Mechanical Projects (프로젝트 성공을 위한 효과적인 시공업무 및 영향 분석 - 아파트 설비공사를 중심으로 -)

  • Kang, Sang-Hun;Kim, Dae Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.60-67
    • /
    • 2019
  • The main purpose of this study is to identify the tasks performed at the construction stage of apartment houses and analyze the major construction tasks that may affect the performance indicators and analyze the impact on project performance. Based on expert opinions through preliminary research, pilot data, construction database, and other research trends, domestic and foreign research trends are divided into five major tasks, and each is divided into process management (P'1 ~ P'6), construction management (C'1 ~ C'5), environmental management (E'1 ~ E'4), quality control (Q'1 ~ Q'5), safety management (S'1 ~ S'5). Subsequently, each major task was subdivided into 24 detailed tasks. An independent t-test was conducted to analyze the impact on cost. We compared the importance of achieving the project goal and identified the construction work of concrete important construction which affects not only the cost but also the schedule performance index for the degree of significance of less than 0.05.

Facilities Standards by Local Education Offices and Characteristics of Spatial Composition Applied by Changes in the Construction Documents Phase - Focused on Schools in Gyeonggi, Deajeon and Chungcheong Districts - (교육청별 시설기준과 실시설계시 변경 적용된 공간구성의 특징 -경기, 대전, 충청지역 학교를 중심으로-)

  • Park, Im-Ho;Jung, Jin-Ju
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.18 no.4
    • /
    • pp.57-67
    • /
    • 2011
  • In this study, it did comparative analysis on the arrangement, construction and size of rooms applied in the early design stage at the time of prize-winning with the changed ground plans in the final design of those prize-winning works in design contests and BTL hold since 2007 for middle and high schools in Gyeonggi, Daejeon, Chungcheong regions. Through the analysis, this study intends to present those matters to be changed in the facilities standards of each local education office so that it can be referred to the assessment of spatial construction and proper size being planned in the future for middle and high schools and reflected flexibly in consideration of various educational conditions and characteristics of schools by regions. Furthermore, it has the objective to play a part for the establishment of much better environment of educational facilities by provision of reference materials to those matters being changed into proper ones not into the minimum ones of the school facilities standards as the national level. For case analysis, it analyzed various rooms classified by necessary spaces. Since names of rooms and spatial constructions to constitute facilities are different from each local education office and also the analysis by each room has some limitation in the changes and improvement of rooms for a wide range, it proceeded with detailed classifications of school building facilities by each necessary space.

  • PDF

An Extraction of Inefficient Factors and Weight for Improving Efficiency of the Curtain wall Life Cycle Process (커튼월 Life Cycle Process의 효율성 향상을 위한 비효율 요인 밑 중요도 도출)

  • Jung Soon-Oh;Kim Yea-Sang;Yoon Su-Won;Chin Sangyoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.101-112
    • /
    • 2005
  • Recently, a curtain wall construction is a exterior finishing components which is most used for shortening time in high-rise building as well as the class of key management factors in cost and schedule control. Also, it is recognized that an effective management for curtain wall process is a major subject to accomplish the project successfully. However, as the current management for curtain wall construction is focused on the construction stage, it makes problems such as errors in business performance, rework by mistakes and duplications, errors and omissions by ineffective information management and there has never been any efficient management from a view of the entire Curtain Wall Life-cycle process. Therefore, the aim of this study is to suggest a stage check point for process improvement in the curtain wall Life-cycle process through current curtain wall process analysis, and then to investigate the cause of waste factors using the Muda method from the Toyota Production System and extract the weighted effects of the waste factors using the analytical hierarchy process method. According to the result, Most of the inefficient factors happened in architectural design stage of the entire curtain wall Life-cycle process and my research identified that detail factors of them are a delay of decision making and an approval in changes, a deficit of engineering capacity and a delay of approval in architectural design drawings by owner, etc.

Model Design and Applicability Analysis of Interactive Electronic Technical Manual for Planning Stage of Construction Projects (건설공사 기획단계 전자매뉴얼의 적용 모형 구성 및 효과 분석)

  • Kwak, Joong-Min;Kang, Leen-Seok
    • Land and Housing Review
    • /
    • v.12 no.2
    • /
    • pp.121-139
    • /
    • 2021
  • Technical documents in the construction field are changing from paper documents to electronic ones. As a result, the industry witnesses a trend of using portable electronic devices in searching or retrieving necessary information such as relevant regulations. Despite the improvement in the accessibility to general technical documents, a limitation is still found in accessing the electronic documents on the regulations. We see the barrier for field engineers to enhance their technical knowledge. One of major barriers is that videos, animations, and virtual reality information to enhance the visual understanding of technical content related to regulations are not linked. It is the interactive electronic technical manual (IETM) that can address such issues. The IETM is an electronic document system that enables real-time information acquisition while operating in the form of conversations with users by linking multimedia functions to document types such as specifications and guidelines. This study establishes a model of the IETM that can be operated in the planning stage of a construction project. The study also verifies its usability with a hypothetical case study. This study aims to improve the usability of the IETM in the construction project by analyzing the application effect of the IETM using the AHP technique.

A Case Study of Back-analysis Technique in Tunnelling Using Extended Bayesian Method and Relative Convergence Measurement (확장 Baysian 방법과 상대변위를 이용한 터널 역해석 기법의 적용사례연구)

  • Lee In-Mo;Choi Min-Kwang;Cho Kook-Hwan;Lee Geun-Ha;Choi Chung-Sik
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.3
    • /
    • pp.109-118
    • /
    • 2005
  • It is a very difficult task to estimate engineering properties of the ground when designing underground structures, especially in tunnelling. Therefore, a feed-back system to combine the data measured in construction field with priorly estimated information at the design stage is necessary. In this paper, 3-dimensional back-analysis in tunnelling, to which only relative convergence is applied as input values, is carried out to estimate the optimum geotechnical parameters. For this purpose, the Extended Bayesian Method (EBM), which appropriately combines the objective information with the subjective one, is applied to optimize engineering parameters and 3-dimensional numerical analysis is carried out to predict a trend of relative convergence occurrence. The data measured from two tunnelling sites are used to verify the applicability of the proposed back-analysis technique. from the results of analysis, the proposed back-analysis technique is verified.

Constitution of Work Process for the Remodeling Construction Project in Planning Phase (건축물 리모델링 기획단계에서의 사업수행 프로세스 구축)

  • Kwon, Won;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.6
    • /
    • pp.165-174
    • /
    • 2006
  • Recently, the architecture remodeling is rising as new alternative for activating the construction market as the interest toward life cycle of buildings has increased. But the reality is that current remodeling business is suffering various types of difficulties in its performance due to the absence of general management technology and factor technology in systematic performance procedure or evaluation, etc toward remodeling effect, evaluation on performance, imperfect system for reflecting user requirements and remodeling life cycle ; planning, $feasibility ^{\circ}\hat{E}designing^{\circ}\hat{E}construction^{\circ}\hat{E}management$ along with lack of overall understanding on remodeling. Accordingly, this research has attempted to search for an effective management method through overall understanding in project performance by presenting work procedure of remodeling project and analysis items for decision making, etc centered on early planning stage out of three stages called planning, designing and construction.

Prediction of Final Construction Cost and Duration by Forecasting the Slopes of Cost and Time for Each Stage (공사 진행단계별 기울기 추정을 통한 최종 공사비 및 공기 예측)

  • Jin, Eui-Jae;Kwak, Soo-Nam;Kim, Du-Yon;Kim, Hyoung-Kwan;Han, Seung-Heon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.137-142
    • /
    • 2006
  • Cost and duration is important factors which directly affect profit therefore must be forecasted correctly to accomplish success of projects. So construction company uses EVMS(Earned Value Management System) to forecast final cost and duration. But previous forecasting model has low accuracy because of its linear forecasting method and can't reflect characteristic of company and project and changes as each progress. This paper presents cost and duration forecasting model using the slope prediction of cost and duration as each progress to reflect the various characteristics of construction industry. EVMS data of 23 road construction projects was used to make up regression analysis equation of slope forecasting model.

  • PDF

A Study on the Importance of Risk Factors for Effective Risk Management in the Pre-Project Planning Phase of the Development Projects (국내개발사업 사전기획단계에서의 효율적 리스크 관리를 위한 리스크 인자 중요도에 관한 연구)

  • Shin Kyu-Ho;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.75-86
    • /
    • 2002
  • The construction market is diversely changing because social environmental factors are rapidly transforming. Therefore, Construction projects are becoming complex and diverse. Furthermore, the risk being inherent in construction projects are increasing, and now people are considering about the risk management of construction projects in successfully handling the risk factor. The purpose of this study is first to comprehend the preparation of basic references for objective and systematic identification, categorization, and analysis of risk. Secondly it is to find the principle elements within the risk factors identified and categorized around planning process. Finally it is to manage objectively on the planning process, which forms a lot of uncertainty, in order to accentuate the importance about the risk of pre-planning process stage

Field Measurement and Modal Identification of Various Structures for Structural Health Monitoring

  • Yoshida, Akihiko;Tamura, Yukio
    • International Journal of High-Rise Buildings
    • /
    • v.4 no.1
    • /
    • pp.9-25
    • /
    • 2015
  • Field measurements of various structures have been conducted for many purposes. Measurement data obtained by field measurement is very useful to determine vibration characteristics including dynamic characteristics such as the damping ratio, natural frequency, and mode shape of a structure. In addition, results of field measurements and modal identification can be used for modal updating of FEM analysis, for checking the efficiency of damping devices and so on. This paper shows some examples of field measurements and modal identification for structural health monitoring. As the first example, changes of dynamic characteristics of a 15-story office building in four construction stages from the foundation stage to completion are described. The dynamic characteristics of each construction stage were modeled as accurately as possible by FEM, and the stiffness of the main structural frame was evaluated and the FEM results were compared with measurements performed on non-load-bearing elements. Simple FEM modal updating was also applied. As the next example, full-scale measurements were also carried out on a high-rise chimney, and the efficiency of the tuned mass damper was investigated by using two kinds of modal identification techniques. Good correspondence was shown with vibration characteristics obtained by the 2DOF-RD technique and the Frequency Domain Decomposition method. As the last example, the wind-induced response using RTK-GPS and the feasibility of hybrid use of FEM analysis and RTK-GPS for confirming the integrity of structures during strong typhoons were shown. The member stresses obtained by hybrid use of FEM analysis and RTK-GPS were close to the member stresses measured by strain gauges.