• Title/Summary/Keyword: Construction Project Control System

Search Result 258, Processing Time 0.025 seconds

THE ROLE OF USING A TABLET COMPUTER FOR MOBILE COMMUNICATION ON CONSTRUCTION SITES

  • Ruvinde R. Kooragamage;John M. Kelsey;Simon Julier
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.531-538
    • /
    • 2013
  • The coordination and control of construction projects is vital if a project is to be a success. Almost all analysis has shown that these can only be achieved if good quality communication can be maintained on a construction site. This research focuses on the role that tablet computers could play in enhancing this communication. The following points are investigated in this paper: (a) Whether a tablet computer can enable users to monitor project progress more efficiently than traditional methods, (b) How the tablet computer fits within the project management iron triangle in construction, (c) The two different psychological impacts of information transmission for the end user using a tablet computer (i) The expectancy to transmit information frequently and rapidly from tablet computer users to project members whilst working onsite (ii) The mode of information transmission to the cognition of the transmitted information to the tablet computer. Through the use of structured interviews and questionnaires, the opinions of individuals within various disciplines in construction were canvassed. The approach adopted in this paper deals with understanding both the soft and hard issues for deploying such a system. This research enabled the authors to develop a base framework incorporating the key factors which are relevant for implementing a tablet computer based on information flows primarily.

  • PDF

THE RELIABILITY PREDICTION OF CONTROL CABINET OF CONTROL ROD CONTROL SYSTEM (제어봉 제어 시스템의 제어함에 대한 RBD 분석)

  • Jung, Hae-Won;Sur, Jung-Suk;Yook, Sim-Kyun;Nam, Jung-Han
    • Proceedings of the KIEE Conference
    • /
    • 2003.07d
    • /
    • pp.2055-2057
    • /
    • 2003
  • This paper describes the results of RBD(Reliability Block Diagram) analysis of control rod control system, which is being developed as part of KNICS project. The results of RBD indicate unavailability of control cabinet for control rod control system. A purpose of RBB is to evaluate unavailability of control cabinet, identify the design drawbacks of control cabinet, and propose design improvement to a designer to help design the more reliable control rod control system. This RBD defines the logical interaction of failure within a system.

  • PDF

Development of a Project Schedule Simulation System by a Synchronization Methodology of Active nD Object and Real Image of Construction Site

  • Kim, Hyeon Seung;Shin, Jong Myeong;Park, Sang Mi;Kang, Leen Seok
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.344-348
    • /
    • 2015
  • The image data of the web camera is used to identify the construction status of the site in a remote office and it can be used for safety management. This study develops a construction schedule simulation system based on the active nD object linked with real image data of web camera from the construction site. The progress control method by 4D object uses a method that the progress of each activity is represented with different colors by progress status. Since this method is still based on a virtual reality object, it is less realistic description for practical engineers. Therefore, in order to take advantage of BIM more realistic, the real image of actual construction status and 4D object of planned schedule in a data date should be compared in a screen simultaneously. Those methodologies and developed system are verified in a case project where a web camera is installed for the verification of the system.

  • PDF

Improvement of Construction Process Control to Reduce Construction Risk (건설공사 공정관리이행의 리스크 감소를 위한 개선방안)

  • Park Hong-Tae;Son Chang Baek;Kang Leen Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.35-44
    • /
    • 2000
  • The major objective of construction process control(CPC) is to provide construction managers with operational information that will help reduce project duration and save project cost. However, the CPC in Korea is being applied to construction projects with some basic problems such as the inconvenience of CPC S/Ws and the process control unconcerned with construction information classification system and computer system to integrate cost and schedule. This study analyzes the present condition of CPC including the basic problems, and then suggests the reform measures in technical and operational viewpoints to reduce construction risk. The focus of study is on the technical improvement for the application of construction information management system applicable to both cost estimating and schedule management.

  • PDF

Development of Optical Signal Transmission for the KSTAR Project Pertaining to Instrumentation and Control of the Neutral Beam Test Stand at KAERI

  • Jung, Ki-Sok;Oh, Byung-Hoon
    • KIEE International Transaction on Electrical Machinery and Energy Conversion Systems
    • /
    • v.5B no.3
    • /
    • pp.289-295
    • /
    • 2005
  • Instrumentation and Control (I&C) of the Neutral Beam Test Stand (NB- TS) Facility at the Korea Atomic Energy Research Institute (KAERI) for the Korea Superconducting Tokamak Advanced Research (KSTAR) project has been underway since the start of the project to answer the diverse requests arising from the various facets of the development and construction phases of the project. Optical signal transmission constitutes a significant portion of I&C works and has been performed for the entirety of the project. During the NB- TS construction and related experiments, significant achievements to a more accurate as well as more refined optical signal transmissions have been made. Examples of those I&C works that utilized the optical signal transmission are the Langmuir probe signal transmission, gradient grid current signal transmission, gas flow control and signal transmission, ion source temperature measurement, beam line component temperature monitoring, and coolant flow signal transmission, etc. These optical signal transition provisions are now performing part of the indispensable functions for the proper operation of the NB- TS facility. Attained experience and expertise are expected to be well applied to the upcoming main neutral beam injection (NBI) system construction for the KSTAR project.

USING PROCESS MAPPING IN CONSTRUCTION PROCESS TO REDUCE CHANGE ORDERS

  • Sang-Hoon Lee;Carolina Fuzetti;Lingguang Song;Kyungrai Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.616-621
    • /
    • 2009
  • Change orders represent one of the largest sources of cost growth on construction projects, but an efficient change management control system can help the projects steer clear of the constant construction changes. This study was performed to achieve a better understanding of all changes and to develop a new set of Best Practices using process mapping techniques. The project data for this research were collected from case studies of aviation projects implemented in Houston, Texas at Bush Intercontinental Airport. The findings and contributions of this research should help owners and project managers determine and identify major causes that impact project budget and schedule and implement solutions prior to them surfacing.

  • PDF

Fundamental Study of 4D CAD Application by Using Augmented Reality for Civil Engineering Project (증강현실(Augmented Reality)의 토목시설물 4D체계 활용을 위한 기초적 연구)

  • Kang, Leen-Seok;Moon, Hyoun-Seok;Kim, Hyun-Soo;Choi, Hyung-Lae;Kim, Chang-Hak
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.658-661
    • /
    • 2008
  • This study aims to suggest a methodology for developing the AR-4D CAD system which can improve construction progress control process by using augmented reality(AR) technology for civil engineering project. This study reviews practical application of AR process in 4D CAB system and suggests the detailed requirements, information flow system and integrated interface function for developing AR-4D CAD system. Through these methods, this research classifies main functions of AR-4D CAD system that can visualize construction progress control data, and suggests an operation scenarios of the system.

  • PDF

Applied cases of advanced construction & engineering technology at Tower Palace III Project (타워팰리스 III 현장의 첨단 시공 및 엔지니어링 기술 적용사례)

  • Wang In-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.202-213
    • /
    • 2003
  • Tower Palace III project is the highest residential and commercial high-rise complex building in Korea. In order to construct a high-rise building, advanced construction and engineering technology is required. Therefore, with more developed construction and engineering technology based upon accumulated knowledge, construction speed of 13.4 days per floor including finish work was achieved in this project. To achieve this project successfully, three main advanced construction technology were applied: 1) Construction methods for 3-day cycle of structural work and curtain wall, 2) Tact scheduling method for finish work, 3) Management system of material, labor, work, and information. Also, four main engineering technology were applied: 1) New material such as high -flowing concrete and high strength concrete of 800 kgf/cm2, 2) New method such as a pipe-cooling system of a cool water circulating type, 3) Mechanical system such as smart-fan controlling kitchen-ventilation system, 4) Electrical system such as false car system.

  • PDF

Contingency Estimation Method based on Stochastic Earned Value Management System (추계적 EVMS 기반 예비비 산정 방법론)

  • Gwak, Han-Seong;Choi, Byung-Youn;Yi, Chang-Yong;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.72-73
    • /
    • 2018
  • The accuracy of contingency estimation plays an important role for dealing with the uncertainty of the financial success of construction project. Its' estimation may be used for various purposes such as schedule control, emergency resolve, and quality expense, etc. This paper presents a contingency estimation method which is schedule control specific. The method 1) implements stochastic EVMS, 2) detects a specific timing for schedule compression, 3) identifies an optimal strategy for shortening planned schedule, 4) finds a probability density function (PDF) of project cost overrun, and 5) estimates the optimal contingency cost based on the level of confidence. The method facilitates expeditious decisions involved in project budgeting. The validity of the method is confirmed by performing test case.

  • PDF

THE RELIABILITY PREDICTION OF PCB CARDS OF POWER CABINET OF CONTROL ROD CONTROL SYSTEM (제어봉 제어 시스템의 전력함 PCB 카드에 대한 신뢰성 예측)

  • Won, Jung-Hae;Suk, Sur-Jung;Kyun, Yook-Sim;Han, Nam-Jung
    • Proceedings of the KIEE Conference
    • /
    • 2003.07d
    • /
    • pp.2028-2030
    • /
    • 2003
  • This paper describes the results of reliability prediction analysis of control rod control system, which is being developed as part of KNICS project. The results of reliability prediction indicate MTBF(Mean Time Between Failure) of cards for control rod control system. A purpose of reliability prediction is to evaluate MTBF of cards, identify the design drawbacks of cards, and propose design improvement to a designer to help design the more reliable control rod control system. This reliability prediction analysis used the the part count and part stress method in the basis of MIL-HDBK-217F.

  • PDF