• 제목/요약/키워드: Construction Stage Analysis

검색결과 923건 처리시간 0.024초

스풀형 압력제어밸브의 동특성 해석 (An Analysis of the Dynamic Characteristics of a Spool Type Pressure Control Valve)

  • 문강현;허준영
    • 드라이브 ㆍ 컨트롤
    • /
    • 제15권4호
    • /
    • pp.61-66
    • /
    • 2018
  • Almost every hydraulic system is equipped with a pressure relief valve, to maintain working pressure of the system at a pre-determined level. Thus, dynamic characteristics of such a relief valve, in conjunction with other hydraulic components, are important in designing the hydraulic control system. The single stage pressure relief valve is dynamically undesirable, due to relatively low viscous damping, that causes high frequency oscillations. This problem is overcome by introducing orifices in the inner pilot line, and drain line. In this study, for the single stage spool type pressure relief valve, the system equations were derived through an adequate linearisation and several simplifications were made, to use the transfer function formulation technique. All coefficients were evaluated and used, to make some results by using Matlab software. Results of analysis are compared with experimental results. In this study, parameters affecting stability of valve design are determined and suggested relative to the design.

시스템다이내믹스를 이용한 국내 기성금 제도 현황 분석 및 개선방안 제시 - 공공건설분야를 중심으로 - (An Analysis and Improvement of Progress Payment Regulations in Korea Using System Dynamics - Focusing on Public Construction Industry -)

  • 박문서;이정훈;이현수;황성주;김수영
    • 한국건설관리학회논문집
    • /
    • 제13권1호
    • /
    • pp.148-159
    • /
    • 2012
  • 최근 건설경기 위축으로 건설 계약자들의 치열한 수주 경쟁 및 수익성 저조에 따른 경영악화 현상이 심각한 수준에 이르고 있다. 이러한 상황에서 많은 건설관계자들은 "국가계약법"에 의해 공사비를 보호받을 수 있는 공공건설사업에 대한 의존도가 높아지고 있다. 그러나 이러한 법률적 규정이 존재함에도 불구하고 기성금 신청 및 지급과 관련된 문제가 지속적으로 발생하고 있으며, 이를 해결하기 위해 제시되는 대부분의 방안이 계약관계자간의 상호 영향도를 충분히 반영하지 못하고 있어 이를 정책적으로 반영하는데 어려움이 있다. 이에 본 연구에서는 공공건설사업 시공단계의 기성금 신청 및 지급에 대한 현행 규정제도를 바탕으로 신청 지연 및 지급지연에 따른 계약 관계자들의 상대적 영향도를 정량적으로 파악하고자 한다. 이를 위해 상호 관계성에 관한 지식을 바탕으로 통합적 시각에 따른 현상 분석이 가능한 시스템다이내믹스 모델을 통한 연구를 바탕으로 기성금 신청 및 지급 문제를 해결하기 위한 방안을 제시하였다.

중대재해처벌법 시행에 따른 건설현장 근로자와 관리자의 인식차 분석: 안전관리 실효성 향상 방안을 중심으로 (Analysis of Perception Differences between Construction Workers and Managers Implementing for the Severe Accident Punishment Act: Focused on Measures to Improve Safety Management Effectiveness)

  • 조재환;정성학
    • 대한안전경영과학회지
    • /
    • 제26권1호
    • /
    • pp.75-89
    • /
    • 2024
  • The objective of this study was to conduct research and analysis using Group Focus Interview to survey the between construction site workers and managers implementing for the Severe Accident Punishment Act. Focused on measures to improve safety management effectiveness for the effectiveness of establishing a safety management system. A plan to improve the efficient safety management system was presented to 50 construction industrial managers and workers. In order to ensure the industrial accident prevention policies appropriately, it is necessary to be aware of safety obligations for workers as well as business operators. In addition, despite the existence of a commentary on the Serious Accident Punishment Act, confusion in the field still persists, so in the event of a major accidents, the obligation to take safety and health education is strengthened, and effective case education is proposed by teaching actual accident cases suitable for actual working sites. It is necessary to make all training mandatory, and it is necessary to reconsider awareness through writing a daily safety log, awareness of risk factors, etc., and writing down risk information. Above all, at the construction ordering stage, it is necessary to keep the construction safety, request corrections and supplements for problems issues that arise, and consult between the orderer and the construction company about the problems issues. Rather than having only the construction company correct or supplement the safety management plan, the contents should be shared with supervisors and workers to establish a more practical solution. Results of this study will contribute to improving the effectiveness of the serious accident and construction safety management system.

자료 지향형 수위예측 모형의 비교 분석 (Comparison and analysis of data-derived stage prediction models)

  • 최승용;한건연;최현구
    • 한국습지학회지
    • /
    • 제13권3호
    • /
    • pp.547-565
    • /
    • 2011
  • 수위예측을 위해 개념적, 물리적 모형들을 포함한 다양한 유형의 기법들이 사용되고 있다. 그럼에도 불구하고 이러한 기법들 중 수위예측을 위해 단일의 우수한 모형을 선정하는 것은 매우 어려운 일이다. 최근에는 수문학적 과정의 복잡성으로 인해 기존 물리적 기반의 강우-유출 모형이 가지고 있는 단점들을 극복하고자 자료 지향형 수위예측 모형이 널리 도입되고 있다. 본 연구의 목적은 이러한 자료 지향형 모형 중 뉴로-퍼지와 회귀분석 모형의 수위예측에 대한 성능을 비교하는 것이다. 제안된 두 모형을 한강수계의 왕숙천에 대해 적용하였다. 제안된 두 모형의 성능을 평가하기 위해 평균제곱근오차, Nash-Suttcliffe 효율계수, 평균절대오차, 수정 결정계수와 같이 4개의 통계지표들을 사용하였다. 모의결과 뉴로-퍼지 수위예측 모형이 다중선형회귀 수위예측 모형보다 좀 더 나은 예측 결과를 나타내는 것을 확인할 수 있었다. 본 연구결과는 향후 중소하천에서 충분한 선행시간을 확보한 정확도 높은 홍수정보시스템의 구축에 활용할 수 있을 것으로 판단된다.

부동산 개발사업의 위험요인 중요도 평가 및 위험관리 방안 (Evaluation of the Importance of Risk Factors in Real Estate Development Projects and Their Risk Management)

  • 박재용;박원석
    • 한국경제지리학회지
    • /
    • 제13권4호
    • /
    • pp.681-696
    • /
    • 2010
  • 본 연구는 부동산 개발사업 각 단계별로 발생 가능한 위험요인의 중요도를 평가하고, 이에 대한 관리방안을 제시하는데 목적이 있다. 이를 위해 부동산 개발사업에 영향을 미칠 것으로 예상되는 단계별 위험요인을 선행연구를 통해 사전적으로 도출한 다음, 부동산 개발사업 전문가들을 대상으로 설문조사를 실시하여, 단계별 위험요인들의 중요도를 AHP 기법을 이용하여 평가했다. 본 연구결과를 요약하면 다음과 같다. 첫째, 부동산 개발사업의 대분류별 위험요인을 분석한 결과, 개발 전 단계에서는 기획 위험, 개발준비 단계에서는 개발사업 인허가 위험, 개발 단계에서는 현금흐름 위험이 가장 중요한 것으로 평가되었다. 둘째, 부동산 개발사업의 소분류별 위험요인을 분석한 결과, 개발 전 단계에서는 소비자 선호도의 변화, 개발준비 단계에서는 계약 및 인허가 관련업무, 개발 단계에서는 시행사 및 건설사의 부도, 관리 및 운영 단계에서는 사고 및 재해의 발생에 의한 시설보상이 가장 중요한 위험요인으로 평가되었다. 셋째, 이러한 위험요인의 중요도 평가결과에 따라 단계별 위험관리 방안을 제시했다.

  • PDF

Experimental and numerical analysis of seismic behaviour for recycled aggregate concrete filled circular steel tube frames

  • Xianggang Zhang;Gaoqiang Zhou;Xuyan Liu;Yuhui Fan;Ercong Meng;Junna Yang;Yajun Huang
    • Computers and Concrete
    • /
    • 제31권6호
    • /
    • pp.537-543
    • /
    • 2023
  • To study the seismic behavior of recycled aggregate concrete filled circular steel tube (RACFCST) frames, the seismic behavior experiment of RACFCST frame was carried out to measure the hysteresis curve, skeleton curve and other seismic behavior indexes. Moreover, based on the experimental study, a feasible numerical analysis model was established to analyze the finite element parameters of 8 RACFCST frame specimens, and the influence of different variation parameters on the seismic behavior index for RACFCST frame was revealed. The results showed that the skeleton curve of specimens under different axial compression ratios were divided into three stages: elastic stage, elastic-plastic stage and descending stage, and the descending stage was relatively stable, indicating that the specimen had stronger deformation capacity in the descending stage. With the increase of axial compression ratio, the peak bearing capacity of all specimens reduced gradually, and the reduction was less than 5%. With the decrease of beam-column linear stiffness ratio, the peak bearing capacity decreased gradually. With the decrease of yield bending moment ratio of beam-column, the peak bearing capacity decreased gradually, and the decreasing rate of peak bearing capacity gradually accelerated. In addition, compared with the axial compression ratio, the beam-column linear stiffness ratio and the yield bending moment ratio of beam-column had a more significant influence on the peak bearing capacity of RACFCST frame.

분류층 가스화기 특징 및 공정모사 분석 (Characteristics and Modeling Analysis of Entrained Flow Gasifiers)

  • 유정석;김유석;백민수
    • 신재생에너지
    • /
    • 제9권3호
    • /
    • pp.20-28
    • /
    • 2013
  • The gasification process has developed to convert coal into the more useful energy and material since decades. Despite the numberous design of ones, entrained flow gasifier of the major companies has had an advantage on the market. Because it has a merit of full-scale and high performance plant. In this paper, the gasification technologies of GE energy, Phillips, Siemens and Shell have been reviewed to compare their characteristics and a high performance gasification process was suggested. And the simulation model of gasifiers using Aspen Plus offered the quantitative comparison data for difference designs. The simulation results revealed the poor performance of the slurry feed than dry design. The corresponding cold gas efficiency of 77% is much lower than the 80.3% for the dry feed cases. The exergy analysis of the difference syngas quenching system showed that chemical quenching is superior to another. The results of analysis recommend the two stage gasifier with dry multi-feeder as the energy effective design.

Fuzzy 이론을 활용한 건설프로젝트 리스크 분석 및 평가 시스템 (FREES : Fuzzy Risk Evaluation Expert System)

  • 조익래;반찬식
    • 한국건설관리학회논문집
    • /
    • 제1권1호
    • /
    • pp.53-62
    • /
    • 2000
  • 본 연구는 건설 프로젝트의 초기 단계에서 미래에 발생할 수 있는 리스크를 리스크분할체계를 통하여 파악하고, 파악된 리스크를 효과적이고 체계적으로 분석 및 평가하여 프로젝트 초기단계에서 리스크를 분석하고 평가할 수 있는 절차와 계산틀을 제시하였다. 그에 따라, 프로젝트 기획 및 입찰 전 단계에서 건설공사 이행과정에서 발생할 가능성이 있는 리스크를 분석 및 평가하기 위해 FREES(Fuzzy Risk Evaluation Expert System)을 제안하였으며 가상 시나리오를 설정하여 모델에 대한 검증을 수행하였다. FREES는 기존의 IF-THEN 지식베이스를 사용한 전문가 시스템과 비교했을 경우 퍼지소속함수를 사용함으로써 규칙의 수를 현저하게 줄일 수 있으며 지식베이스의 구축과 변경 및 삭제 등이 용이하기 때문에 시간의 변화에 따라 다양하게 변화하는 리스크의 크기나 영향정도를 쉽게 반영할 수 있다.

  • PDF

What is a Critical Factor for Determining the Issue-Resolving Time in the BIM-based Coordination Process?

  • Jang, Sejun;Lee, Dongmin;Lee, Ghang
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.392-395
    • /
    • 2015
  • This study analyzes critical factors that affect issues of resolving time in BIM-based coordination using a case study. According to recent buildings that are meant to be more complex, BIM-based design coordination is regarded as an essential stage of the project delivery process. In the design coordination phase, a relocation of architectural, structural, mechanical, and electrical elements is conducted to avoid interference. In addition, the procedure of the development of each element in detail for the actual construction is carried out. Delays in coordination can affect delays in the entire delivery schedule of the project, and therefore many researches have focused on efficient coordination methods and how to shorten the period. In this study, we conducted a detailed analysis of the issue-resolving process using a case study, and found out that the participation of decision-makers for issue-resolving and the physical combination of trades affect delays in coordination time. In particular, we proposed the concept of organizational relation, indicating the level of decision-makers for issue-resolving, and the concept of physical relation, indicating the physical complexity of the issue, and we analyzed the effects of coordination delays.

  • PDF

IPA 분석을 활용한 주요 건설안전 계획업무 도출에 관한 연구 (Analyzing of Construction Safety Planning Tasks for Performance Improvement Using Importance Performance Analysis Method)

  • 강상훈;김대영;이동운
    • 한국건축시공학회지
    • /
    • 제20권1호
    • /
    • pp.73-81
    • /
    • 2020
  • 최근 4차 산업 시대의 흐름에 따라 건설공사에서는 최첨단 기술의 적용으로 나날이 발전하고 있는데 반해, 건설현장에서는 지속적인 안전사고가 발생하고 있다. 본 연구의 주목적은 안전관리자 계획단계에서 수행되는 업무들의 중요도와 예방효과를 전문가 의견을 통한 IPA 분석을 활용하여 상관관계를 도출하고 안전관리에 기여할 수 있는 주요 안전 계획 업무와 개선이 필요한 업무를 파악함으로써, 궁극적으로 건설안전재해사고 발생을 줄이는 데 있다.