• Title/Summary/Keyword: Construction Resource Management

Search Result 494, Processing Time 0.036 seconds

Organizational Program Management of Multiple Maintenance Projects Under Fund Constraints (복수 개${\cdot}$보수 프로젝트의 자금제약하 프로그램 관리 - 자원제약 마스터-일정계획을 중심으로 -)

  • Koo Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.211-218
    • /
    • 2004
  • In a large owner organization, a program manager of multiple maintenance and remodeling projects has experienced increasing scale and complexity of coordinating the M/R projects with in-house technicians who belong to multiple trade shops. This paper proposes a dual-level hierarchical planning strategy that consists of a program master plan in the long-term horizon and a master construction schedule in an operational scheduling window. A rolling horizon approach to the program master plan is proposed to deal with the external uncertainty of unknown stream of project requests. A resource-constrained scheduling algorithm is developed to generate the master construction schedule in a scheduling window. During development of the algorithm, more emphasis is placed on long-term organizational resource continuity, especially flow management of program constraint resources, than ephemeral events of an individual activity and project. Monte Carlo simulation experiments of three scheduling windows are used to evaluate the relative performance of the proposed scheduling algorithm against three popular scheduling heuristics for resource-constrained multiple projects.

Korean Engineering Firms' Competitiveness Change for the Last Decade

  • Jung, Mincheol;Kim, Handon;Choi, Seeun;Cho, Hyunsang;Oh, Donggeun;Kim, Jimin;Jang, Hyounseung
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.599-607
    • /
    • 2022
  • Recently, there has been a steady decrease in the proportion of the construction sector among Korean engineering firms. Thus it is essential for Korean engineering firms in the construction sector, which lack experience in overseas ventures, to identify and improve their competitiveness for successful overseas expansion. Therefore, in this study, changes in Korean engineering firms' capabilities for the last decade were analyzed to promote entry into overseas road and water resource engineering markets. Competency factors that require urgent improvement were derived based on Importance-Performance Analysis (IPA) as a tool for quantitative measurement. As a result, the factor that shows low performance compared to the importance is an overall understanding of the target country in the road and water resource areas. Knowledge of regulatory issues on design, the ability of time management software, and knowledge of the regulatory problems on construction safety are also insufficient. This study can be used as a research methodology to identify competitiveness that Korean engineering firms have to strengthen when they advance into overseas markets in roads, water resources, and other areas.

  • PDF

ONTOLOGY BASED KNOWLEDGE RETRIEVAL IN CONSTRUCTION PROJECTS: FOCUSED ON THE CONSTRUCTION PROCESS

  • Kyung-won Lee;Moonseo Park;Hyunsoo Lee;Soonseok Kwon
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.949-955
    • /
    • 2009
  • Managing knowledge effectively is a critical factor for the competitive power of a company. There are efforts to use knowledge as an important resource in many industrial areas and likewise the interest in knowledge management is growing in the construction industry. Nevertheless, there are limitations in the current capture and reuse of knowledge in the construction industry owing to the unique characteristics of the knowledge created during the processes of projects. The knowledge produced during the processes of construction projects is project-oriented, experiential and context specific and due to these characteristics the reuse of knowledge is difficult. In this research, we focus on capturing and identifying the characteristics of construction knowledge and propose a method to apply these characteristics in developing an ontology based construction knowledge retrieval system to improve construction knowledge retrieval and enhance knowledge reuse.

  • PDF

APPLYING A STOCHASTIC LINEAR SCHEDULING METHOD TO PIPELINE CONSTRUCTION

  • Fitria H. Rachmat;Lingguang Song;Sang-Hoon Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.907-913
    • /
    • 2009
  • Pipeline construction is a highly repetitive and resource-intensive process that is exposed to various constraints and uncertainties in the working environment. Effective look-ahead scheduling based on the most recent project performance data can greatly improve project execution and control. This study enhances the traditional linear scheduling method with stochastic simulation to incorporate activity performance uncertainty in look-ahead scheduling. To facilitate the use of this stochastic method, a computer program, Stochastic Linear Scheduling Method (SLSM), was designed and implemented. Accurate look-ahead scheduling can help schedulers to better anticipate problem areas and formulate new plans to improve overall project performance.

  • PDF

A Study of Client's Role for Safety Management at Construction Sites (건설현장에서 안전재해예방을 위한 발주자의 안전관리 역할)

  • Lim, Jee-Young;Han, Kap-Kyu;Kim, Sun-Kuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.5
    • /
    • pp.75-83
    • /
    • 2008
  • Larger and more sophisticated building construction requires more input resources such as worker, materials and devices. Growing resource volume brings risks at a construction site. The industry makes an effort to protect probable incidents at the site by organizing a safety management team. conducting a safety instruction and etc, but losses especially in the construction are higher than other industries. Major reason is that the safety management program is conducted only at the step of construction work and a root cause is not eliminated. Conventionally a concerned party shifts the blame to other parties such as constructor and site workers who are direct participants in the construction site. However, the whole causes of incidents go to the all subject of the construction not only the constructor but the client, designer and others related in the construction, and especially the clients are heavily involved in general concerns of the project. Therefore, this study is defined the role of the clients in nations and domestic condition of construction safety management is investigated. And it is analyzed surveys to prevent incidents at construction sites, and suggested the role of the clients which is classified pre and post construction, and in the middle of construction, and also categorized planning and design & construction schedule especially for the pre-construction level.

A Study on the Implementation of Official Family-related Service History Archives in Korea (공적 가족사업역사 아카이브 구축을 위한 기초 연구)

  • Kim, Kyoung A;Park, Mee Sok;Kang, Bog Jeong;Lee, Young-ho;Choi, Saeeun;Chun, JeeWon;Kim, Mi Young
    • Journal of Family Resource Management and Policy Review
    • /
    • v.24 no.3
    • /
    • pp.79-102
    • /
    • 2020
  • This study aims to provide basic resources for the construction of the archives on the official family service history in Korea. The study collected records of family policies and official family service from 1948 to 2019 and thereafter attempted to classify the official family service. In addition, experts were consulted to diagnose compliance with research contents and directions, investigate priorities of the family policies, and provide opinions on the elements of each process of archiving. The results of this study were as follows. First, there were five areas of concern to be considered in the process of establishing an archive of official family services: concept, scope, collection, arrangement, preservation, and utilization. Second, the findings suggest which processes are critical to developing a sustainable and systematic archive system for the official family service history. The construction of the archives will provide a platform for understanding the contents of integrated family policies and inform the direction of future family policies in Korea. In addition, these archives will be an important factor in building a solid Korean national identity.

Development of Time-Cost Trade-Off Algorithm for JIT System of Prefabricated Girder Bridges (Nodular GIrder) (프리팹 교량 거더 (노듈러 거더)의 적시 시공을 위한 공기-비용 알고리즘 개발)

  • Kim, Dae-Young;Chung, Taewon;Kim, Rang-Gyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.12-19
    • /
    • 2023
  • In the case of the construction industry, the relationship between process and cost should be appropriately distributed so that the finished product can be delivered at the minimum fee within the construction period. At that time, it should be considered the size of the bridge, the construction method, the environment and production capacity of the factory, and the transport distance. However, due to various reasons that occur during the construction period, problems such as construction delay, construction cost increase, and quality and reliability degradation occur. Therefore, a systematic and scientific construction technique and process management technology are needed to break away from the conventional method. The prefab(Pre-Fabrication) is a representative OSC (Off-Site Construction) method manufactured in a factory and constructed onsite. This study develops a resource and process plan optimization system for the process management of the Nodular girder, a prefab bridge girder. A simulation algorithm develops to automatically test various variables in the personnel equipment mobilization plan to derive the optimal value. And, the algorithm was applied to the Paju-Pocheon Expressway Construction (Section 3) Dohwa 4 Bridge under construction, and the results compare. Based on construction work standard product calculation, actual input manpower, equipment type, and quantity were applied to the Activity Card, and the amount of work by quantity counting, resource planning, and resource requirements was reflected. In the future, we plan to improve the accuracy of the program by applying forecasting techniques including various field data.

Effects of the Safety and Health Management System on the Performance of the Enterprise: Focus on the Electric Power Corporation (안전보건경영시스템의 운영방침이 기업성과에 미치는 영향: 전기공사업을 중심으로)

  • Kim, Sang-Sig;Kong, Ha-Sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.1
    • /
    • pp.135-145
    • /
    • 2020
  • This research is mainly aimed at finding out about the effects of the safety and health management system on corporate performance through systematic operation by efficiently allocating material and human resources within the company by participating all employees and stakeholders in order to prevent and maintain industrial accidents and the optimal working environment, and how to maintain and activate the safety and health management system at the center of electric contractors.The analysis results are as follows. First, management, organizational management and resource preparation will have a positive impact on the management capability of the electric power corporation. It was assessed that the more well-transmitted and understood within the organization, the better the construction plan, the better the equipment management status, the more positively the management capability of electric works was to be achieved. Second, management, organizational management and resource preparation will have a positive impact on corporate management performance.This seems to have a positive effect on a company's business performance when the standards of OHSAS are met with construction plan and construction equipment management are high as related information such as industrial safety and health laws are strengthened and companies' safety and health activities, advanced safety and culture are released to facilitate organizational management.Third, the management ability of the electric power corporation will have a mediated effect on the effect of management, organization management and resource preparation on the performance of the enterprise. This means that the direct effect of the independent variable management organization on corporate management performance is .401 The indirect effect is .168.658 shows that the direct effect of resource preparation on corporate management performance is .423, the indirect effect is .178 and the total effect.It was analyzed at 643.

Resource Assessment and Engineering Design for Wind Energy Development (풍력에너지 개발을 위한 자원평가 및 엔지니어링 설계)

  • Kim, Seong-Kook
    • Journal of the Korean Professional Engineers Association
    • /
    • v.42 no.1
    • /
    • pp.49-53
    • /
    • 2009
  • Wind energy development and wind farm construction request multi-disciplinary study and coordination to pursuit economically and technically feasible project that may deliver a viable business model. This paper is to provide the study and coordination procedure with key management factors about the wind energy resource assessment and engineering design for EPC(Engineering, Procurement and Construction) contract for the successful business development.

  • PDF