• Title/Summary/Keyword: Construction Resource Management

Search Result 494, Processing Time 0.027 seconds

A Fundamental Study on Management Plan of Occurrence Data in Accordance with Engineering & Construction of Pipeline in Frozen Soil Region (동토지역 파이프라인 설계/시공에 따른 발생 데이터의 관리방안에 관한 기초연구)

  • Kim, Chang-Han;Won, Seo-Kyung;Lee, Jun-Bok;Han, Choong-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.20-21
    • /
    • 2014
  • Recently, activation of related construction projects due to the large traditional gas resource development of frozen soil region of Russia are expected. It is necessary to provide a plan that can be utilized and collectively managed the occurrence data in the engineering & construction stage for continued contracts of the pipe construction. Therefore, this research is aimed to provide a management plan of occurrence data for efficient management in engineering & construction stage of pipeline business in frozen soil region. The data of the engineering & construction(related pipe construction projects) can be accumulated each version and multiply managed. Furthermore, I will be expected to be the foundation of the systematic management of the classifying based on metadata and the optimizing operations using big data method.

  • PDF

A Study of Water Budget Analysis According to The Water Demand Management (수요관리에 의한 물수급변화 분석)

  • Seo, Jae-Seung;Lee, Dong-Ryul;Choi, Si-Jung;Kang, Seong-Kyu
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.33 no.11
    • /
    • pp.797-803
    • /
    • 2011
  • In this study, we developed the assessment method that evaluate the water demand management and calculate the water saving volume using water use indicator, and developed the system to link the water saving volume that occur through demand management and water supply and demand. The results from this study, local governments with poor water conditions should be followed to improve the water supply. And, future water demand estimates should be even considering it. We calculated the water saving volume of the Geum River basin using K-WEAP (Korea-Water Evaluation And Planning System) and performed the water budget analysis. We found that the change of river flow, ground water level and reservoir water level, and it can be utilized for other demand.

Analysis of Construction Cost Fluctuation Trends and Features on Apartment Housing

  • Park, Wonyoung;Kang, Tai-Kyung;Baek, Seung-Ho;Lee, Yoo-Sub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.624-635
    • /
    • 2012
  • Construction projects, including housing, are carried out over long periods of time. According to changes to the construction period, the cost of input materials and wages also changes. Therefore appropriate management is important in order to minimize cost risks caused by fluctuations in prices. In Korea, housing units are usually sold in lots prior to construction completion. Therefore, careful management of input elements such as materials and equipment that are sensitive to price fluctuations is very important. This study deals with how the price fluctuation of materials, labor, and equipment influences the change of housing cost and seeks a way for cost management through identifying key resources sensitive to price fluctuation. As a result, a change to the housing cost index multiplies depending on cost changes of materials and labor together. Labor costs are a major factor on the housing cost index. In addition, certain types of materials and labor input to housing construction greatly influence price fluctuations. Thus, it is found that managing those main cost factors is the key for effective cost management.

IMPLEMENTATION OF PRODUCT DATA MANAGEMENT SYSTEM FOR DESIGN OF BRIDGE STRUCTURES

  • Jin-Suk Kang;Seung-Ho Jung;Yoon-Bum Lee;Kwang-Myong Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1318-1323
    • /
    • 2009
  • In recent years, dramatic advances in information technology have motivated the construction industry to improve its productivity. Computer-based information technology includes Computer-Aided Design (CAD), Computer-Aided Engineering (CAE), Computer-Aided Manufacturing (CAM), Enterprise Resource Planning (ERP), Digital Mock-Up (DMU) and Product Data Management (PDM). Most construction industries are trying to apply these technologies for quality improvement, reduction of construction time and cost. PDM is very useful for managing data and process related to product design and manufacturing. PDM system has various functions such as drawing and engineering document management, product structure and structure modification management, part classification management, workflow management, and project management. In this paper, PDM system was applied to the design of steel-concrete composite girder bridge. To make a practical guidance for PDM implementation to bridge design, the procedure for its implementation was presented. Consequently, this paper could be useful to enhance the efficiency of bridge design.

  • PDF

Business Process Evaluation and Case Study for Sequential Application of BPM

  • Song, Young-Woong;Lim, Hyung-Chul;Choi, Yoon-Ki
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.2
    • /
    • pp.36-44
    • /
    • 2012
  • Adoption and practical application of BPM yet remains at a theoretic and methodological level for many industrial sectors. As for construction industry, adapting BPM into enterprise resource across all business processes could cause problems due to rapid change in corporate operation systems. Furthermore, it is unable to predict potential risks of business process while BPM are being applied. Therefore, applying BPM model to core strategy and individual task seems more effective than applying BPM model to the entire enterprise resource planning. In this paper, we define BPM and suggest a BPM model by analyzing each business unit in order to evaluate each business unit which is included in the business process architecture based on quantitative standards. This paper also presents a sequential application plan for business process model. Finally, a case study is demonstrated for the application of BPM system, focusing on cost management business, which turned out to be a top priority in the aspect of efficiency and ease based on priority analysis.

Factors Influencing Human Resource Planning (HRP) for Local Workforce Supply in Malaysian Construction Industry

  • Dom, Norhidayah Md;Kasim, Narimah;Shamsudin, Alina
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.1
    • /
    • pp.5-13
    • /
    • 2012
  • The lacks of local workforce supply become a problematic in Malaysian construction industry. Meanwhile, HRP is important during workforce supply to help organizations in order to appoint the right people in the right job. This paper reports on the use of factors influencing HRP towards local workforce supply in the construction industry in general, and Malaysian construction in particular. Semi structured interviews were conducted to 10 interviewees from the government and non-government organizations to investigate current issues of local workforce and the practices of HRP in the construction organization. The analysis methods were based on descriptions of previous tested research. The findings reveal that the lack of local workforce is due to low wages system, safety issues, educational changes, low status and unsecured work, environment in construction industry, developments and technologies changes in Malaysia. The internal factors of HRP were practiced among construction organization are organization strategy, organizational culture, organization changes, leadership and experience, nature of work and empowerment of labor. Meanwhile, the external factors are technology changes, economic changes, legislation and demographic changes. The paper provides valuable information on the practices of factors influencing HRP for local workforce supply in Malaysian construction industry.

Identifying the Relationship between Total Quality Management and Sustainable Competitive Advantage from the Construction Industry Perspective

  • Hwang, Bon-Gang;Huh, Young-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.2
    • /
    • pp.199-207
    • /
    • 2008
  • While it Is well-known that Total duality Management (TQM) can generate and sustain competitive advantage, its process and components have not been clearly identified for the construction industry. This paper aims first to enhance the understanding of TQM Content and Process. Then, drawing various seminal works on TQM and an application of market-based and resource-based theory, a consolidated model identifying the relationship among TQM principles and gaining a sustainable competitive advantage is proposed. Finally, the influence of TQM on sustainable competitive advantage of construction organizations is discussed, thereby interpreting the proposed model. Recognition of TQM's influence will be a starting point, enabling the construction industry to sustain their competitive advantage in the highly competitive global construction market.

A Study on the Perception Among University Librarians towardes Resource Sharing (자원공유에 대한 대학도서관 사서들의 인식에 관한 연구)

  • Shim, Won-Sik
    • Journal of the Korean Society for information Management
    • /
    • v.25 no.2
    • /
    • pp.5-24
    • /
    • 2008
  • As resource sharing becomes more active and complicated in academic libraries, a better understanding of how librarians-a key stakeholder-view the current level of resource sharing is needed. Using survey method, this study collected data regarding the Perception of 78 librarians with regard to interlibrary loan, document delivery, union catalog construction, shared acquisition, and community building. Overall, the respondents evaluated well-established forms of resource sharing(interlibrary loan, document delivery, and union catalog construction) more positively than less-well developed ones(shared acquisition and community building). Correlation analysis between perception of library/individual characteristics was conducted. Barriers to each of the five areas of resource sharing are also identified in the study.

BEST PRACTICES FOR JOINT VENTURES: ISSUES AND CRITICAL SUCCESS FACTORS

  • Rizwan U. Farooqui;Syed M. Ahmed;Dilshad Umer
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.369-374
    • /
    • 2009
  • Project-based joint ventures are often used in the construction industry to assemble an organization that meets a client's project needs and matches or exceeds the capacities of competitors. The joint venture / partnerships provides the means for a firm to quickly add resource, political, technical, or other required strengths that will increase project acquisition. This paper sets out to study the types of joint ventures, different issues or problems while having joint ventures and the critical factors that contribute to successful joint ventures. A questionnaire was designed and administered to survey the issues and present practices of joint ventures in the South Florida construction industry. Along with the questionnaire, personnel interviews were also conducted to get first hand knowledge about the subject matter. The results are presented in the paper. These results specifically identify the overall practice of joint ventures in South Florida as well as indicate the most significant factors leading to failure or success of these ventures.

  • PDF

THE POTENTIAL USE OF A PUBLIC WEB SERVICE TO GUIDE CONVERGING CONSTRUCTION EQUIPMENT IN US&R

  • Albert Y. Chen;Feniosky Pena-Mora
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.582-585
    • /
    • 2011
  • During disaster response, prioritization of limited resources is one of the most important bust challenging tasks. At the same time, it is imperative to timely provide the rescuers with the adequate equipment to facilitate lifesaving operations. However, supply of high demand equipment was insufficient during the initial phase of disaster response, challenging lifesaving operations in the case of the 9-11 terrorist attacks. In respond to the Haiti Earthquake, spatial information of the geographic area was not sufficient to support the search and rescue operations in the early phase of disaster response. However, with the help of civilians, information such as road names, infrastructure damage, and victim locations were updated into the spatial data repository. At the same time, resource outside of the disaster affected zone converges into the area to assist the response efforts, which is the effect of convergence that often made resource coordination challenging in large scale disasters. To efficiently collect information and utilize the converging resources, this paper proposes a flexible data repository for information update for equipment utilization in large scale disaster response scenarios.

  • PDF