A STUDY ON DURATION ESTIMATE METHOD USING STOCHASTIC MODEL IN THE BIM ENVIRONMENT

  • Jae H. Park;Seok H. Yun;Joon H. Paek
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1209-1215
    • /
    • 2009
  • Recently, Construction Projects are being much bigger and more complex. So the importance of Construction Planning and Management is increasing and increasing because of the Construction Projects is involved in a variety of construction-related subjects. Competitive of the Construction Industry decided Cost, Construction Duration and Productivity. But they were just focused on Cost Saving instead of Construction Duration and Productivity. However, they have to finish construction projects using minimum cost and duration with quality and function of required level for successful Construction projects. Thus, current high exchange rate and high period, it is clear to decrease construction cost and to do economic construction in huge Construction Projects and it means more advanced Construction Schedule Management needs for economic construction. But Construction Scheduling Planning, basic of Construction Schedule Management, adjusted contract period without Pre-Planning, just depending on experience and ability of Construction Engineer. Because of that, this study suggests new Duration Estimate Method using Stochastic Model in BIM Environment for advanced Construction Schedule Management. Existing Duration Estimate Methods are just modified wrong points of them or analyzed effective factors of construction schedule. However, New Duration Estimate Method is just consists of Stochastic Model and BIM Environment without existing Duration Estimate Methods. So, new method has creativity and specialty. After this research, it would be a great model in construction industry field.

  • PDF

Development of a Flash-based Schedule Management Tool for Smart Devices

  • Jang, Myunghoun
    • 한국건축시공학회지
    • /
    • 제12권6호
    • /
    • pp.558-565
    • /
    • 2012
  • Schedule management of construction work is critical to completing construction projects within a given period of time. Many efforts have been made and multiple tools have been developed to support the management of construction projects using smart devices such as smartphones and tablet PCs. This study proposed a method for managing construction schedules via a smart device using Flash. The interactive and graphic properties of Flash enable the development of an app that can allow a field manager to manage schedules easily and efficiently. A prototype was implemented using Adobe Flex Builder, and a sample network was applied in a smartphone. It is convenient for a construction manager to manage construction schedules using the tool because Flash controls graphic components easily. In further studies, network diagrams such as CPM (Critical Path Method) should be developed and applied to the app.

철도시설공사의 현장 공정관리를 위한 원격 영상 운영체계 개발 (Development of Telepresence System for Schedule Management in Railway Construction Project)

  • 강인석;김현승;박진정;문현석;신민호
    • 한국철도학회논문집
    • /
    • 제13권1호
    • /
    • pp.23-30
    • /
    • 2010
  • 4D CAD에 의한 건설공사 공정관리시스템은 가상건설기법의 그래픽에 의한 계획일정위주 공정관리에 중점을 두고 있으므로 실제 현장상황의 판단에 의한 진도관리가 어려운부분이 있다. 본 연구는 4D CAD기반의 공정관리에 현장 웹카메라를 갖춘 Telepresence 기법을 이용한 원격현장 실시간 진도관리 모니터링체계를 연동하는 공정관기시스템 개발을 시도하고 있다. 개발된 시스템은 철도시설공사에 적용하여 활용성을 검증하였으며, 4D CAD에 의한 계획 공정현황과 웹카메라에 의한 실시간 실제현장 영상을 비교하여 시각적 진도관리를 가능하게 할 수 있다.

IPA 방법을 활용한 국내 건설 산업 공정관리 역량 평가 (Evaluating Schedule Management Capability in Korean Construction Industry through Importance-Performance Analysis)

  • 이진강;송보현;김다인;최재현
    • 한국건축시공학회지
    • /
    • 제24권1호
    • /
    • pp.145-156
    • /
    • 2024
  • 건설 프로젝트의 규모와 복잡성이 커지는 가운데, 체계적이고 통합적인 공정관리의 실행은 국내 건설 산업의 도전과제로 남아있다. 이러한 배경에서 본 연구는 먼저 종합적인 관점에서 공정관리 역량을 제도 및 규정, 발주자 요구사항, 전문 인력 및 조직, 공정관리 관련 업무, 스마트건설 기술 활용 5개 분야로 정의하였다. 그리고 국내 건설 산업 종사자를 대상으로 각 분야별 공정관리 역량 요소별로 중요성과 현재수준을 평가하는 설문을 진행하고 IPA분석을 실시하여 국내 건설 산업의 공정관리 역량을 분석하였다. 이를 통해 공정관리 역량을 구성하는 다양한 요소를 대상으로 중요성을 인식되고 있지만, 현재 수준과의 격차가 존재함을 밝혀, 개선이 필요한 영역을 제시하였다. 특히 개선이 필요한 영역으로는 발주처의 공정 관리를 위한 예산 확보, 공사 기간의 적정성 산전 및 평가기준 수립, 현장 공정 관리 인력의 배치, 공정 관리 소프트웨어에 대한 투자 등이 꼽혔다. 이와 같이 본 연구는 국내 건설 산업의 공정 관리 역량에 대한 자세한 시각과 개선방향을 제시하였으며, 이는 공정관리 실무적용을 활성화하는데 도움이 될 것으로 기대된다.

SIMPLIFIED SIMULATION APPROACH TO MANAGING SCHEDULE-OVERRUN RISKS IN CONSTRUCTION OPERATIONS

  • Wah-Ho CHAN;Ming LU
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.929-934
    • /
    • 2005
  • The complex and dynamic job nature and the ever-changing working environment of construction projects inevitably present uncertainties to construction operations. Identification, evaluation and control of uncertainties constitute main elements of risk management and critical tasks of project management in construction. This paper is focused on application of a simplified discrete-event simulation approach in management of schedule-overrun risks, each being the combination of the occurrence probability of an uncertain interruptive factor and its potential consequence in terms of time delay. A case study observed from a concreting operation in Hong Kong is converted into a simulation model and analyzed with an in-house-developed simulation package for demonstrating how the proposed approach can be implemented to manage multiple schedule-overrun risks on construction projects.

  • PDF

선형 공정계획 모델의 작업 관계성 적용 방법 (A Method of Applying Work Relationships for a Linear Scheduling Model)

  • 류한국
    • 한국건축시공학회지
    • /
    • 제10권4호
    • /
    • pp.31-39
    • /
    • 2010
  • 선형 공정계획 방법은 1929년 엠파이어 스테이트 빌딩에서 그래픽한 용도로 사용되면서 현재는 다양한 작업 공간, 현장 작업과 조립 작업에 적용되고 있다. 선형 공정계획 상에 동시적인 크리티칼 패스가 발생하면 자원 관리는 작업흐름의 최적화 문제로 연결되어 유연한 작업생산성과 지속적인 자원의 할당을 하기 위해 적용되고 있다. 그러나 선형 공정계획 모델 연구에서 간과하고 있는 선형 공정계획 모델의 작업 관계성을 고려하는 것이 필요하다. 이에 본 연구는 선형 공정계획 모델에 관한 기존 연구를 분석하여 네트워크 공정표의 관계성을 선형 공정표에 적용할 수 있는 방법을 제시한다. 네트워크 공정표를 선형공정표로 변환 시에 발생하는 작업의 관계성을 고찰하고 건축물의 물리적 층수 변화와 같이 작업공간의 변화에 따라 선형 공정표에 반영되어야 할 선형 공정표상의 액티비티의 이동 문제를 고찰하여 네트워크 공정표를 선형 공정표로 호환할 수 있는 시스템 개발을 위한 기초연구를 제공하는 것이 본 연구의 목적이다.

Automated Methodology for Linking BIM Objects with Cost and Schedule Information by utilizing Geometry Breakdown Structure (GBS)

  • Lee, Kwangjin;Jung, Youngsoo
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.637-638
    • /
    • 2015
  • There has been growing interests in life-cycle project management in the construction industry. A lot of attention is given to Building Information Modeling (BIM) which stores and uses a variety of construction information for the life cycle of project management. However, due to the additional workload arising from BIM, its expected effects versus its input costs are still under discussion in practice. As an attempt to address this issue, one of previous studies suggested an automated linking process by developing Standard Classification Numbering System (SCNS) and Geometry Breakdown Structure (GBS) to enhance the efficiency of integration process of BIM objects, cost, and schedule. Though SCNS and GBS facilitates identifying all different dataset, making object sets and linking schedule activities still needs to be manually done without having an automated tool. In this context, the purpose of this paper is to develop and validate a fully automated integration system for 3D-objects, cost, and schedule. A prototype system for single family homes (Hanok) was developed and tested in order to verify its efficiency.

  • PDF

리모델링 공사의 공기지연을 야기하는 리스크 요인 - 오피스 건축물을 중심으로 - (Risk Factors Influencing the Delays on the Remodeling Construction Works - Focused on Office Building Projects -)

  • 조규만;김태훈
    • 한국건축시공학회지
    • /
    • 제18권4호
    • /
    • pp.385-394
    • /
    • 2018
  • 오피스 건축물의 리모델링 사업에서, 신축과는 다른 리모델링 사업의 다양한 리스크로 인해 공기가 지연되는 사례가 빈번하게 보고되고 있다. 이에 본 연구에서는 리모델링 프로젝트의 리스크 요인들과 리모델링 공사의 작업별 공기지연 발생가능성의 관계를 분석하고자 수행되었다. 리모델링 사업의 경험이 있는 29명의 전문가 면담결과의 과학적 통계적 분석을 통해, 리모델링 사업의 리스크 요인과 그로 인한 작업별 공기지연 가능성을 크게 3가지 측면에서 분석하였다. 즉, (i) 리모델링 공사의 작업별 공기지연 가능성, (ii) 리모델링 공사의 리스크 요인별 중요도, (iii) 리모델링 공사의 공기지연에 영향을 미치는 리스크 요인 등 세가지 분석결과를 제시하였다.

건축공사 착공 전 단계의 공정리스크 관리도구 개발 - 철골공사 중심으로 - (The Development of Schedule Risk Management Tools at the Preconstruction Phase in Building Construction - Focused on the Steel Work -)

  • 서상욱;윤유상;김선국
    • 한국건설관리학회논문집
    • /
    • 제6권1호
    • /
    • pp.177-185
    • /
    • 2005
  • 건축공사에서의 리스크 관리자들은 전체 공기에 영향을 미치는 공정리스크 관리에 대한 중요성에 대해 공감하고 있지만 그 에 대한관리 절차 및 도구 등이 체계화되어 있지 않아 공정관리에 어려움을 겪고 있다. 또한 기존의 리스크 관련 연구에서의 리스크 분류체계는 현장업무 중심으로 이루어지지 않아 실용화되기에 한계가 있다. 따라서 본 연구에서는 전체 공정에 많은 영향을 미치는 철골공사를 대상으로 공사 프로세스 중심의 리스크 분류체계와 주요 공정 리스크 요인과 연계한 업무 플로우를 제시하였고, 공정리스크 관리업무의 효율성을 제고하기 위해 공정리스크 중요도를 분석하였으며, 이를 기반으로 공정 리스크 요인별 대응방안 및 세부대책으로 이루어진 공정 리스크 관리 도구를 개발하였다.

DSM을 이용한 건설사업 공정관리에 관한 연구 (A Study on Schedule Management in Construction Project Using the Dependency Structure Matrix(DSM))

  • 장세훈;박문서;이현수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.682-686
    • /
    • 2007
  • 건설사업은 다양한 시대적 요구를 충족시키기 위해 매우 다변화되었고, 그에 따라 참여주체들이 많아지고 복잡성이 증가하게 되었으며, 사업의 규모 측면에 있어서도 날로 대형화되어 가고 있는 실정이다. 하지만 현재의 건설 프로젝트 공정관리 수준은 1950년대에 만들어진 PERT나 CPM을 반세기가 지난 지금까지 그대로 사용하고 있을 정도로 후진성을 면치 못하고 있다. 또한 현재의 공정관리는 결과위주의 방식으로 건설사업 과정에서 나타나는 작업 간의 정보의 흐름과 변이요소의 발생을 충분히 고려하지 못하고 있다. 따라서 본 연구에서는 기존의 공정관리도구들의 단점을 개선하고 공정관리기술의 한계를 극복하기 위하여, 국내에는 잘 알려지지 않은 설계관리기법인 DSM(Dependency Structure Matrix)를 도입하여 건설사업 공정관리에 대한 적용성을 고찰해보고자 한다.

  • PDF