Browse > Article
http://dx.doi.org/10.5345/JKIBC.2020.20.1.073

Analyzing of Construction Safety Planning Tasks for Performance Improvement Using Importance Performance Analysis Method  

Kang, Sang-Hun (Dept. of Architectural Engineering, Pusan National University)
Kim, Dae Young (Dept. of Architectural Engineering, Pusan National University)
Lee, Dong-Un (Dept. of Architectural Engineering, Dongseo University)
Publication Information
Journal of the Korea Institute of Building Construction / v.20, no.1, 2020 , pp. 73-81 More about this Journal
Abstract
The main purpose of the study is to reduce the accident death rate in the construction industry. To achieve this goal, the safety planning tasks were analyzed and assessed in terms of the importance and preventive effects of the tasks. Through the extensive literature reviews, the safety planning tasks were identified and reviewed by safety managers. based on the safety planning tasks developed in the previous stage, a survey was conducted in order to receive responses by experts with knowledge on the effects and importance of preventive measures for safety. Then, the Importance Performance Analysis(IPA) method was employed to identify the safety manager's tasks that have an effect on performance indicators. Advice and guidance on making the employment rules, etc. (#18) and details about participation and consultation at the Occupational Safety and Health Committee (#16) were found to require revision and improvement of details and guidelines. The effective safety tasks identified are expected to have a critical role in reducing the accident death rate in the construction industry.
Keywords
safety construction; safety manager; safety planning tasks; importance performance analysis method; preventive effect;
Citations & Related Records
Times Cited By KSCI : 9  (Citation Analysis)
연도 인용수 순위
1 Kim EJ. Analysis on the factors of construction disaster applying the AHP. Journal of the Regional Association of Architectural Institute of Korea. 2018 Feb;20(1):197-204.
2 Jang YR, Ko SS. A risk assessment counterplan for reducing the accident rates in medium and small sized construction sites. Korean Journal of Construction Engineering and Management. 2018 Sep;19(5):90-100. http://doi.org/10.6106/KJCEM.2018.19.5.090   DOI
3 Kim PK, Bang SD, Kim GS, Kim HG. Research of actual condition and mitigation plan for aging worekrs' health and safety at construction sites. Korean Journal of Construction Engineering and Management. 2017 Jan;18(1):37-47. http://doi.org/10.6106/KJCEM.2017.18.1.037   DOI
4 Sin WS, Son CB. An awareness analysis on the design for safety of construction project and its improvement. Journal of the Korea Institute of Building Construction. 2019 Aug 20;19(4):351-9. http://doi.org/10.5345/JKIBC.2019.19.4.351   DOI
5 Park KH, Song HD. Job competency analysis for construction site safety manager. Korean review of crisis and emergency management. 2015 May;11(5):233-54.
6 Kang SG, No SH, Kim GW, Park MJ, Jo EM. A comparative study about the industrial health and safety laws of germany, france, austria, and netherlands in europe. Incheon (Korea): Occupational Safety and Health Research Institute; 2009 Dec. 212 p. Report No.: 2009-118-1345.
7 Alarcon LF, Acuna D, Diethelm S, Pellicer E. Strategies for improving safety performance in construction firms. Accident Analysis & Prevention, 2016 Sep;94:107-18. http://doi.org/10.1016/j.aap.2016.05.021   DOI
8 Saman A, Murat G, Rifat S. Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects. Journal of Safety Research. 2013 May;46:99-105. https://doi.org/10.1016/j.jsr.2013.05.003   DOI
9 Choudhry RM, Fang D, Ahmed SM. Safety management in construction: Best practices in Hong Kong. Journal of professional issues in engineering education and practice. 2018 Sep;134(1):20-32. http://doi.org/10.1061/(ASCE)1052-3928(2008)134:1(20)   DOI
10 Stringfellow P. Construction contractors involvement in dister management planning. Australasian Journal of Construction Economics and Building. 2014 Jun;14(2):120-32. http://doi.org/10.5130/ajceb.v14i2.3912   DOI
11 Kristiina S, Sijie Z, Jochen T, Charles M, Eastman, Markku K, Ilkka R, Lief G. Utilization of BIM-based automated safety checking in construction planning. In Proceedings of the 19th International CIB World Building Congress; 2013 May 5-9; Brisbane, Australia. 2013. 5-9.
12 Hong SH, Jung DW, Oh CD. Analysis of competence factors assessment for specialty contractors' employees using IPA. Korea Journal of Construction Engineering and Management. 2015 Sep;16(5):21-30. http://doi.org/10.6106/KJCEM.2015.16.5.021   DOI