• Title/Summary/Keyword: Construction Schedule

Search Result 747, Processing Time 0.022 seconds

A study of the replacement of desulphurization slag for sand to ready-mixed soil materials (RMSM)

  • Shiha, Yi-Fang;Tseng, Shih-Shong;Wang, Her-Yung;Wei, Chih-Ting
    • Computers and Concrete
    • /
    • v.17 no.3
    • /
    • pp.423-433
    • /
    • 2016
  • After the industrial of steelmaking by-products are processed properly, they can be used in civil engineering, not only as a substitute for natural resources and to reduce costs, but also to provide environmental protection. This study used different amounts (10%, 20%, 30%, 40%,and 50%) of desulphurization slag to replace natural fine aggregates in ready-mixed soil materials, and tested the physical and fresh properties (slump, slump flow, tube flow, initial setting time, and bleeding) and hardened properties (compressive strength, ball drop, ultrasonic pulse velocity) of the materials. The variations between the performances of the materials with different mix proportions were discussed. When desulphurization slag is used in RMSM, the workability can be enhanced obviously significantly. When the replacement of desulphurization slag is 50%, the slump flow is increased by 110mm compared with the control group, and the initial setting time increases as the replacement increases, because of bleeding. When the replacement is 10% and 20%, the compressive strength at various ages is higher than that of the control group. When the replacement is 10%, the compressive strength at 7 days is higher than that of the control group by 60%, and the ultrasonic pulse velocity is proportional to the compressive strength, which increases with age and decrease as the replacement increases. An appropriate replacement can effectively accelerate construction, and allow projects to be finished ahead of schedule; therefore, an appropriate replacement, is applicable for ready-mixed soil materials.

A Performance Evaluation of Zone Smoke Control Systems for Railway Underground Transit Passage by Smoke Control TAB (제연 TAB를 통한 철도 지하환승통로의 거실제연설비 성능평가)

  • Seol, Seok-Kyun;Kim, Joon-Hwan;Park, Min-Seok;Oh, Seung-Min;Ahn, Yong-Chul;Choi, Jun-Ho
    • Fire Science and Engineering
    • /
    • v.31 no.1
    • /
    • pp.1-9
    • /
    • 2017
  • This study conducted Testing, Adjusting, and Balancing (TAB), which is a type of field performance evaluation experiment of a zone smoke-control system, at a railway underground transit passage installed with a zone smoke- control system to find problems and improvements for ensuring performance. TAB for the smoke control system was classified into several procedures, such as design data review, duct leakage test, field measurement of the airflow rate, velocity of the fan and duct, and a smoke test. Through the duct leakage test, the system leakage ratio was examined to prove the duct sealing. The iImprovement of the smoke control airflow problems due to the lack of fan static pressure loss was the secured performance. The performance of the smoke control fan was secured by improvements of the smoke control airflow rate problems caused by the loss of static pressure in the intake duct. The smoke test in the smoke control zone confirmed that the damper operating schedule subject was influenced by natural wind or train wind.

Construction of an Educational Computer Model for FAB of Semiconductor Manufacturing (반도체 웨이퍼 가공(FAD) 공정에서의 교육용 컴퓨터 모델 구축)

  • Jeon, Dong-Hoon;Lee, Chil-Gee
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.6 no.3
    • /
    • pp.311-318
    • /
    • 2000
  • The importance of the semiconductor industry in Korea has been growing, but the manufacturers are experiencing two major problems: poor optimization of production and low localization ratio of production equipments. Due to the complex manufacturing processes and special features such as OTD (On Time Delivery) and LIPAS (Line Item Performance Against Schedule) possibilities, several attempts to apply MRP or spreadsheet have been failed to meet the expectations. This paper describes the computer modeling technique as the solutions to analyze the problem, to formalize the semiconductor manufacturing process, and to build an advanced manufacturing environments. The computer simulation models are built referring the FAB facilities of the National Inter - University Semiconductor Research Center to show the FAB processes and the functions of each process.

  • PDF

An Analysis for Transferring Connectivity at Incheon international Airport (허브공항의 환승연계성 분석연구(인천국제공항을 대상으로))

  • Park, Yong-Hwa;Kim, Seong-Yeong;Kim, Jung-Yeop
    • Journal of Korean Society of Transportation
    • /
    • v.24 no.6 s.92
    • /
    • pp.75-85
    • /
    • 2006
  • Recently. large number of countires have been focused on the construction of container seaport and hub airport to enrole as the center of logistics. In particular, the East Asian nations have been enhanced their airports' facilities in order to accommodate for demand of global market environment. In Korea, Incheon International Airport (ICN) was opened in 2001 to take leading role as the Northeast Asian main hub airport. The purpose of this research is to analyze the transferring connectivity at ICN. To analyze its connectivity, this research has been applies two methodologies ; wane structure and minimum or maximun connection time analysis It has analyzed the temporal configuration as the frequency and quality of indirect connections offered by an airline by adopting a wave-system structure in the airline flight schedule. As an empirical analysis, it also calculated the minimum and maximum connection time adopting Korean Air's flight information.

A correlation method for high-frequency response of a cargo during dry transport in high seas

  • Vinayan, Vimal;Zou, Jun
    • Ocean Systems Engineering
    • /
    • v.6 no.2
    • /
    • pp.143-159
    • /
    • 2016
  • Cargo, such as a Tension Leg Platform (TLP), Semi-submersible platform (Semi), Spar or a circular Floating Production Storage and Offloading (FPSO), are frequently dry-transported on a Heavy Lift Vessel (HLV) from the point of construction to the point of installation. The voyage can span months and the overhanging portions of the hull can be subject to frequent wave slamming events in rough weather. Tie-downs or sea-fastening are usually provided to ensure the safety of the cargo during the voyage and to keep the extreme responses of the cargo, primarily for the installed equipment and facilities, within the design limits. The proper design of the tie-down is dependent on the accurate prediction of the wave slamming loads the cargo will experience during the voyage. This is a difficult task and model testing is a widely accepted and adopted method to obtain reliable sea-fastening loads and extreme accelerations. However, it is crucial to realize the difference in the inherent stiffness of the instrument that is used to measure the tri-axial sea fastening loads and the prototype design of the tie-downs. It is practically not possible to scale the tri-axial load measuring instrument stiffness to reflect the real tie-down stiffness during tests. A correlation method is required to systematically and consistently account for the stiffness differences and correct the measured results. Direct application of the measured load tends to be conservative and lead to over-design that can reflect on the overall cost and schedule of the project. The objective here is to employ the established correlation method to provide proper high-frequency responses to topsides and hull design teams. In addition, guidance for optimizing tie-down design to avoid damage to the installed equipment, facilities and structural members can be provided.

Design and Lay Out of Propulsion Test Facilities for KSLV-II (한국형발사체(KSLV-II) 추진기관 시험설비 배치 및 설계)

  • Han, Yeoung-Min;Cho, Nam-Kyung;Chung, Young-Gahp;Kim, Seung-Han;Yu, Byung-Il;Lee, Kwang-Jin;Kim, Jin-Sun;Kim, Ji-Hoon
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2011.11a
    • /
    • pp.56-61
    • /
    • 2011
  • The deign and lay-out of a combustion chamber test facility(CTF), a turbopump real propellant test facility(TPTF), a rocket engine test facility for 3rd stage engine(SReTF), a rocket engine ground/high altitude test facility(ReTF, HAReTF) and a propulsion system test complex(PSTC) for KSLV-II is briefly described. The development/qualification tests of engine component, 3rd stage engine system and 75ton-class liquid rocket engine system will be performed in CTF, TPTF, SReTF, ReTF and HAReTF and the development test of 1st/2nd/3rd propulsion systems for KSLV-II will be performed in PSTC. These propulsion test facilities will be built in NARO space center considering construction schedule, cost, safety distance and utility factor of propulsion test facilities.

  • PDF

The design of 111m high steel towers with 220kv double circuits crossing 12 km wide Bangladesh River (230KV 2회선승 111M 높이 철탑설계 (I) (강폭 12km인 Bangladesh Jamana강 횡단용))

  • 이재숙
    • Journal of the Korean Professional Engineers Association
    • /
    • v.15 no.4
    • /
    • pp.12-24
    • /
    • 1982
  • East Parts of Bangladesh have been benifited by low cost energy generated by domestic natural gas but West parts where energy generated by imported fuel. Bangladesh Government authority has very much concerned to transmit the low cost electricity to the West from the East for past several years. To solve such concerns, cross-country 230kv double circuits Power transmission line was proposed, however there was a big obstacle for the realization of this line to cross the Jamuna river which has 12 km long width with a deep muddy river bed. A consultant engineering firm named Merz-Mclellan anyway finalized this plan and a world-wide bid was announced on June 31, 1979. Due to the expected difficulty to construct the towers on sea like area, only three construction groups have participated. including a Korean joint venture organization of Samsung-Korean Developement corporation-Kolon Electric Machinery company. After 3 months bid evaluation, contract was awarded to Korean Consosium and KEM Co was in charge of designing steel towers with anchor bolts and base plates beside to electrical engineering field. Then KEM Co have faced and over-comed many unenpected technical difficulties such as forced eccentricity joint on base plate, distorsion issue of 60mm thick plates welding, threading anchor bolts, tad heat treatment of some anchor bolts, disagreement from Consultant Engineer on multiplying factor of leg stresses for 45$^{\circ}$ wind and on reducing O.L.F for wind loads on cables for such 1220km long spans. After spending two years long period for designing and engineering towers, base plates, and anchor bolts, first shipment of tower was finally realized on Nov. 8, 1981 and on the other hand KDD has proceeded concrete caisson work on schedule at Jamuna river site and expected to complete tower erection and stringing of cables within this year of 1982 which was original completion target.

  • PDF

Peak-time Characteristics and Parking Apron Requirements of Korean Airports (국내공항의 항공기 운항 첨두 특성과 첨두시 주기장 소요에 관한 연구)

  • Yoo, Seung-Gwon;Lee, Yeong-Heok
    • Journal of Korean Society of Transportation
    • /
    • v.21 no.6
    • /
    • pp.27-42
    • /
    • 2003
  • The basis for planning airport development is the specific demand at peak hour among various aviation demands. The demand at peak hour is regarded to be the source which enables us to estimate the size requirement and capacity of an airport facility. The distribution type of peak hour-operation depends on the difference of aircraft route, geographical location of airport, passengers and cargo. The demand at peak hour is calculated with peak hour factor. So far, the features of peak hour adopted for domestic airport construction plan have been based on the foreign research results. However, it is officially unconfirmed whether the various peak hour characteristics or peak hour factor suggested from foreign studies can be compatible with Korean state or not. In this study, the aircraft operation pattern and the peak hour characteristics are analyzed with hourly data using the operation schedule of an airport for the last 5 years and the actual result statistics of Korean air transportation by airport through the recent 10 Years. After the peak hour factor of the airports is calculated and compared with existing research results, peak hour factor by annual operation frequency is suggested for Korean airports.

A Study on Database System for Hostorical Booking of Korean Railroad (한국철도의 예약실적 데이터베이스 시스템에 관한 연구)

  • Oh, Seog-Moon;Hwang, Jong-Gyu;Hyeon, Seung-Ho;Kim, Yong-Gyu;Lee, Jong-Woo;Kim, Young-Hoon;Hong, Soon-Heum;Park, Jong-Bin
    • Proceedings of the KIEE Conference
    • /
    • 1998.07a
    • /
    • pp.371-374
    • /
    • 1998
  • The construction of the transportation history database system is to serve the scheduling and seat inventory controling. Recently, lots of countries have been faced with the advance era because of the new railway transportation system, like the high speed railway and/or magnetic levitation vehicle system. This can be reasonably translated as those of operators are willing to provide the more various and high quality schedule to the customer. Those operators these ideas make possible to forecast that scheduling process is going to be complicated more and more. The seat inventory control, so to speak Yield Management System(YMS), goes a long way to improve the total passenger revenue at the railway business. The YMS forecasts the number of the last reservation value(DCP# END) and recommends the optimal values on the seat sales. The history database system contains infra-data(ie, train, seat, sales) that will be the foundation of scheduling and seat inventory control application programs. The development of the application programs are reserved to the next step. The database system is installed on the pc platform (IBM compatible), using the DB2(RDBMS). And at next step, the platform and DBMS will be considered whether they can meet the users' requirement or not.

  • PDF

Problem and Improvement of the Computerization Practice Real - estate Registration

  • Youn, Sung-Ho;Kim, Moon-sung
    • Journal of the Korea Society of Computer and Information
    • /
    • v.21 no.1
    • /
    • pp.161-168
    • /
    • 2016
  • It has become the information medium that mediate between individuals of marketing with the new information media that use of the Internet in accordance with the progress of the IT industry- real estate marketing, real estate leasing, real estate auctions, etc. The real estate registration services should be disclosed to outside that include a schedule details the public book-register and problems caused by it should be reasonably resolved by handling a large amount of real estate registration work quickly, accurately handling to utilize Information Technology(IT) through the information system construction as the feature to process the information of register entries. Computerization of real estate registration will raise the efficiency of the registration as well as people can see the information related to real estate on the basis of published content without limitation the time and place and will pursue the ideal and reliability of the registration -web accessibility improving of the Internet Registry and permanent storage of preserving documents by electronic means. It is very large that impact on the real estate transaction if the accuracy of legal registration choosing formalism in the processing of real estate registration business through the Internet than written application is highly probable to occur incorrect registration. Also, It is necessary to manage it effectively -if you do not quickly and exactly respond to it, there is problems such as delays or poor registration service because real estate business activated and real estate registration services also increased sharply. In this paper, we will identify the problems of the real estate registration work and suggest improvements about it.