건설자재의 적정 리드타임 산정에 관한 연구 (A Study on Optimal Lead Time Selection Measures of the Construction Materials)

  • 이상범
    • 한국건축시공학회지
    • /
    • 제4권1호
    • /
    • pp.105-110
    • /
    • 2004
  • Resource procurement is an important management area because cost of resource covers 40% of total construction project cost and resource delivery has direct relationship with project performance. Integration of cost provides various potentials for effective and efficient project control. This study investigates the usefulness of time in resource procurement management focused on materials. These days, construction projects have characterized manufacture because of industrialization and component. Therefore, application of systematic resource planning has been requested in the construction. There are many companies conducting procurement of resource on the web by applying MRP, ERP etc. in the construction. However, in applying them in the construction yet, there is obstruction. MRP has the character doing its function under accurate cost prediction of resource. But prediction of resource is difficult in industry mechanism of the construction. If accurate cost prediction of resource is possible in the construction, it will be expected to reduce cost of procurement of resource substantially by applying successful resource planning model in the manufacture. On the basis of recent current, the purpose of study is to present procurement of resource system that period observance of construction and minimization of stock is possible by reflecting accurate lead-time to apply proactive thought to be able to cope with alteration of construction schedule efficiently in analyzing resource planning of the construction site.

공정-원가 통합관리를 위한 진도관리 개선 방안 (A Study on the Improvement of Construction Progress Management for EVMS)

  • 이규현;박찬정;최인성
    • 한국건축시공학회지
    • /
    • 제2권3호
    • /
    • pp.155-162
    • /
    • 2002
  • The Ministry of Construction-Transportation released a plan about EVMS in 1993 in order to prepare measures for an efficient public construction project, and prepared an enforcement proposal concretely in June for 2000 years, and have enforce a public project by an example with a target. Therefore, accurate analysis and evaluation about field progress are required for efficient management of a building construction, and must be established building construction management system for fast action about a problem However, unified management cannot be consisting because a work progress system is different from details estimate system within a country. and There is not still a definite standard in progress measurement for an application of EVMS. A purpose of this study is to present an improvement about a problem of progress measurement for an application of EVMS. The contents of a study, inquired into a progress measurement method and a standard to use in the field of a public construction and private construction and Checks a problem and presented an improvement item necessary for and is as follows. $\circled1$ must establishes a control account and progress measurement standard. $\circled2$ must manage progress in a activity viewpoint. $\circled3$ must use an accurate CPM process management technique.

LNG 공사의 건설사업관리 의사결정지원모델 개발 - 시공단계 중심 - (Development of a Decision Making Model for Construction Management in LNG Plant Construction - Focused on Construction Stage -)

  • 박환표;한재구;진경호
    • 한국건설관리학회논문집
    • /
    • 제15권3호
    • /
    • pp.47-57
    • /
    • 2014
  • LNG 플랜트사업은 그 특성상 해외에서 사업을 추진하기 때문에 사업관리도 일반적인 사업관리방식과는 차이점이 있다. LNG 플랜트 사업 프로세스는 가스탐사 및 생산, 물리적인 액화 및 화학적인 전환공정, 수송, 저장 등의 가치사슬로 구성되며, 주로 천연가스를 액체원료나 연료로 전환하는 장치를 중심으로 액화공정(초저온 액화) 및 FEED 패키지, 제어 운영, 건설수행 등 EPC 기술을 대상으로 하고 있다. 이러한 해외에서 수행되고 복잡한 LNG 플랜트공사의 성공은 사업관리 의사결정에 따른 사업의 성패가 달라질 수 있다. 따라서 본 연구는 LNG 플랜트공사의 시공단계 사업관리 의사결정지원 모델을 구축하기 위하여 EPC 단계별로 9개의 사업관리요소 항목을 도출하고, 각 항목별 중요도를 평가하였다. 중요도 평가결과, EPC 단계별로 사업관리와 리스크관리 항목이 공통적으로 중요한 것으로 도출되었다. 특히 본 연구는 사업관리 요소항목과 중요도 평가결과를 기반으로 LNG 플랜트공사의 시공단계의 의사결정지원모델을 개발하였다. 개발된 의사결정지원모델은 향후 시공단계의 사업관리 의사결정지원 시스템 구축의 기반이 될 것이다.

국제적(國際的) 건축(建築) 전문교육(專門敎育) 인증기준(認證基準)에서 본 한국(韓國) 건축교육(建築敎育)의 현황분석(現況分析) (A Critical Analysis on the Architectural Education in Korea from the view of International Accrediting Criteria)

  • 류전희;이선영
    • 건축역사연구
    • /
    • 제8권3호
    • /
    • pp.75-89
    • /
    • 1999
  • Under the WTO system, global standardization of professionalism in architecture practice calls for transformation of curriculum in architectural education in Korea. This paper compares the curriculum standards of international accrediting authorities such as NAAB and RIBA based on UIA accord which defines fundamental knowledge and abilities of an architect. As a result this paper extracts 51 achievement oriented criteria of architectural education in Korea. It can be categorized as communication, design, cultural context(history and theory, human behavior and social aspects), technical systems(structural systems, environmental control systems, construction material and assemblies) and practice(project process, project economics and business management, laws and regulations). Based on this recommended Korean curriculum standards, current curriculum is analyzed focusing on the 5 architectural programs in Seoul. Through this analysis, it became clear that some area - social and economic aspects in architecture, sustainability in architecture, understanding and selection of construction material, assemblies and environmental control system, recycling of existing building, professional liability, professional rules of conduct, project economics and project management - need to be covered and emphasized to meet the international standards in professional education in architecture. The result in this paper will be used as a basic data in the process of finding the direction of restructuring curriculum for professional architectural education in Korea.

  • PDF

현대(現代) 건설관리개념(建設管理槪念)을 통한 "화성성역의궤(華城城役儀軌)"의 분석(分析)에 관한 연구(硏究) (A Study on the Analysis of the HwaSungSungYouk-EuGye in the Aspect of the Modern Construction Management -Focus on ChangAhn-Mun's Construction Work-)

  • 이태열;이상해
    • 건축역사연구
    • /
    • 제10권3호
    • /
    • pp.61-76
    • /
    • 2001
  • The purpose of this study is not only to evaluate the capacity of construction management but also to understand the capacity of construction productivity by analysing various information, mainly collected from the book, HwaSungSungYouk-EuGye. The book was made by ChungCho who was one of the great kings Choson Dynasty, which has lots of information about how to build HwaSung during the last of the eighteen century. It is true that previous researches have showed lots of limitation to study the HwaSungSungYouk-EuGye though it contained a plenty of construction data. The main reason would be the absence of study methods to analyze HwaSungSungYouk-EuGye systematically. That's why there have not been overall studies about the HwaSungSungYouk-EuGye. This study starts from the definition that the HwaSungSungYouk was one of the construction projects which is the concept for construction management today. The construction project can be defined in terms of its distinctive characteristics: a project is a temporary endeavor undertaken to create a unique product. Temporary means that every project has a definite beginning and a definite end. Unique means the product is different in some distinguishing way from all similar products. A project is also undertaken several kinds of organizations. They may Involve a single person or many thousands. This study is to show some of the effective methods. Firstly, the concept of the database system today can be applied to effectively control and classify the complicated data in the HwaSungSungYouk-EuGye. Secondly, on the basis of the database system, the concept of modern construction management will be also use to figure out the construction data of the HwaSungSungYouk-EuGye.

  • PDF

플랜트 프로젝트관리를 위한 EPC전자업무절차시스템 개발 (Development Of EPC Project Management Procedure Manual System For Plant Project Management)

  • 박범진;이민재
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.487-491
    • /
    • 2006
  • 최근 고도의 산업 사회로 발전함에 있어 산업설비(플랜트) 건설부문이 새로운 성장 엔진으로 발전하고 있으며 타 산업에 부품 및 장비조달, 고용창출, 첨단기술 적용 등을 동해 파급효과가 매우 큰 고부가가치 산업으로 국가 경제성장에 원동력이 되고 있다. 플랜트 산업은 기계, 재료, 화학, 전자, 생물, 지질, 토목 등 여러 가지 요소기술이 복합적으로 적용되고, 엔지니어링, 기자재 제작기술, 컨설팅, 파이낸싱 등 지식 서비스를 필요로 하며, 기자재 및 인력수출이 가능한 차세대 성장산업임에도 프로젝트 수행단계별 업무절차의 정립이 부족하고, 그 적용 또한 체계적이지 못했던 것이 사실이다. 따라서 관련 기술력에 대한 국가차원의 선진화 전략과 체계적인 프로젝트 수행단계별 절차의 수립이 요구되고 있다. 이에 본 논문은 국내외 13개 대형건설회사의 업무절차서를 수집하였고 수집된 업무절차서의 분석을 통해 현재 산업계에서 사용하고 있는 업무절차서의 문제점을 분석하고 개선방안을 도출하였다. 개선방안은 미국 PMI(Project Management Institute)의 프로젝트관리 지식체계의 모태인 PMBOK(Porjcet Management Body Of Knowledge)의 이론을 바탕으로 합리적이고 효율적인 프로젝트관리를 위해 필요한 관리요소들을 도출하였으며, 아울러, 미국 CMAA(Construction Mangement Association of America)의 건설사업관리 업무범위에 대한 정의를 활용 EPC프로젝트의 효율적인 관리를 위해 필요한 관리요소들을 도출하고 표준화를 하여 개선된 전자업무절차시스템을 정립하였다.

  • PDF

INCORPORATING CONTEXT LEVEL VARIABLES TO IMPROVE OPERATION ANALYSIS IN STEEL FABRICATION SHOPS

  • Amin Alvanchi;SangHyun Lee;Simaan M. AbouRizk
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1053-1059
    • /
    • 2009
  • Construction system modeling can enhance work performance by following the behaviors of a system. System behaviors may originate from physical aspects of a system, namely operation level variables, or from non-physical aspects of a system known as context level variables. However, construction system modelers usually focus on only one type of system variable (i.e., operation level or context level) which can lead to less accurate results. Hybrid modeling with System Dynamics (SD) and Discrete Event Simulation (DES) is one of the approaches that has been utilized to address this issue. In this research, an SD-DES hybrid model of a steel fabrication shop is developed, and the benefits of capturing context level variables together with operation level variables in the model are discussed.

  • PDF

원자력 통합안전경영시스템을 이용한 요르단연구로사업의 문서관리 (Document Management for Jordan Research and Training Reactor Project by ANSIM)

  • 박국남;최민호;권용세
    • 산업경영시스템학회지
    • /
    • 제39권2호
    • /
    • pp.113-118
    • /
    • 2016
  • Project management is a tool for smooth operation during a full cycle from the design to normal operation including the schedule, document, and budget management, and document management is an important work for big projects such as the JRTR (Jordan Research and Training Reactor). To manage the various large documents for a research reactor, a project management system was resolved, a project procedure manual was prepared, and a document control system was established. The ANSIM (Advanced Nuclear Safety Information Management) system consists of a document management folder, document container folder, project management folder, organization management folder, and EPC (Engineering, Procurement and Construction) document folder. First, the system composition is a computerized version of the Inter-office Correspondence (IOC), the Document Distribution for Agreement (DDA), Design Documents, and Project Manager Memorandum (PM Memo) works prepared for the research reactor design. Second, it reviews, distributes, and approves design documents in the system and approves those documents to register and supply them to the research reactor user. Third, it integrates the information of the document system-using organization and its members, as well as users' rights regarding the ANSIM document system. Throughout these functions, the ANSIM system has been contributing to the vitalization of united research. Not only did the ANSIM system realize a design document input, data load, and search system and manage KAERI's long-period experience and knowledge information properties using a management strategy, but in doing so, it also contributed to research activation and will actively help in the construction of other nuclear facilities and exports abroad.

TACT 공정관리 시스템 개발 및 적용 사례 (Development and Application of TACT Management System)

  • 서상욱;김재호;김선국;김창덕;이현수
    • 한국건설관리학회논문집
    • /
    • 제4권4호
    • /
    • pp.145-154
    • /
    • 2003
  • 건설산업의 환경변화와 정보기술의 발달에 따라 건설사업 효율성 향상의 필요성이 커지고 있다. 그러나 건설사업의 효율성 제고를 위한 관리시스템의 필수요건이 되는 성과측정 도구는 여전히 부족한 실정이다. 한편, 공정관리의 경우, 공사수행 결과로 나타나는 시간, 비용, 진도 율 등의 실적위주로 관리되고 있으며, 진행단계에서의 전체 작업간의 연속적 흐름에 대한 관리는 제대로 이루어지지 못하고 있다. 따라서 본 연구에서는 건축공사의 계획단계에서부터 진행단계, 최종 평가에 이르는 프로세스의 시스템화를 시도하였고, 특히 택트 공정관리의 시스템화를 통하여 공사수행 과정 중의 마감공사 수행 정도를 측정할 수 있는 지표를 개발하고 이를 활용하는 방안을 제시하였다.

TACT 공정관리 시스템 개발 및 적용 사례 (Development and Application of TACT Management System)

  • 김재호;서상욱;김선국;김창덕;이현수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.126-134
    • /
    • 2003
  • 건설산업의 환경변화와 정보기술의 발달에 따라 건설사업 효율성 향상의 필요성이 커지고 있다. 그러나 건설사업의 효율성 제고를 위한 관리시스템의 필수요건이 되는 성과측정 도구는 여전히 부족한 실정이다. 한편, 공정관리의 경우, 공사수행 결과로 나타나는 시간, 비용, 진도율 등의 실적위주로 관리되고 있으며, 진행단계에서의 전체 작업간의 연속적 흐름에 대한 관리는 제대로 이루어지지 못하고 있다. 따라서 본 연구에서는 건축공사의 계획단계에서부터 진행단계, 최종 평가에 이르는 프로세스의 시스템화를 시도하였고, 특히 택트 공정관리의 시스템화를 통하여 공사수행 과정 중의 마감공사 수행 정도를 측정할 수 있는 지표를 개발하고 이를 활용하는 방안을 제시하였다.

  • PDF