• 제목/요약/키워드: Construction Process

검색결과 7,193건 처리시간 0.028초

PC 공사 프로젝트 관리 시스템 프로세스 개선을 위한 기초연구 (A Basic Study on the Improvement of PC Project Management System Process)

  • 김창훈;안용한
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.95-96
    • /
    • 2023
  • The purpose of this study is to derive the limitations of the existing management system by analyzing the characteristics of the PC process to improve the PC construction project management system process. To overcome the limitations derived, we present a process of managing integrated information from the design-production-construction stage using QR codes and clouds. This is expected to help develop a PC construction project management system.

  • PDF

건설분야 BPR 수행을 위한 프로세스 모형화 기법 연구 (A Study of Process Modeling Method for Construction Business Process Reengineering)

  • 곽중민;박서영;강인석
    • 한국건설관리학회논문집
    • /
    • 제11권3호
    • /
    • pp.80-88
    • /
    • 2010
  • 국내외 건설분야에서는 건설CALS 구축 등의 건설정보화를 위해 다양한 노력을 기울여 오고 있다. 이러한 건설정보화는 전산시스템 구축 자체에 많은 비중을 두고 있는 반면, 건설업무의 업무프로세스 재설계 등의 분야는 다소 미흡한 실정이다. 이를 위해서는 건설업무 절차구성을 위한 체계화된 프로세스 개념을 도입한 전산화 방법론 및 특화된 프로세스 모형화기법이 요구되고 있다. 본 연구에서는 이러한 BPR의 건설분야 적용성 확보 및 정보화기술과의 연계성을 고려하여 체계적인 건설업무 프로세스의 구축을 위한 건설업무 BPR 방법론과 업무프로세스 모형화기법을 제시한다. 또한 제시된 모형화기법은 웹기반의 프로세스 모형화시스템으로 개발하여 실제 프로젝트의 적용을 통해 활용성을 검증한다.

A Construction Supply Chain Management Process with RFID/WSN-based Logistics Equipment

  • Shin, Tae-Hong;Yoon, Su-Won;Chin, Sangyoon
    • Journal of Construction Engineering and Project Management
    • /
    • 제2권4호
    • /
    • pp.11-19
    • /
    • 2012
  • Construction supply chain management (CSCM) has become one of the critical factors that determine the success of a construction project as it becomes increasingly complicated and mega-sized. Particularly for high-rise or mega-sized building construction, just-in-time supply chain management is required due to lack of storage space and effective logistics for construction components and materials at a construction site. Despite the fact that research and development of radio frequency identification (RFID) and wireless sensor network (WSN) technology have been performed, construction project managers still need to carry mobile devices and check material and component flow at each stage of the supply chain process. This research proposes that the equipment used in the construction supply chain process, such as movers, trailers, gates, and hoists, can become main actors in the supply chain process using RFID and WSN technologies. And the proposed equipment and process focused on a solution to the redundancy identification problem, which has been observed in operations that use RFID/WSN-based processes for construction logistics. This paper also presents issues identified through verification and validation of the research results and proposes further studies.

공동주택 공사의 작업간 간섭 감소 방안에 관한 연구 (A Study on the Measures for Work Interference Reduction in Apartment Construction)

  • 안성훈;김준호;강경인
    • 한국건축시공학회지
    • /
    • 제6권1호
    • /
    • pp.117-122
    • /
    • 2006
  • Apartments construction is a one of largest parts in buildings construction. In apartments construction, work interferences are frequently occurred in work processing because workspaces are very various and numerous. However, though work process is important for mainly influencing to the schedule, quality and cost of apartments construction, these work interferences are considered a kind of uncertainty, which is difficult to anticipate at construction planning stage, in work processing. Therefore, this study proposed the measures for work interference reduction in apartment buildings construction and the actual planning for practices. The results can be summarized as follows: (1) the standard of work process is checked regularly. (2) The scope of work and work process is adjusted. (3) The standard of drawings process and cost about work interferences work profess is established.

FEASIBILITY OF A RFID-BASED MONITORING SYSTEM FOR THE CONCRETE POUR PROCESS

  • S. W. Moon;S. M. Hong
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.433-439
    • /
    • 2007
  • A ubiquitous environment in construction requires integrating hardware and software systems. Currently the Construction System Integration Lab (CSIL) at Pusan National University is currently studying the application of ubiquitous technology for better communication in the construction process. In this paper, a pilot of Ubiquitous Concrete Pour System (u-CPS) has been presented to demonstrate the effectiveness of data exchange in the concrete pour process. The u-CPS environment takes advantage of the RFID technology for collecting construction data. The pilot can automatically generate the data for concrete pour work such as departure time, arrival time, concrete pour time. Construction managers can keep track of the progress of concrete pour work using the information. A case study was done for a building construction using the pilot system, the result of which demonstrated that the RFID-base system can help improve the effectiveness of data communication during the concrete pour process.

  • PDF

PROCESS RESEARCH FOR DEVELOPMENT OF STRUCTURAL COST ESTIMATING MODEL BASED QUANTITY - FOCUSED ON PUBLIC OFFICE BUILDING PROJECT -

  • Soo-Min Kim;Jung-Kyu Seo;Sung-Uk Kim;Chang-Hyun Shin;Yung-Jin Kim;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1170-1175
    • /
    • 2009
  • When managers estimate exact construction cost at early stage and design phase, they can reduce construction cost in a more efficient way than to predict at construction stage. But, the current of public construction cost estimation and management is concentrated almost after detailed design phase. Therefore, construction cost management in design development phase to generally use approximate estimating is not correct. Also, the existing construction cost used the method that estimated by gross floor area-based cost estimates at design development phase. So, it is difficult to show the specific amount of materials and basis about the estimated cost of the construction. This study derived problems and limits of construction management at design development phase in case of public office building project through review of literature and current survey, and suggested estimating process model process of structural construction cost go improve these matters.

  • PDF

BLE 기술 기반 비콘을 활용한 모듈러 건축 현장 프로세스 제안 (Application of BLE-based Beacon in Modular Construction Process)

  • 김창재;강남우;권우빈;김하림;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.36-37
    • /
    • 2021
  • OSC(Off-Site Construction) is regarded as a faster and more economical method in the construction industry, and the attention towards the OSC is growing. In the modular construction process, which is one type of OSC, accurate identification of a module is essential. Because the installation position and the MEP(Mechanical, Electrical, and Plumbing) composition are distinct between modules, a defect in the finishing or junction area is likely to happen during the construction process. This study suggested the modular construction process by applying a beacon receiver using BLE(Bluetooth Low Energy) technology on each module. Construction quality management would be improved using the location and assembly data, particularly for a different module in modular construction.

  • PDF

신한옥형 공공건축물 실증구축사업의 작업진도 분석 및 공정개선 방안 - 신한옥형 공공건축물 실증구축 현장 3개를 중심으로 - (Improvement method of process management on new han-ok style public building project)

  • 서정승;김영훈;곽동엽
    • KIEAE Journal
    • /
    • 제17권3호
    • /
    • pp.133-140
    • /
    • 2017
  • Purpose: The construction of New Han-ok style public buildings is a construction that can not be seen in traditional Han-ok, and it is a construction that combines traditional wooden structure, RC structure, and steel structure. Therefore, construction different from general construction is complicated and complex. It is necessary to accurately understand the construction method of each field rather than the general construction management method and study the method suitable for New Han-ok style public buildings. Also, since the New Han-ok style public building business is the first business to be introduced in Korea, new process management is needed rather than general process management. Method: The research method is as follows. Analyze process management through theoretical considerations and analyze the differences from general construction projects. Next, we want to identify the characteristics and problems of the process control method applied to real cases. Finally, the results of this analysis suggest ways to improve process management. Result: Therefore, it is necessary to establish a precise plan from the basic design to the construction of the public building construction management. In addition, careful planning should be made so that the supply and demand of materials and the supply and demand of personnel can be achieved smoothly.

인필식 모듈러 공법을 적용한 주택건설공사의 작업분류체계 구축 및 표준 프로세스 제안 (Standard Process and Work Breakdown Structure for Housing Construction Projects using Infill Modular System)

  • 손정락;이동건;방종대;김진원
    • 토지주택연구
    • /
    • 제10권3호
    • /
    • pp.77-87
    • /
    • 2019
  • In Korea, the modular construction method was applied to the construction of facilities such as military barracks and school dormitories, beginning with the pilot project of Seoul New Elementary School in 2003. In 2017, public modular houses were supplied to Busan(Yongho-dong) and Seoul(Gayang-dong), and modular housing is expected to continue to be supplied in the future. However, there is no clear construction standard for the modular housing construction yet, and there are few cases where the infill modular system is applied. Therefore, this study established the work breakdown structure and proposed a standard process focusing on the infill modular system applied to the construction of Dujeong-dong modular house in Cheonan. Level 1 of the work breakdown structure by construction stage of Infill modular was defined as modular manufacturing, assembly, and finishing process. Level 2 was defined as preparation, modular production, modular infill, modular fixing, floor plastering, building finishing, and other site finishing. Level 3 is defined as 57 detailed unit work of infill modular construction. The standard process of infill modular is proposed for the assembly stage that is commonly applicable to infill modular housing construction. The results of this study can be used for the process plan, transportation plan, lifting plan of modular housing construction.

온톨로지 구축 프로세스와 시스템 (Ontology Construction Process and System)

  • 이인근;서석태;정해천;황도삼;권순학
    • 한국지능시스템학회논문지
    • /
    • 제16권6호
    • /
    • pp.721-729
    • /
    • 2006
  • 컴퓨터를 활용한 지식과 정보 처리를 위해 온톨로지를 구축하고 활용하기 위한 연구가 이루어지고 있다. 그러나 현재까지의 온톨로지 개발 방법 및 온톨로지 구축 도구는 온톨로지 개발 목적에 따라 제한적인 부분에서 연구되어 사용되고 있다. 그러므로 개발하려는 온톨로지 특성에 따른 적절한 온톨로지 구축 프로세스와 도구가 필요하다. 본 논문에서는 특정 분야의 비전문가가 언어 자원으로부터 지식을 개념화하고, 개념을 형식화하여 온톨로지를 구축할 수 있는 온톨로지 구축 프로세스(OntoProcess)를 제안한다. 그리고 다수의 온톨로지 구축자가 동시에 온톨로지 구축 작업을 행할 경우 i)지식의 개념화 과정에서 동일한 개념을 중복 정의하거나 ii)개념의 형식화 과정에서 형식언어와 포구사용법의 이해 부족으로 인해 온톨로지 구축 능률이 저하되는 문제가 발생할 수 있다. 이런 문제를 해결하기 위해 메타 온톨로지를 이용한 다중 온톨로지 구축 프로세스(OntoProcess)를 제안한다. 제안한 프로세스에 기반한 온톨로지 구축 시스템 (OntoProcess)을 개발하고, 실제 온톨로지 구축 실험을 통하여 제안한 프로세스와 시스템의 효율성을 확인한다. 그리고 온톨로지 구축 과정에서 발견된 문제점 및 이에 대한 해결 방안을 제시한다.