A Study on the Plan Establishing Process Data System for the Process Plan of Construction Works (건설공사의 공정계획을 위한 공정정보 시스템 구축에 관한 연구)

  • 안효수;권춘안
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2001.11a
    • /
    • pp.142-147
    • /
    • 2001
  • Recently, as the field of construction industrial is enlarged and the blanket control system is formed, the process plan considered from initial process formation to construction cost must be systematic and rational. So we have to propose and compose the new process formation system that divides the intention decisive property of construction data, its relationship and the data property according to process definitely and can express and control easily the public ownership of construction data and network process under the peculation control. So this study decides the field formation and construction data of the work according to the ordering and contract way to establish the process data system for the process plan, shows that the lot theory is necessary to form the economical construction field and proposes that the integrated formation system of construction data that is made by code system must be established.

  • PDF

A Study on Prototype of Just In Time Production Management System (적시생산 관리시스템에 관한 연구 - 철근공사를 중심으로 -)

  • Lee, Kyoo-Hyun;Choi, In-Sung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.4 s.18
    • /
    • pp.153-164
    • /
    • 2005
  • This study aims at establishing JIT production management system to enable manage the resources input into from procurement through construction based on correct identification of the process, an analysis on the amount of input materials and information sharing. This study has focused on the process control and working process of rebar work in domestic apartment house construction where the overall scope of Process from the planning phase to the construction phase has been analyzed in this study. Also construction phase was selected for the application of a sample case. A basic model for JIT production was generated with these processes. Furthermore A questionnaire and the on-site survey with process, checklist and control data were prepared and performed for the application of JIT production management model into rebar work. The governing scopes of JIT production management system include process management, material management, yard loading and moving management and inventory control, and the operation of each control item

Development of Construction Process Safety Information Management System for Safety Accident Prevention (안전사고 예방을 위한 건설업 공정 안전 정보 관리 시스템 개발)

  • Jun Hyun Jong;Yang Kwang Mo;Kang Kyung Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.7 no.1
    • /
    • pp.11-23
    • /
    • 2005
  • It is difficult to put it into practice in that it requires bearing too much burden to draw out the planning itself in a case of large construction work. Consequently in this paper we select evaluation criteria by construction progress, classify into several categories, and regard potential danger which often occurs, as a evaluation criterion. Further step is to allow workers or collaborated companies to express their expert opinions or experiences and to encourage quality and process control and autonomous safety control by applying PSM(Process Safety Management) method using AHP(Analytic Hierarchy Process) and to development of PSIM(Process Safety Information Management) evaluation method in the construction. The reason why PSIM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries, thereby strengthening their competitive edges.

MANAGEMENT THINKING BEHIND PERFORMANCE MEASURES

  • Yong-Woo Kim ;Glenn Ballard
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.377-382
    • /
    • 2005
  • The tools, methods and measures used for project control reflect underlying theories of management. Management theory has been neglected in the construction industry, which has rather focused on tools and neglected theory. This paper contributes to the theory of project management by introducing and developing two fundamental and competing conceptualizations of management: MBM (Managing-by-Means) and MBR (Managing-by-results). Current project control and performance measurement practice is based on MBR. However, project control based on MBR may not be appropriate for managing dynamic projects. The paper present the Last PlannerTM System (LPS) and Process Variance Control (PVC) as examples of methods reflecting the MBM view. It is argued first that the MBM view is appropriate for managing uncertain, complex and quick projects. The paper also explores how MBR tools and techniques may be appropriately used within an MBM framework.

  • PDF

Development of Construction Process Safety Information System Using Analytic Hierarchy Process (AHP를 활용한 건설공정 안전평가 정보시스템 개발)

  • Kim Min-Jun;Jo Jung-Hyun;Jun Hyun-Jeong;Lee Byung Gee
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2005.05a
    • /
    • pp.39-44
    • /
    • 2005
  • Process control and autonomous safety control by applying PSM(Process Safety Management) method using AHP(Analytic Hierarchy Process) and to development of PSIM(Process Safety Information Management) evaluation method in the construction. The reason why PSIM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries, thereby strengthening their competitive edges.

  • PDF

The Program of progress control and quality control for the high-rise compound building (초고층 주상복합건물의 수장공사 공정관리 및 품질관리 방안)

  • Jung, Eul-Kyu;Lim, Chil-Soon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.4
    • /
    • pp.111-117
    • /
    • 2003
  • Recently SAMWOO EMC received order and built interior walls which was used the day process in several high-rise compound buildings. On the way to build, this process was brought about several matter according to the progress and qualify control. So, this study is the improving way of the dry process from experiences on those constructions

Improvement of Construction Process Control to Reduce Construction Risk (건설공사 공정관리이행의 리스크 감소를 위한 개선방안)

  • Park Hong-Tae;Son Chang Baek;Kang Leen Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.35-44
    • /
    • 2000
  • The major objective of construction process control(CPC) is to provide construction managers with operational information that will help reduce project duration and save project cost. However, the CPC in Korea is being applied to construction projects with some basic problems such as the inconvenience of CPC S/Ws and the process control unconcerned with construction information classification system and computer system to integrate cost and schedule. This study analyzes the present condition of CPC including the basic problems, and then suggests the reform measures in technical and operational viewpoints to reduce construction risk. The focus of study is on the technical improvement for the application of construction information management system applicable to both cost estimating and schedule management.

  • PDF

A Study on the Application to PSM (Process Safety Management) Policy in the Construction (건설현장의 PSM(Process Safety Management) 제도 적용에 관한 연구)

  • 양광모;전현정
    • Journal of the Korea Safety Management & Science
    • /
    • v.5 no.4
    • /
    • pp.21-30
    • /
    • 2003
  • In this paper, we select evaluation criteria by construction progress, classify into several categories, and regard potential danger which often occurs, as a evaluation criterion. Further step is to allow workers or collaborated companies to express their expert opinions or experiences and to encourage quality and process control and autonomous safety control by applying PSM method. The reason why PSM method should be quantitative and substantial progress is because it contributes Korean constructing companies to enhancing their safety control ability and to taking an equal stance just like developed countries,' thereby strengthening there competitive edges. Boost of safety control system by PSM method will make an enormous contribution to preventing construction accidents on the site by establishing and securing an autonomous safety control system.

A Study of the impacts of control types on Tie strength and Project Performance - focus on field project organization of construction industry

  • Lee, Won-Hee;Cho, Ho-Haeng
    • Journal of the Korea Society of Computer and Information
    • /
    • v.26 no.7
    • /
    • pp.103-108
    • /
    • 2021
  • In this paper, we an empirical study of the effects of control types on Tie strength and filed project performance of project participants in field project organization for Korean domestic construction industry. In the study, we try to tell what significant impact output control, process control and tie strength among field project participants have on field project performance and features unique to field project organization for Korean construction industry through empirical analysis. And the findings of the empirical analysis are that output control appeared to have significant impacts on tie strength among the participants and process control, and process control also appear to have significant impact on field project performance.

A Survey for a Development Construction Materials' Construction Site Quality Control Guide (건설자재 현장품질관리 지침 개발을 위한 실태조사)

  • Ko, Eun-Joo;Ko, Eun-Jung;Seok, Ho-Joong;Lee, Seung-Hyeok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.1-5
    • /
    • 2008
  • The purpose of this study is to ensure an amicable material quality control in the construction site through investigating a process which can impact the construction material quality. For it, a worker interview and questionnaire survey was conducted through a direct field visit. The visited construction sites are composed of 79% construction site and 21% engineering site. As the respondents of questionnaire survey, the quality control workers were 72% of total respondents. Next, the construction worker, handymen, field representatives and others formed 7%. The interview with the quality control staff was conducted with the items including the construction site quality control guide, incoming inspection and material management. Through this survey, the problems of quality control by progress phase were derived. It could be known that the management and measures by each phase were urgently required. It also was indicated that a selection of low-priced material caused by low price bidding could badly impact the construction and safety. Also, in relation to the opinions such as the insufficient quality control and heavy work-load, the improvements are required. For the effective quality control in the construction site, the material quality control procedures suitable for the phase of construction progress must be presented in the present quality control. Also, the standards for it need to be established.