The 2th International Conference on Construction Engineering and Project Management
/
pp.61-68
/
2007
There has been a lot of research on and release of commercial systems that enable evaluation and visualization of construction methods. These have enabled the selection of good construction plans. However, the process in which engineers build 3D geometry, formulate a schedule and eventually synchronize them is still a time-consuming process. Changing any aspect of the geometry or the schedule and re-linking them is also time-consuming. Therefore, the engineers may compromise on getting the best solution. This paper describes a technique to automate the generation of multiple sets of schedules, quantity takeoffs and 4D visualization from a single 3D model.
This study aims to estimate the relative importance of quality management items through the defect analysis in the landscape construction process. The RIQMI are decided by the defect coefficient and it's cause weight. The defect items in the landscape construction process were classified by 56 items based on the classification form of '96 landscape architectural construction standard and the cause pattern were categorized 4 types as design, material, construction, and environment factors. To analyze the defect coefficient and the aucse weight by defect, the researcher surveyed the questionnaires on the 103 engineers and the 31 experts on the landscape architectural construction. The result of this study are as follows. The relative importance by facilities pattern turn out to be much higher construction, material fator than design. environment factor in wood facilities, paving facilities, and steel facilities, the RIQMI is very high in timber crack, timber vending, faulty of timber against decay, welding faulty of steel facilities in material factor, and timber crack, faulty of timber against decay, finish faulty of steel facilities, welding faulty of steel facilities in construction factor.
자재 및 재고관리에 관한 부분은 전 산업 분야에서 기업의 이익을 위해 고려되는 주요 요소 중 하나이지만 국내 건설 프로젝트에서는 조달 관리의 중요성이 상대적으로 평가절하 되어왔고 기존의 재고관리에 관한 연구는 개별 요소로 한정되어 많이 연구되었으며 제조업의 이론을 도입하는 단계에 머물렀다. 따라서 건설 프로젝트의 자재 및 재고관리를 전체적인 프로세스 관점에서 바라보고 개선하며 기존 이론의 도입에 더하여 건설 프로젝트 특성 반영이 필요하다. 본 연구에서는 계획 단계의 현장 관점에서 야적장의 면적과 재고량을 이용하여 경제적주문량을 결정하는 자재관리 프로세스를 제안하고 이를 건설 현장의 기존 프로세스와 비교하여 그 유용성을 검증하였다.
The 5th International Conference on Construction Engineering and Project Management
/
pp.352-358
/
2013
As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner
최근 건설기업은 글로벌 기업경쟁 환경과 수주경쟁 속에서 업무 효율성 증대를 위한 프로세스 경영체제에 대한 노력이 요구된다. 건설기업은 1990년 이후 프로세스 중심의 내 외부 업무구조를 개선하기 위하여 다양한 프로세스 경영기법이 도입되었으나, 그 효과는 일부 개선된 기능획득에 머물고 있다. 또한, 업무 프로세스의 효율성 향상을 위해 다양한 업무지윈 시스템들이 개발되었으나, 기능위주의 개별적 구축과 입 출력 정보 및 데이터 흐름에 초점을 둠으로써 업무프로세스 관리와 정보기술의 지원이 분리되는 업무-IT 분리현상(Business-IT divide)이 발생되었다. 본 연구는 업무-IT 분리현상의 개선 방법론으로서 BPM(Business Process Management)을 구현함으로서, 업무 프로세스를 기반으로 한 업무지원 시스템의 연계모델을 제안한다. 이를 통해 건설기업의 지속적인 프로세스 관리를 지원하며, 프로세스 수행시 요구되는 업무조건(참여주체, 업무정보, 업무지원 시스템의 기능)들을 연계함으로서 업무효율성 향상이 기대된다. 이를 위해 업무-IT분리현상으로 인해 건설기업의 업무 수행상 발생되는 문제점을 분석하여 연계모델의 개념과 아키텍처를 구성하였다. 연계모델의 구현을 위해 공정관리 업무의 전체 종 단간 업무프로세스를 분석하여 BPA(Business Process Architecture)를 작성하였으며, 각 업무 프로세스의 업무조건들을 상세분석하여, 건설기업의 주요 13개 업무지원 시스템의 주요기능과 연계하였다. 연계된 내용을 바탕으로 PDCA분석과 CRUD분석을 통해 업무 프로세스 기반 업무지윈 시스템 연계모델을 개발하였다.
건설현장에서의 공정관리 기법은 매우 큰 비중을 차지한다. 그러나 이러한 공정관리 및 그 성과를 나타내어줄 수 있는 지표나 평가 내용은 아주 미미한 수준에 있다고 할 수 있다. 특히, 수도권이 아닌 지방공사나 중소업체의 경우에는 현실적 어려움이 큰 것이 사실이다. 따라서 실무자들의 현장 상황에 맞는 유연한 공정관리 및 성과측정 시스템이 필요하게 되었다. 본 연구에서는 지방 중소업체들을 대상으로 문제점을 파악하여 웹 기반을 통해 체계적으로 구축한 린 개념의 공정 및 성과관리 시스템에 대해 중소건설업체가 쉽게 접근하고 사용할 수 있도록 운영방안을 제시하였다. 이는 지방 중소업체의 경쟁력을 확보하고 공기단축과 공사비 절감 등의 가시적인 성과를 도모할 뿐만 아니라 공사과정의 성과측정과 준공이후 관련 자료로써의 활용도 기대할 수 있다.
This study is aimed to research the management methodology for the process of GIS database construction. In general, used methodologies are made for the purpose of application program development. And the methodologies reflected GIS characteristics are also applied for GIS software development. But the software methodologies are never introduced to construction of GIS database. In this study, various common methodologies are investigated and analyzed, and the methodology which include the characteristic of GIS database construction process as work steps and detail paths is developed and suggested.
Construction industry recognizes the necessity to manage is business from viewpoint of processes, and consider developing, evaluating and improving standard processes as important managerial target. SW-CMM provides basic framework for this process management. However, appropriate tailoring and adjustment are essential for SW-CMM concept to be applied to construction business. SW-CMM makes construction manager understand the capability of business process, based on which the priority of process improvement is judged. The capability is prescribed by common features. This paper introduces the basic frame for diagnosing construction business processes with SW-CMM, and presents the case study of analysing processes focusing on communication management.
The 9th International Conference on Construction Engineering and Project Management
/
pp.370-374
/
2022
Construction is a labor-intensive industry that heavily relies on skilled construction workers. However, the aging of the workforce is rapidly growing, and the shortage of skilled workers is intensifying. The application of construction robotics technology can solve the problem of workforce shortage and guarantee construction productivity, safety, and quality improvement. This study presents a framework of the functional analysis for construction processes and work tasks that classifies and analyzes processes and work tasks for construction robotics design. The framework presents the functional analysis process, which analyzes workers' attributes and identifies functions of construction robotics.
본 연구는 중소(지방)건설업체의 효율적인 공정관리와 국내 건설 산업의 성과관리를 위한 시스템 구축을 목적으로 한다. 린 건설의 공정관리 프로세스를 탑재한 시스템은 Web 2.0 플랫폼을 기반으로 프로젝트에 참여한 수많은 원도급업체와 협력업체의 클러스터를 생성하여 상호 유기적인 공정관리를 가능하게 할 것이다. 또한 프로젝트 진행 중 발생되는 수많은 데이터를 수집/축적하여 프로젝트가 진행 중이거나 종료 된 후 이를 분석하여 프로젝트의 성과관리에 대한 비교가 가능 할 것이다. 이러한 성과관리 사례들은 차후 실행되는 유사한 프로젝트의 공정계획에도 도움이 될 것이다. 본 연구의 기대효과는 Web을 통한 공정관리로 인해 국내 중소(지방)건설업체가 느끼는 복잡한 공정관리 및 시스템 구축에 따른 부담감을 조금이나마 덜어 줄 것이며, 데이터베이스에 축적되는 방대한 양의 신뢰도 높은 데이터로 보다 정확한 성과관리를 할 것으로 기대된다. 그리고 더 나아가 공정관리뿐만 아니라 설계, 감리, CM 등 폭 넓은 데이터베이스 구축을 통해 건설산업의 경쟁력 향상에도 기여 할 것이다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.