• Title/Summary/Keyword: Construction Stage Analysis

Search Result 923, Processing Time 0.023 seconds

A Case Study on the Analysis of Soft Ground Consolidation by the Measurement of Surface Settlement Plate (지표침하판계측을 통한 연약지반 침하분석 사례연구)

  • Kim, Joon-Seok
    • Journal of Urban Science
    • /
    • v.9 no.2
    • /
    • pp.51-56
    • /
    • 2020
  • The installation of soft ground instruments and the performance of measurement and management of the measurement shall be carried out in order to ensure the safety of the construction work and to improve the quality of the construction work. The purpose of the pressure density deposition calculation is to determine the stability of the foundation ground and the formulation by measuring and calculating the density conditions generated on the soil through the period of neglect after completion of the soil at each stage. In practice, it is judged that the analysis by the hyperbolic method can be applied to the safety side.

Analysis of the Characteristic for CO2 Emission Intensity of the Plane Types in Apartments (공동주택 평면유형조합에 따른 시공단계 CO2 배출원단위 특징 분석)

  • Choi, Doo-Sung;Chun, Hung-Chan;Cho, Kyun-Hyong
    • Journal of Korean Living Environment System
    • /
    • v.18 no.3
    • /
    • pp.330-337
    • /
    • 2011
  • This research quantified(/m2) the supplied materials at the construction stage of apartments, the main architecture form domestically, and presented the average CO2 emission by analyzing 50 apartment complexes. The results are as follows. CO2 emission of each type of constructions by supplied materials is architecture (78.8%), machine (8.8%), electricity (5.3%), civil engineering (3.4%), landscaping (3.4%), and communication (1.0%). The building construction charged about 79%. Average CO2 emission of total 50 apartment complexes according to supplied material expense appeared to be 950 kg-CO2/m2, and when core-type pillar was included CO2 emission largely increased.

Business Process Model for Progress Phase of Design-Build Project (설계시공일괄방식 사업의 진행단계별 업무프로세스 모델)

  • Song, Young-Woong;Son, Bo-Sik;Chun, Jae-Youl;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.38-49
    • /
    • 2009
  • In public project market, design-build projects have been increased because of market trend change which enables technical competition. In this condition, its importance is also getting important. Generally, life cycle of design-build project consists of planning, preliminary design, procurement, contract, detail design, start of construction, construction, end of construction, and evaluation. From contractor's viewpoint, it has problems such as difficulties in project management and information sharing because of frequent change of charged division. To solve these problems, it is desirable to change from function-based management system to process-based management system. The purpose of this study is to develop management process model for design-build project by progress phases. This study analyzed main conflicts and decision making factors of each stage in design-build projects, then systemized management subjects' responsibilities and management points' change. And also this study defined the key information that is the key point by project characteristics and progress phases. Based on this analysis, this study did business process modeling from planning stage to construction design check stage. At last, we proposed the way to manage business process by design-build project progress.

A Study on the Construction Cost Index for Calculating Conceptual Estimation : 1970-1999 (개략공사비 산출을 위한 공사비 지수 연구 : 1970-1999)

  • Nam, Song Hyun;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.40 no.5
    • /
    • pp.527-534
    • /
    • 2020
  • A significant factor in construction work is cost. At early- and advanced-stage design, costs should be calculated to derive realistic cost estimates according to unit price calculation. Based on these estimates, the economic feasibility of construction work is assessed, and whether to proceed is determined. Through the Korea Institute of Civil Engineering and Building Technology, the construction cost index has been calculated by indirect methods after both the producer price index and construction market labor have been reprocessed to easily adjust the price changes of construction costs in Korea, and the Institute has announced it since 2004. As of January 2000, however, the construction cost index was released, and this has a time constraint on the correction and use of past construction cost data to the present moment. Variables were calculated to compute a rough construction cost that utilized past construction costs through surveys of the producer price index and the construction market labor force consisting of the construction cost index. After significant independent variables among the many variables were selected through correlation analysis, the construction cost index from 1970 to 1999 was calculated and presented through multiple regression analysis. This study therefore has prominent significance in terms of proposing a method of calculating rough construction costs that utilize construction costs that pre-date the 2000s.

Analysis on the Safety of Structure and Economics of Replacement Method Using Rock Debris in the Soft Ground - Case Study of Miho Stream Crossing Road in Cheongju City (연약지반 암버럭 치환공법의 구조물 안정성과 경제성 분석 - 청주시 미호천 횡단도로를 대상으로)

  • Heo, Kang Kug;Park, Hyung Keun;Ahn, Byung Chul;Min, Byeong Uk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.4
    • /
    • pp.705-713
    • /
    • 2016
  • For the soft ground construction, the factors not considered in the design stage occurs in the construction stage so that they cause the increase of the construction cost due to the structural stability and the design change. The subject of the study is the construction section of the industrial complex access road made in the Ochang region of Chungcheongbuk-do. The study is concerned with selecting the soft ground handling method such as the replacement method using rock debris and the surcharge reflecting the service load as the soft ground handling measure and analyzing the effect of reducing the construction cost with the stability of structures and the reduction of the construction period. The soft ground in the study section consists of sandy and cohesive soil and is 2.4m to 5.5m deep. It is distributed unevenly between the 1.5m to 5.9m stratums under the ground surface. Settlement is not serious, but the future uneven settlement and difference are expected so that the future settlement behavior is estimated by analyzing the site measurement results after the soft ground treatment. Moreover, in consideration of the regional characteristics and economic efficiency, soil with good quality is replaced with rock debris as the replacement material so that 29% of the construction cost is reduced due to the increase of stability and the reduction of duration. If the estimation of the dispersion of the pore water pressure within the dam body and the change of the underground water level and the relation of the actually measured soft ground with consolidation is studied further on the basis of the study, it is expected that the behavior of the soft ground will be correctly estimated in various site conditions.

Improvement Plan Through Analysis of the Current Status of Construction Period Calculation of Public Construction Projects (공공 건축사업의 공사기간 산정 현황 분석을 통한 개선방안)

  • Lee, Jong-Tae;Yun, Hyun-Do
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.12-20
    • /
    • 2021
  • In order to secure construction quality and safety and prevent cost disputes, the importance of calculating 'the appropriate construction period' has recently emerged. It is necessary to analyze a considerable amount of historical data to establish the standard for calculating the construction period. However, many experts are raising questions about the use of past data due to changes in the construction business environment, such as shortening working hours, reinforcing quality regulations, and changing climate conditions. In addition, the possibility of errors increases when calculating a uniform construction period using historical statistics because the work order and productivity are very diverse according to construction conditions. Therefore, through this study, a new solution to change from the method of analyzing past data to the method of reviewing current production data through an active 'transformation of thoughts' was proposed through this study. In other words, the process of reviewing and calculating 'the appropriate construction period' was institutionalized by introducing 'process management experts' and 'construction experts by type of construction' in the design stage.

A Study on Cost-Benefit Analysis of BIM-based Integrated Design Process in Korean Architectural Offices (국내 설계사무소의 BIM기반 통합설계프로세스 도입에 따른 비용효과분석에 관한 연구)

  • Seo, Ji-Hyo;Choo, Seung-Yeon
    • Korean Journal of Computational Design and Engineering
    • /
    • v.15 no.4
    • /
    • pp.261-270
    • /
    • 2010
  • These days, architectural projects are becoming larger and more complex. And lots of information occurs through each phases and areas. For these reason, it is emphasized that collaboration with other parts. Therefore we need more effective architectural design process. However, it is difficult to collaborate in early stage with existing design process and it causes unnecessary spending of time and cost because of 2D-based working system. For solving these problem, we should introduce BIM-based Integrated Design Process which makes it possible to collaborate with other parts from early stage. Now the AEC industry in Korea has been trying to introduce BIM, and promoting variety of related business. However, for actual application of this system, it is unfortunately necessary to change various system throughout the construction industry. And this will cause lots of effort and expense. It is essential that scientific analysis and evaluation of efficiency and validity about this investment, because estimation of the investment and accompanying effects will provide reasonable standard of judgment for investment decision. Thus, this research conducted Cost-Benefit Analysis about BIM-based Integrated Design Process compared to existing design process. It is expected that this paper can be used for preliminary data in the future BIM market.

A Study on the Presumption of Construction Cost of Public Apartment by Analyzing Actual Construction Cost (실적공사비 분석을 통한 공공주택 공사비 추정에 관한 연구)

  • Yoon, Woo-Sung;Lee, Hyun-Chul;Lee, Han-Min;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.132-144
    • /
    • 2009
  • In this study, the basic data for calculating the proper construction cost as minimizing the uncertainty at the stage of forecasting construction cost with the basis of the analysis on the actual construction cost within completed domestic public apartment house. In this regard, 23 public apartment houses by each region which were ordered by the Korea National Housing Corporation and completed from 2004 to 2007 were selected as the objects of study. Four works such as common temporary installation, construction work, civil work and machine/equipment work which are the important direct cost items based on the actually inputted and settled construction costs were classified by completion year, region, architectural area, and the distribution type considering inflation rate. The sequent actual construction costs per 3.3m2 were compared and analyzed by each work, the proper construction costs were analogized and the calculating formula were presumed with the basis of average actual construction costs to be analyzed and presented.

Process Development and Verification for Construction VE Object Selection of Performance-Oriented (성능중심의 건설VE 대상 선정 프로세스 개발 및 검증)

  • Kim, Soo-Yong;Yang, Jin-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.25-32
    • /
    • 2012
  • The current VE activity is recognizing the VE object selection in job-plan simply as formal procedure. Therefore, many problems are happening in the process of selecting VE object during the preparatory stage. As a result of trying to analysis problems through literature review and expert interview, the problems were surveyed such as the lack of connectivity between preparatory stage and analytical stage, the temporal cost-based restrictions, and lack of recognition in VE team members in the existing method of selecting subjects centering on the high-cost field. Accordingly, this study suggested the improved method of selecting VE objects in order to solve this problem in the stage of selecting VE objects. An improvement method of selecting VE objects is what selects the secondary VE subjects by applying again Fish-Bone diagram and Worth technique based on the primary VE objects, which were selected by the conventional technique of selecting objects in the high-cost field. To verify effectiveness in the proposed improvement method, it tried to apply it to the actual case of the road construction VE project. As result of, the improvement method was analyzed to be considerably effective in comparison with the existing selection method of VE objects. Therefore, the Improvement method will contribute to increasing the VE performance.

The Case of CM as Applied to the Pre Design Phase - Focused on the Case of YongJu New Tobacco Manufacturing Plant - (설계 전 단계에서의 CM 적용 사례 - 영주 신 제조창 CM 사례를 중심으로 -)

  • Park Yong-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.19-26
    • /
    • 2003
  • In the face of the deterioration of tobacco manufacturing plant, we've got the plan for now manufacturing factory for the competitiveness, modernization, rationalization and environment. To achieve the goals, it was necessary to plan and investigate in the early stage of project. Consequently. We determined to introduce the CM in the early stage. We Performed the whole phase of CM services front the pre design phase services like feasibility analysis of site and building, plant master plan, selection of manufacturing facilities and drawing up the RFP, to maintenance management phase after the completion of a construction work. Contrary to the another CM projects, YongJu New Tobacco Manufacturing Plant CM organized the CM team with expert in field before the design development. This study analyze and evaluate the CM services of YongJu project which performed on the pre design phase. The purpose of this study is to emphasize the importance of pre design phase CM and support that CM services will start from the pre design phase.

  • PDF