Basic Study on the Assembly Process Design of Curtain-wall System for Minimization of Carbon Emission

  • Yi, June-Seong
    • 한국건축시공학회지
    • /
    • 제12권6호
    • /
    • pp.648-663
    • /
    • 2012
  • With recent attempts to improve quality and productivity, the prefabrication manufacturing system has been occupying an increasing share of the construction area. To minimize site work, material is more frequently being produced and partially assembled at a plant, and then installed at a site. For this reason, the production process is being divided and the materials are being delivered to the site after passing through multiple plants. With these changes in the production process, the materials delivery plan is becoming an important management point. In particular, as road transportation using trucks has a 71 percent share of the domestic transportation market, selecting the proper transportation path is important when delivering materials and equipment to a site. But the management system at the project design phase to calculate the delivery cost by considering the production process of the pre-fab material and the $CO_2$ emission at the material delivery phase is currently lacking. This study suggests a process design model for assembly production of the pre-fab material and transportation logistics based on carbon emission. The suggested model can be helpful to optimize the location of the intermediate plant. It is expected to be utilized as a basic model at the project plan and design phase when subcontractors make decisions on items such as materials procurement, selecting the production method, and choosing the location of the assembly plant.

OSC기반 PC구조 공사비 산정을 위한 품셈개발 및 공사비 분석 - RC공법과 비교 - (A Study on Development of Construction Standard Production Rates and Cost Analysis for Off-Site Construction (OSC)-Based PC Structure Construction Costs - Comparison with RC Method -)

  • 이한수;이치호;한희수;이정욱
    • 한국건설관리학회논문집
    • /
    • 제25권2호
    • /
    • pp.56-68
    • /
    • 2024
  • 최근 공동주택에서의 OSC (Off-Site Construction)기반 PC구조의 객관적인 원가기준 마련을 위해 공장제작-현장설치 단계의 공사비 산정을 위한 품셈 체계를 제안하였다(Lee et al., 2021). 또한, 건설공사 표준품셈에서도 보편적인 PC공사의 현장설치 단계에 적용할 수 있는 주요 부재의 표준품셈을 제시하는 등 PC공사의 공사비를 체계적으로 산출할 수 있는 제도적 기반이 마련되는 추세이다. 본 연구에서는 공동주택 PC구조의 현장조사 결과를 분석하고 전문가 의견을 수렴하여 공동주택 PC공법에 적용할 수 있는 공장제작-현장설치 품셈을 개발하였으며, 현행 표준품셈 기준과 비교하여 공동주택의 현장 및 부재특성에 적용할 수 있도록 표준품셈의 보완 방향을 제시하였다. 또한, 개발 품셈을 활용하여 공사비를 산출하고 동일규모의 공동주택 RC공법과 공사비를 비교함으로써 PC공법의 비용발생 특성 및 원가절감 방안을 도출하였다. 본 연구에서 도출한 PC공법의 표준품셈은 PC공법 공사비 산출결과의 객관성과 일관성을 확보함으로서 PC공법 적용 확산에 기여할 수 있을것으로 기대된다.

종합·전문건설사업자의 상호시장진출 의향 및 참여방식 분석을 통한 종합·전문간 업역철폐에 따른 건설시장 변화 예측 (Forecasting the Changes in Construction Market by Analyzing General·Specialty Contractors' Perception on Business Area Abolition)

  • 김성일;장철기
    • 한국건설관리학회논문집
    • /
    • 제24권2호
    • /
    • pp.88-97
    • /
    • 2023
  • 본 연구는 건설생산체계 개편에 따른 종합·전문건설사업자 간 상호참여 가능한 시장규모를 분석하고, 설문조사를 통하여 실제 시장 참여자의 시장진출 의향 및 방식을 분석하여, 향후 건설시장의 변화를 분석하고 예측하였다. 먼저, 종합·전문건설사업자의 업무 내용 연관성, 등록기준 유사성, 종합·전문 상호참여 가능한 시장을 분석을 통하여 종합공사업종과 전문공사업종 간 연계성 비율을 살펴보았다. 선행연구들의 통계자료에 의존한 추정의 한계를 극복하기 위해, 실제 시장 참여자의 시장진출 행태를 분석하고, 이를 토대로 건설 생산체계 개편이 건설시장에 미치는 영향을 보다 구체적으로 분석하기 위하여, 종합·전문건설사업자를 대상으로 상호시장 참여 의향, 참여방식 등에 관하여 설문조사를 실시하였다. 설문조사 결과, 종합건설사업자의 52%가 전문시장에 참여 의향이 있는 것으로 나타났으며, 전문건설사업자의 55.1%가 종합시장에 참여 의향이 있는 것으로 나타났다. 토공사, 철근콘크리트공사, 시설물유지관리, 상하수도설비공사, 실내건축공사업 시장에 참여 의향이 높은 것으로 분석되었으며, 공사 규모로는 5억~30억 미만 규모의 사업에 대한 경쟁이 예상된다. 본 연구를 통해 건설산업 생산체계 개편으로 인해 건설업체가 당면하게 되는 주요 환경변화를 이해하고, 이러한 변화에 효과적으로 대응할 수 있을 것으로 판단된다.

Development of production planning system for shipbuilding using component-based development framework

  • Cho, Sungwon;Lee, Jong Moo;Woo, Jong Hun
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제13권1호
    • /
    • pp.405-430
    • /
    • 2021
  • Production planning is a key part of production management of manufacturing enterprises. Since computerization began, modern production planning has been developed starting with Material Requirement Planning (MRP), and today Enterprise Resource Planning (ERP), Advanced Planning and Scheduling (APS), Supply Chain Management (SCM) has been spreading and advanced. However, in the shipbuilding field, rather than applying these general-purpose production planning methodologies, in most cases, each shipyard has developed its own production planning system. This is because the applications of general-purpose production planning methods are limited due to the order-taking industry such as shipbuilding with highly complicated construction process consisting of millions of parts per ship. This study introduces the design and development of the production planning system reflecting the production environment of heavy shipyards in Korea. Since Korean shipyards such as Hyundai, Daewoo and Samsung build more than 10 ships per year (50-70 ships in the case of large shipyards), a planning system for the mixed production with complex construction processes is required. This study draws requirements using PI/BPR (process innovation and business process reengineering) methodology to develop a production planning system for shipyards that simultaneously build several ships. Then, CBD software development methodology was applied for the design and implementation of planning system with drawn requirements. It is expected that the systematic development procedure as well as the requirements and functional elements for the development of the shipyard production planning system introduced in this study will be able to present important guidelines in the related research field of shipbuilding management.

제약이론을 적용하여 설계된 선각건조공정 모니터링 시스템 개발 (Development of Monitoring System for Hull Construction Processes Using TOC Analysis)

  • 윤훈희;신동목
    • 대한조선학회논문집
    • /
    • 제45권3호
    • /
    • pp.315-321
    • /
    • 2008
  • A large ship usually consists of 300 to 500 blocks, for which it is extremely difficult to monitor the whole manufacturing processes from assembly to erection. In an effort to unify all the data and procedures, shipbuilding companies are installing ERP systems, which have brought great improvement throughout the company as a whole. In some departments, however, the ERP systems are not being fully utilized. This paper analyzes and solves the problems revealed especially at the production departments after an ERP system is installed. In this research, firstly a TOC(Theory of Constraints) analysis is done to find out the best solution for those problems. Secondly, based on the solution found, a Monitoring System for hull construction processes is developed with an improved user interface. The visualization of data is designed to reflect the needs of the production departments. The new system supplements the ERP system in that it selectively utilizes the unified data base and is operated under ERP environment. The system is installed in the production departments and its usefulness is verified.

모듈러 공장생산 프로세스 개선을 위한 컨베이어시스템 적용 방안 - 공장생산 중심으로 - (To Improve Production Process of the Modular Using the Conveyor System)

  • 배병윤;김경래;차희성;신동우
    • 한국건설관리학회논문집
    • /
    • 제13권5호
    • /
    • pp.103-112
    • /
    • 2012
  • 최근 우리나라가 선진국대열에 들어서고 생활수준이 높아지면서 건설 산업에서는 높은 인건비와 노무자의 부족으로 인해 외국인 노동자의 비중이 점차 늘어나고 있는 실정이다. 모듈러 공법은 전체공정의 50%~90%를 공장에서 제작하여 이것을 운반한 후 현장에서 설치하는 공법으로 현장에서 공정을 최소화하여 공기를 단축하고 품질을 향상시킬 수 있으며, 현장 공기의 단축으로 인건비 절감에 효과적이다. 현재 국내 모듈러는 2003년 신기초등학교를 시작으로 군 병영시설에 확대 적용되고 있지만 모듈러 공법의 장점인 짧은 공사기간과 낮은 비용의 제작은 이루어지지 않는 실정이다. Toyota 자동차 생산방식인 컨베이어시스템 방식을 모듈제작공정에 도입함으로써 자동화생산과 시간, 인력의 소모량을 크게 단축할 수 있고 이에 따라 생산 비용과 품질, 공기 향상으로 시장의 활성화를 기대할 수 있다. 따라서 본 연구는 실제 국내 모듈러 공법 프로젝트를 통하여 공장생산방식의 문제점 해결을 위해 컨베이어시스템 적용방법을 제시하고 적용한 컨베이어시스템의 수익성 분석을 하고자 한다. 제작 모듈의 형태에 따라 다르지만 본 연구의 실험모듈을 기준으로 일일 생산량 7.36개를 기준으로 투자 회수 기간까지 20개월이 소요 된다.

건설분야 생산체계 개편에 대비한 조경분야 전문공사업 업무 개선 방향 - 설문조사 결과를 중심으로 - (A study on How to Improve the Work of Professional Landscape Construction in Preparation for the Reorganization of the Production System in the Construction Sector - Based on the Survey Results -)

  • 안명준
    • 한국조경학회지
    • /
    • 제52권3호
    • /
    • pp.33-45
    • /
    • 2024
  • 정부는 생산체계 개편을 주제로 건설업역 간 기존 체제를 변경하는 건설분야 생산구조 개편을 추진 중이다. 그러나 이는 날로 높아가는 조경분야의 전문성과 기술성에 역행하는 것이라는 지적이 높다. 이에 건설업 업종 통합 정책에 대응하고 적절한 조경분야 업무체계와 내용을 개선하는 것이 시급하다. 이에 본 연구는 적절한 조경분야 생산체계와 생산구조 개편의 방향을 모색할 수 있도록 실무 업계의 의사를 조사하여 참조자료로 활용할 수 있도록 하는데 목적을 두고 연구하였다. 설문을 진행한 결과, 1) 개편 정책의 인식은 업계 의사를 반영한 단계적 추진을 높게 요청하고 있었고, 2) 종합과 전문으로 나뉜 체계는 통합에 반대하는 의견이 높게 나타났으며, 3) 조경공사업 개선 방향으로는 적절한 설계안과 공사비가 가장 높게 지적되었으며, 4) 세부공종 개선 방향으로는 부대 토목공사와의 관계 재정립이 중요하게 지적되었다. 전반적으로 현행 조경 전문공사는 변화하는 조경업무를 충분히 반영하지 못하고 있고, 타 공종의 부대공사 형식에 그치고 있다는 지적이 높았다. 따라서 이를 반영한 정책 추진이 필요하다. 장기적으로는 조경공간을 독립 대상물로 하는 조경공사의 위상 정립이 시급하며, 이를 위한 법제의 보완과 그에 따른 업종 변화가 필요하다.

현장관리 업무체계의 실태조사 연구 - 준공 후 업무를 중심으로 - (A Field Study on the Preference in the Construction Management - Focused after construction Stage -)

  • 이두진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2003년도 학술.기술논문 발표회
    • /
    • pp.85-89
    • /
    • 2003
  • With the social demands for tall building, the level of techniques for construction become high and there are various building materials. Also, the construction system become very complicated with the increase of worker. In spite of above facts, the method of construction management depends on the experimental capacity of a construction manager, and there are many unreasonable elements. These elements prevent well-going in construction process. To solve this problem, it is necessary to make a new system of construction management which is adequate for the condition of company and the contents of construction. In this study, the characteristic of production system and the present condition of construction management were investigated with the help of survey. Thus, the new method of construction management which can clear the previous problems was proposed.

  • PDF

현장관리 업무체계의 실태조사 연구 - 준공 후 업무를 중심으로 - (A Field Study on the Preference in the Construction Management - Focused after construction Stage -)

  • 이두진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2003년도 학술.기술논문발표회
    • /
    • pp.85-89
    • /
    • 2003
  • With the social demands for tall building, the level of techniques for construction become high and there are various building materials. Also, the construction system become very complicated with the increase of worker. In spite of above facts, the method of construction management depends on the experimental capacity of a construction manager, and there are many unreasonable elements. These elements prevent well-going in construction process. To solve this problem, it is necessary to make a new system of construction management which is adequate for the condition of company and the contents of construction. In this study, the characteristic of production system and the present condition of construction management were investigated with the help of survey. Thus, the new method of construction management which can clear the previous problems was proposed.

  • PDF

TECHNICAL PROPOSAL BASED COST REDUCTION BIDDING SYSTEM FOR SUPPLYING AFFODABLE HOUSING

  • Seunghee Kang;Jeongseok Lee;Gunhee Cho;Jeongrak Sohn;Jongdae Bang
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1433-1439
    • /
    • 2009
  • Best value is the ultimate goal of the owner and can thus have diverse meanings according to the project characteristic, owner's purpose, user groups' payment capability, etc.. Recently, resettlement problems of the marginalized members in the urban regeneration area have been issued in Korea because they have no capability to purchase (or lease) redeveloped housing (or apartment). It means that a minimized production cost for reducing supply price of housing is a key factor in establishing the best value of the marginalized members. The lowest-price bidding system serves the purpose of ensuring a minimized production cost, but due to the low-cost investments, it creates various problems, such as sloppy construction, lowered quality, an increased LCC, and worsening profitability for builders. Thus, to help them resettle, it is necessary to supply affordable housing geared towards a certain appropriate quality and minimum construction costs. Towards this end, this study aimed to propose a cost reduction bidding system based on a technical proposal. The proposed technical-proposal-based cost reduction bidding system consists of the following components: work-unit-based, project-unit-based, and construction-period-reducing technical proposals. These components are evaluated to select the best bidder for a given project. The technical proposal based cost reduction bidding system proposed herein is expected to provide facilities with appropriate supply prices and appropriate quality levels, to bolster the technological competitiveness of builders.

  • PDF