Development of Process Management Manual for Quality Improvement of Green Building (그린빌딩의 품질향상을 위한 공정관리매뉴얼 개발)

  • Kim, Dae-Geon;Hwang, Hyun-Jun;Ryu, Kyoung-Gu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.245-246
    • /
    • 2013
  • The construction of green building has distinct charicteristics by work classification by applying green technologies. Thus if the new technologies are applied to construction, unskiiled worker can experience construction time delay, reconstruction occurrence and quality decrease because of mistakes during the construction and work progress. For this background, we establish the work progress manual to secure quality and performance during the construction phase of green building and provide method to be used in the construction sight operation.

  • PDF

Analysis of the Relationship between Construction Industry and Cooperation Business (건설 산업을 중심으로 한 협력 산업과의 관계 분석)

  • Moon, Sung-Kon;Lee, Joo-Sung;Yoo, Seung-Kyu;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.149-153
    • /
    • 2009
  • Today, the form of competition among companies quickly changes in new paradigm. In the past company activity was performed independently, but now dependently. With global age, that change is essential, the introduction of a system that integrates a series of courses is needed for the success of members. Nevertheless, those change are very slow in construction industry, that causes a lot of loss in project process. Construction industry produce structures with collaboration of other industries. There are difficulties that only one company make it, alone. In this trend, cooperation is essential. but the process of original brings a lot of loss From this perspective, this study will prove dependencies of construction industry. Draw out each factor from industrial cooperation, those analyze correlation with system dynamics. In conclusion, this study performs a basic research about 'Integrated Management System' of construction project.

  • PDF

A Study on Proto-type Development of BIM based Stochastic Duration Estimation Module (BIM기반 추계학적 공기 예측 모듈 프로토 타입 개발에 관한 연구)

  • Park, Jae-Hyun;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.159-162
    • /
    • 2009
  • Today's construction is more various and more complex. Because of that, a lot of uncertain factors are occurred and they related uncertain construction duration. For management complex architecture project, importance of construction schedule management also increased. In previous studies, one of solutions to overcome those problems is suggested. It was BIM based construction simulation process which focused on construction schedule and construction schedule management. But latest process had limited point which has no duration estimation function. So this paper suggested duration estimation method and developed duration estimation module. Duration estimation module developed with current scheduling tool MS Project and their macro function. However, this module has just developed Reinforced Concrete Structure and has to do more development and research.

  • PDF

A Study on Fire Problems and Preventive Measures in Construction Sites (건축현장의 화재 문제점 분석 및 대응방안에 관한 연구)

  • Oh, Young-taek;Kang, Kyung-sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.4
    • /
    • pp.11-24
    • /
    • 2017
  • This study attempted to establish fire risk factors and preventive measures for each of five major types of construction, focusing on construction sites. For this purpose, disaster cases were analyzed and countermeasures were prepared. In addition, fire risk factors and flammable and combustible materials by construction type according to construction process were identified and preventive measures thereof were suggested. The results of this study can be used to establish policy improvement directions that meet various educational needs and expectations by identifying the use status of flammable and combustible materials and figuring out the fire risk factors according to the process by work type in construction sites.

Development of Prediction Model of Subcontract's Bidding-Ratio for Private Apartment Projects (민간 공동주택 하도급 낙찰률 예측모델 개발)

  • Jang, Ki-Suk;Koo, Kyo-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.250-251
    • /
    • 2021
  • A subcontract work order is the basis of the construction process and consists of the root and trunk of the construction industry. The construction process through a subcontract work order is an important element of project success, and it is the basic unit of creating profit in the construction industry. Therefore, correct analysis and forecasting of subcontract work orders allow correct estimation of construction cost and profit which is the foundation of corporate decision making. This study has started to provide predictions of subcontractor's bidding-ratio for decision-making. Since the actual project data has been used in this study, the contribution level of the model is highly expected in actual field. The statistical confidential level of adjusted decision coefficient is concluded low because of limited sample numbers. However, its accuracy and confidence level can be increased through increasing sample numbers, considering more variables, and studying of reducing error.

  • PDF

A Study of Object Recognition for the Efficient Management of Construction Equipment

  • Hyeok-Jun Ryu;Suk-Won Lee;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.587-591
    • /
    • 2013
  • Measuring the process of construction operations for productivity improvement remains a difficult task for most construction companies due to the manual effort required in most activity measurement methods. There are many ways to measuring the process. But past measurement methods was inefficient. Because they needed a lot of manpower and time. So, this article focus on the vision-based object recognition and tracking methods for automated construction. These methods have the advantage of efficient that human intervention was reduced. Therefore, this article is analyzed the performance of vision-based methods in the construction sites and is expected to contribute to selection of vision-based methods.

  • PDF

A Case Study on the VE/LCC for selection on Improvement of Soft Soil Ground (연약지반처리공법 선정을 위한 VE/LCC 사례 분석)

  • Kim, Yong-Deuk;Lee, Young-Dae;Acharya, Nirmal Kumar
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.271-273
    • /
    • 2006
  • Because effect of value elevation is great as it is fast that construction VE is enforcement, VE at the design phase is more and more important more than construction process phase. But, is exerting negative impact for construction process phase by various problem that happen at design phase, and is causing discord to between project partners. Therefore, quality security in design phase is important first of all. Hereupon, this study emphasized that need VE at the design phase of extension plan forward more and more because achieved process that derive conceptional estimation by quantitative value calculating value index (V) through provision of design function point (F) and LCC expense (C) by comparison method of construction and chooses optimum method of construction through VE/LCC analysis example in improvement of soft soil ground method choice process of design phase.

  • PDF

Correlationship with Selecting Business Process and Strategy for BPM of Construction Company (건설기업의 BPM도입 대상 업무선정과 기업전략의 상관성)

  • Cho, Hang-Min;Song, Young-Woong;Lim, Hyung-Chul;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.28-39
    • /
    • 2009
  • Recently, it has been an issue on BPM(Business Process Management, below BPM), which is a sort of business management methods that secures agility and flexibility through sustainable improving and monitoring in a rapid-changing environment. To introduce BPM to construction company we need to set up a procedure for objective, define criteria according to the business structure defined by BPA(Business Process Architecture, below BPA) and analyze works and then select targets. Those BPM target works need to have a close relationship with corporate strategy and to support realizing corporate value. Therefore, this paper will study BPM Target works of construction companies for an effective introduction BPM through questioning from working-level staff. In addition, it will analyze their types and corporate core strategy and BPM target works, then study the main strategy according to BPM target types. And also, this study is expected to help construction companies to choose the business for BPM adoption through analyzing current situation and strategy for business selection when adopting BPM.

The Process of Identifying the Responsibility Party of Caused Delay Claim by Ambiguity of the Conditions of the Contract (계약 조항의 애매모호성에 의해서 발생되는 공기지연 클레임의 책임 당사자 확인 프로세스)

  • Lee, Chijoo;Kwan, Taewook;Koh, Hoonsuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.6
    • /
    • pp.527-535
    • /
    • 2020
  • This study analyzed main causes of claims in EPC/Turnkey projects. For this purpose, this study referred to the FIDIC silver book, which lists the international standard contract conditions for EPC/Turnkey projects. The most frequent cause of claim was delay. A process was then proposed to determine whether the owner or contractor was the responsible party when the delay claim occurred. The proposed process was for damages for delay which is the conditions of contract for indemnities against delay claim. The process was based on conditions of the contract of two previous EPC/Turnkey projects that were constructed in 2010, the FIDIC silver book, as well as the obligations of owner and contactors. The proposed process is applicable depending on the conditions of the contract and the owner's meaning. Furthermore, by identifying the responsible party, this study will contribute in identifying the possible claim types before concluding a contract and writing the specific contract.

A Study to Analyze the Assembly Process of Precast Concrete Wall Panels in Beam-Column Frame Apartment Buildings (보-기둥구조 PC공동주택 PC벽체의 조립공정 분석 연구)

  • Kim, Ki-Ho;Lee, Bum-Sik;Kim, Min-Jun;Lee, Dong-Gun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.4
    • /
    • pp.495-506
    • /
    • 2024
  • Unlike reinforced concrete(RC) construction, the primary determinant of construction schedule for precast concrete(PC) apartment buildings is the lifting equipment. To establish a dry process-centric construction schedule, this study analyzes the lifting unit process for core, internal, and external PC wall components, which differ from traditional PC components. By examining the assembly process of these wall types, the study aims to determine the construction cycle for a standard floor frame of a PC apartment building. The findings will serve as foundational data for developing construction schedules for PC apartment buildings utilizing PC walls.