Development of CPAM(Construction Process Analysis Model) based on Lean Construction Principles (린 건설 원리에 기초한 건설 생산 공정 분석 모델에 관한 연구)

  • Kim Chan Hun;Kim Chang Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.48-61
    • /
    • 2001
  • This study aims at improving work reliability. It proposes a way to overcome the limitations of current scheduling methods by providing a new framework, CPAM(Construction Process Analysis Model) based on the lean principles. It suggests methods which improve work reliability and production effectiveness with variability control methods. Also it suggests methods which reduce inventories of materials and equipment and WIP(Work In Process) using two techniques; Lookahead Schedule and Weekly Work Plan. The contribution of this research also includes that it assumes planning as a process of reducing uncertainty and maximizing throughput, counter-posing plan reliability to resource redundancy as alternative strategies for managing in conditions of uncertain work flow.

  • PDF

A Model of the Risk Response Repeat Process in the Construction Project (건설공사 위험대응 반복 프로세스 모델)

  • Kim Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.1 s.9
    • /
    • pp.107-114
    • /
    • 2002
  • Recently, a few major construction companies in Korea have a growing interests to the risk management system, and they are trying to apply it to their construction projects. However, the existing methodologies to be applied to the foreign public projects are not proper to the construction environments due to its adaptabilities, that has one time process and heavily depends on personal judgement. The purpose of this paper is to propose a risk response process in consideration of the residual risks, which would be more adaptable and practical in the construction environment, overcoming the current obstacles to be mentioned above. This process has systematic repeat process until the residual risks go down to the risk thresholds based on the efficiency of specific response strategy.

Assessment of CO2 Emissions of Eco-friendly Lightweight Form in the Construction Process (시공단계에서의 친환경 경량 거푸집 탄소배출량 평가)

  • Kang, Sin Hun;Ahn, Hee-Jae;Lee, Chang-Su;Lee, Dongmin;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.10-11
    • /
    • 2019
  • The purpose of this study is to validate the environmental performance of the 'eco-friendly lightweight form' in the construction process. Unlike existing euro form and aluminum form, the proposed form does not require form oil during the process of concrete casting and is lightweight because it is made of engineering plastic. Therefore, eco-friendly lightweight form will reduce the $CO_2$ emissions in the construction process. To verify the hypothesis, the study compared existing forms and eco-friendly light weight form's $CO_2$ emissions in each stage in construction process when using 1,000 forms and 100 times from the LCI(Life Cycle Inventory) data. The total $CO_2$ emissions of the eco-friendly light weight form were 30,487kg $CO_2$, which equated to about 58% and 20% less emissions than the euroform and aluminum form. The result of the study verified that the eco-friendly lightweight form was effectively reduced $CO_2$ emission in the construction process.

  • PDF

A Case Study on Value Improvement through applying VE Method in Stage of Railway Construction (시공 VE기법을 적용한 철도구조물의 가치향상 사례 연구)

  • Cho, Ki-Yon;Park, Mi-Yun;Kim, Sung-Hun;Seo, Jong-Won
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.23-29
    • /
    • 2008
  • Most VE operation related to construction project is progressed in stage of planing or design phase, especially in case of domestic. It is encouraging fact and if you have VE process in stage of planning and design, you'll have experience a reduction of about 70% of total saving cost in which total construction process may occurred. However, recently the work of construction in overseas increase and almost is only construction-work, except planning and design process. As this reason, VE process for construction-work phase only is demanded in high necessity. VE in construction phase comes to accomplish intensively in the part which the design change does not follow, through know-how, equipment operating method and method of temporary-structure erection at the established construction-site learned, builders will be the possibility of reduction from 3% to 10% in constructive expense. This paper describes VE performing example in OO company's construction-work phase, and propose the methodology of VE performance in the phase of construction. And also it is aimed to extending VE applications into the overseas construction enterprise.

  • PDF

Construction Process Modelling Method Improving the Traceability of ICT Applications (ICT 적용 추적성 개선을 위한 시공관리 프로세스 모델링)

  • Go, Taeyong;Lim, Taekyung;Lee, Dong-Eun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.1
    • /
    • pp.114-123
    • /
    • 2019
  • Tracking ICT applications on construction business processes is critical to the success of ICT-applied construction projects. Existing IDEF0 is a representative modeling method for visualizing and analyzing business processes. It defines a construction production process into a visual information model, hence, encouraging the project participant to understand the activities, their deliverable, and control flow of the process. However, IDEF0 dose not lend itself to ICT-applied construction processes, because it does not provide a mean to define how, in what order, by which each and every activity that ICT applied implements. This paper presents a new business modeling method that improves the traceability of ICT application (IAMB: ICT Application tracking Model for Business process) for construction management. The IAMB contributes to handle the sophisticated features of construction management processes to which ICT are applied. The method categorizes the process into three types: management, construction, and information exchange. The validity of IAMB was confirmed by analyzing the performance when it is used for tracking each modeling step of lift reservation process which making use of ICT. The test case provides an admissible evidence that the method encourage to define who, what, how, which order, and by which ICT tools the construction process exchanges production information.

Database Development For Efficient Construction Process Management Using Construction Simulation Technique and Bayesian Approach (건설 시뮬레이션과 베이시안 기법을 이용한 공정관리 데이터베이스 구축)

  • Ko, Yong-Ho;Park, Min-Ha;Han, SeungWoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.94-95
    • /
    • 2014
  • Construction industry has become higher, larger and more complicated. It has been analyzed that the process planning in the construction site has been made by the site engineer experience mostly and some were made based on historical data. However, such plans have been investigated that require numerous revisions during construction which means that the plans made through such methods are not reliable. Numerous studies in this field have been conducted trying to solve such problems developing methodologies to overcome such limitations. It has been analyzed that many studies have focused on suggesting prediction models only that cannot be used for both actual planning prior to construction and process monitoring during construction. Therefore, this study suggests a methodology that effectively manages construction productivity by applying simulation methodology combined with bayesian approach focusing on the high-rise curtain wall operations.

  • PDF

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF

Rebar Fabrication Process in Both Field Processing and Factory Processing for Adopting Lean Construction

  • Yun, Seok-Heon;Kim, Sang-Chul
    • Architectural research
    • /
    • v.15 no.3
    • /
    • pp.167-174
    • /
    • 2013
  • Due to increasing competition of construction companies, it is required to optimize the management of construction projects and "lean" concepts are rapidly spreaded in construction industry. Steel work accounts for a large proportion in construction work, and a variety of attempts to efficiently perform steel work has currently made. And since rebar (Engineer-to-Order) can be engineered through design once order is placed, it gives the great impact on construction, thus, entire management is required. The purpose of this study is to present the method to increase the efficiency of field processing method of steel work in terms of lean construction. Once we examine process of steel work and identify the flow, we would like to analyze which processes should be improved through value analysis approach and present the improvement plans. Also, this study examines cases of field processing and factory processing, and it identifies the waste factors in the procurement process. Finally, this study would like to present the result of analysis from the perspectives of value. The rebar delivery process is divided into several steps and the duration of every step is surveyed. Using duration data, VAT (Value added time) can be calculated for analyzing the efficiency of the process.

A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Lee, Sung-Woo;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.2
    • /
    • pp.127-137
    • /
    • 2019
  • In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.

Construction 3D printing SoP Design and Verification Using Material Extrusion Additive Manufacturing Technology (압출식 적층제조 기술을 적용한 건축 3D 프린팅 운영절차의 설계 및 검증)

  • Park, Jinsu;Kim, kyung taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.106-112
    • /
    • 2022
  • Additive manufacturing (AM, also known as 3D printing) technology gets attention for various effects in the construction industry. It reveals abilities of process automation, high traceability of resource management, construction period precision improvement, and worker safety. However, unlike the existing construction technology, the development of AM construction process causes trial errors and unpredictable accidents. In the present study, the construction AM process is designed for on-site construction, and it performs with empirical tests. Also, we analyzed the causes of qualitative experimental results.