• Title/Summary/Keyword: Construction Rate

Search Result 3,655, Processing Time 0.025 seconds

Adjust timing of Construction Construction Evaluation (건설공사 시공평가 시기 조정)

  • Yoon, Ji-Ho;Nam, Keong-Woo;Jang, Myung-Houn
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.78-79
    • /
    • 2019
  • A construction project with a total construction cost of over 10 billion KRW should be evaluated whether construction works are appropriately executed. The evaluation is carried out on quality management, process management, construction management, safety management, environmental management. The implementation period is within 60 days after completion of construction of the construction, from the time when the construction rate of the construction work has progressed by more than 90% to the construction cost. However, the participating construction engineers should prepare the evaluation within the period according to the evaluation criteria, but there are difficulties in preparation for the evaluation due to the reasons such as the change of engineers in charge and loss of data. Therefore, this study proposes the procedure of construction evaluation and adjusts timing of construction evaluation.

  • PDF

The influences of Union and Labor Relations on Occupational Accident Rate: In Korean Manufacturing and Construction Industry (노동조합 유무와 노사관계가 산업 재해율에 미치는 영향 : 제조업과 건설업 중심으로)

  • Cho, Hm Hak;Lee, Jaehee;Rhee, Kyung Yong
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.3
    • /
    • pp.249-255
    • /
    • 2014
  • The Purpose of this study is to compare occupational accident rate of unionized and non-unionized company and to investigate influences of labor relations on occupational accident rate in Korean manufacturing and construction Industry. Data in 2011 Occupational safety and Health Trend Survey were analyzed for this study. Results show that the occupational accident rate was lower in unionized company than non-unionized company. And amicable labor relationship reduces the occupational accident rate. The policy should be needed to support labor union and improve labor relationship to prevent industrial accidents.

A Study on the Strength Performance According to Blast Slag Replacement of Fireproof Mortar using Oyster Shell Aggregate (굴 패각을 골재로 사용한 내화 모르타르 바인더의 고로슬래그 치환율에 따른 강도성능에 관한 연구)

  • Heo, Min-Hoe;Jung, Ui-In;Kim, Bong-Joo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.75-76
    • /
    • 2017
  • In the case of B / a 1: 3, the intensity when the substitution rate increased to 15% showed a tendency to decrease, but it turned out that the strength increased at the substitution rate of 20%. In the case of B / a 1: 4 and 1: 5, it was found that when the substitution rate at the substitution rate of 10% was the highest and the substitution rate increased further, the strength was reduced. However, since the test body does not exist at the age of 3 days and the age of 7 days at the substitution rate of 0%, there is no specimen, so blast furnace slag binder substitution for increasing strength of refractory mortar is judged to be meaningless.

  • PDF

Calculation of the Attached-Piping-Material Rate for the Building Mechanical-Service System in Office Buildings (사무소 건축물의 건축기계설비 배관 부속자재 요율 산출)

  • Park, Yool
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.29 no.4
    • /
    • pp.185-194
    • /
    • 2017
  • Currently, in comparison with other architectural estimations, the estimation work regarding building mechanical-service systems is time-consuming, and the process is continuously becoming more difficult because of the increased usage of the attached piping materials such as fittings and hangings in addition to their complicated construction processes. To improve this problem, the Korean authority provides a simple estimation method for the attached-material rate regarding the main piping material, which is the most time-consuming work in the architectural-mechanical estimation. However, to be an applicable method on construction sites, a proper conversion rate of the attached-piping material is still required for the proposed method regarding building usage and working types. Therefore, the purpose of this research is the calculation of the rate of the attached-piping materials such as the fittings and supports through the building of the mechanical-service work types of mechanical rooms, air conditioning, domestic water and hot-water supplies, and the drain-, vent-, and gas-piping work in office buildings that have been designed after 2010.

Improvement of the Calculation Standard for Prolongation cost of Domestic Public Construction Project (국내 공공 공사 공기연장 간접비 산정 기준 개선방안 - 국가계약법 및 지방계약법 산정기준의 비교 고찰 -)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.95-102
    • /
    • 2016
  • Recently, a research regarding calculation of construction time extension-oriented incidental costs has been intensively suggested in quantitative aspect and recent studies on system improvement has been made continuously. In the case of Domestic Public Construction Works, State Contract Act is applied when the client is government whereas Local Government Contract Act is done when the client is local government, but more meticulous study is required because improvement plan is not proposed even there is a clear demand for improvement of these problems on calculation standard. Thus this study suggested appropriate standard by comparing each the calculation standards followed by 'State Contract Act' and 'Local Government Contract Act', considering the problems accorded, and analyzing field cases. Calculation method of other expenses was differently regulated as the revision of each regulation, and this demonstrates that there is a difference of actual cost from 12.37% to 24.95%. It is shown that less cost of construction time were calculated than actual cost according to a problem of calculation method by State Contract Act as the rate at the time of contract to be applied in other expense rate. This study suggested the rate against incidental cost and the rate of other expense per day against total construction cost as an appropriate rate calculation for other expense based on field database.

Characteristic of mixing rate of mud flat on Mortar in W/C 70% (W/C 70%인 모르타르에서의 갯벌 혼입률에 따른 특성)

  • Lee, Heung-Yeol;An, So-hyun;Yang, Seong-Hwan
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.30-31
    • /
    • 2016
  • Recently in the construction site is required various performance of mortar to deal with reliability, economy. Especially of environment-friendly, saving resources and high performance of mortar it began to require improvement of performance. Therefore, in this study, a series of tests was designed to develop a using mud flat mortar in view of the high absorption rate of tidal flats, to fix the water cement ratio to 70%. The mixing ratio were 10:0, 9:1, 8:2, 7:3, 6:4, 5:5, 4:6 of fine aggregate and mud flats. Compared the flow value, chloride content, compressive strength, tensile strength, and workability of fine aggregate the substituted mud flat mortar and basic cement mortar, present the basic data on the characteristics and effects of mud flat mortar.

  • PDF

Characteristics of Modernized Hanok for development Estimate system. (개략견적 기법 개발을 위한 신한옥 특성 분석)

  • Kim, Hyo-Sun;Jung, Young-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.124-125
    • /
    • 2013
  • The purpose of this research is to propose an approximate estimation system for Modernized Hanok. Mock-up (Jisinjae) site data has been collected and analysed to characterize the modernized Hanok and to examine the range of cost fluctuation rate with each work items. As a result, number of floor, area (㎥), shape, methods and materials were considered as key factors for price change on the total construction cost. Furthermore, wood structure (34%) and roof (17%) account for major cost percentage. The cost fluctuation rate of two factors were -3.3%~+5.6% (wood structure) and -4.1%~+4.2% (roof). For further research, existing method will be analysed in order to developing the Hanok estimation system. And the cost fluctuation rate of every work items will be continually evaluated.

  • PDF

Identification of Factors Driving Crew Production Rate : Methodology and Application

  • Huh Youngki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.93-100
    • /
    • 2004
  • For accurate construction contract time estimation, few parameters are more significant than crew production rates and factors affecting the rates. However, statistical analysis techniques for finding such factors are not always simple mainly because there are many factors and the interaction between factors is not well quantitatively understood. This paper presents methodology of identifying factors driving crew production rates. The methodology is further demonstrated with representative data collected by the author from 13 on-going highway constructions. Three factors were identified as statistically significant drivers of Cap crew production rate: 'Cap Size (m3/ea)'; 'Cap Length (m)'; and 'Cap Shape (Rectangle vs. Inverted 'T')'. It was also found that the production rates are best explained by a multiple regression model with two of the drivers; 'Cap Size' and 'Cap Shape'.

Analysis of Construction Contractors' Profit Level (건설기업의 이익률 실태 및 특징 분석에 관한 연구)

  • Kim, Han-Soo;Lee, Hyun-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.167-175
    • /
    • 2008
  • An objective of companies' existence is to make profits and grow steadily. Judging what is reasonable or excessive profit for an industry or a company by a profit figure is practically impossible because it is a matter of value judgement not just fact judgement. But recently construction companies' profit level is under severe argument. The objective of this study is to investigate the level of construction companies' profit level and compare it with other industries in order to identify facts and characteristics in relation to construction companies's profit level.

A Study on the Cause Analysis of Fall Accidents at Temporary Construction Sites (건설공사 가설구조물의 추락재해 원인분석에 관한 연구)

  • Kim, Hyang-Jeon;Paik, Shin-Won
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.1
    • /
    • pp.62-64
    • /
    • 2010
  • Since 1990 in South Korea, the considerable concern for the safety of construction sights has been increased due to serious accidents. There have been numerous big improvements in preventing the accidents by strengthening legal enforcement and by continuing to emphasize the safety management. Further, the safety standards and criteria for temporary constructional work have been enacted and established in order to maintain safe work environments in temporary construction and structure settings. However, the death rate from fall accidents is still high in the temporary constructional and structural settings in comparison to other work places in construction. According to the analysis of accidents in the field of construction between 2000 and 2007, the death rate from fall accidents in the temporary constructional settings was highest. In addition, there have been more fall accidents in the work setting by small or medium construction enterprises rather than large enterprises due to the relative lack of the safety management. Thus, in this study, the analysis of the causes of fall accidents in the temporary constructional and structural settings between 2000 and 2007 was conducted. Moreover, a survey study was carried out in order to investigate further causes based on the analysis. Finally, this study was also conducted in order to provide basic information and knowledge about the prevention of future accidents.