• 제목/요약/키워드: Construction Phase

검색결과 1,713건 처리시간 0.024초

건축물 시공단계에서의 온실가스 배출 관리 방안 -국내외 친환경 인증제도와 일본 현장의 대응 방안을 중심으로- (Greenhouse Gas Management Policy during Construction Execution Phase -Focused on Green Building Rating Systems and Japanese Case-)

  • 송상훈
    • KIEAE Journal
    • /
    • 제10권5호
    • /
    • pp.139-150
    • /
    • 2010
  • Until now, the eco-friendly construction (green construction) has been focused on reducing environmental impacts in use(operation and maintenance) phase. Considering the environmental influence along the life cycle of construction project, the impact in execution phase is rather lower than that in use phase. However, that impact is thought to be greatly decreased by well-organized activities. Based on its urgency and requirement for timely action, this study aimed to discuss the greenhouse gas (GHG) reduction plan in execution phase from a broad perspective. To achieve this purpose, the green building rating systems in domestic and foreign countries have been reviewed, and the practice in Japan was investigated. In order to improve current on-site greenhouse gas management, the integration among construction phases, participants, and environmental factors, and institutional supports are required as well as the contractor's efforts.

DTC(Design to Cost)기반의 설계단계 사업비관리 프로세스 개발 (Development of Cost Management Process during Design Phase based on Design to Cost)

  • 박소현;문현석;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.209-212
    • /
    • 2009
  • The Development of Cost Management is embossed efficiently to use the budget for the construction industry. The government is exploring every efforts and polices to control increasing the budget for the construction industry. However, despite of the government's efforts, researches are insufficient for a cost management of development. Also, the changed cost of construction by frequent plan change is caused of decline in quality etc during an accomplishing project. Therefore, in this study, analyzed about principal official phase of design phase to solve the problem. In order to define clearly the target cost concepts in the planning phase apply to the DTC(Design To Cost) concept and technique at the development of cost management process which will be able to manage the enterprise expense. It's process is expected with the fact that will be the possibility efficiently of fixing target cost in the planning phase by the construction client and designer.

  • PDF

설계업무 프로세스 개선을 통한 설계관리의 발전 방향 (Design management's development direction through design process improvement)

  • 김한;김선규;이낙운
    • 산업기술연구
    • /
    • 제27권B호
    • /
    • pp.169-176
    • /
    • 2007
  • Recently, construction industry has been magnified while various cooperative relationship makes steady process. So importance of management during construction is gathering strength. Therefore, we need systematic management gradually. But almost management of construction industry that performs these day is focused on construction phase not design phase. The purpose of the present study is to find the effective way of design management with enhancing the process of design phase.

  • PDF

THE CHECKLIST FOR ENVIRONMENTAL-FRIENDLY CONSTRUCTION PROJECT MANAGEMENT IN CONSTRUCTION PHASE

  • Oh, Kyung-Taek;Jung, In-Su;Lee, Chan-Sik
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1522-1527
    • /
    • 2009
  • Construction project is necessary element for human life to upgrade the quality and convenience. However, due to its contradictory nature to the environment conservation, environmental pollution and damage, deterioration of natural scenery, noise/vibration, water quality pollution, etc. caused in the process of construction greatly affect the environment. The purpose of this study is to propose checklist for environment management can be used in construction phase. For this, we went ahead with the research by studying the existing research related to environment-friendly construction project management both at home and abroad, investigation and analysis of environment-related laws and ordinances, and drawing the checklists for natural environment and living environment at the construction phase. As a result, we were able to compile a checklist for nine items including geological features, animals and plants, use of soil, quality of air, water, and soil, construction wastes, noise, vibration, recreation, and sceneries. The checklist is structured in 4 grades and coded so as to allow it to be developed with the use of computer system in future. We hope that the checklist presented in this study will help lead the managers at the construction phase in construction development sustainable from the perspective of environmental conservation.

  • PDF

공공건설사업 시공 전 단계 사업비관리 개선에 관한 연구 (A Study on Cost Management at the Pre-construction Phase in the Korean Construction Market)

  • 김민기;신성훈;현창택
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.265-270
    • /
    • 2002
  • 국내 건설사업은 잘못된 관행, 졸속한 사업추진, 사전조사의 미흡 등으로 인하여 불필요한 사업을 추진하거나 잦은 설계변경을 함으로써 예산 낭비를 초래해 왔다. 1999년 건교부에서 '원가절감을 위한 공공건설효율화종합대책'을 발표한 이후 많은 정책적인 노력이 있었음에도 결구하고 사업비에 크게 영향을 미치는 시공 전 단계의 사업비관리 부문은 여전히 취약하다는 지적이다. 발주자 측면에서 적정공사비를 반영한 사업비가 산정되지 않고 건설사업이 단계별로 추진되는 과정에서 이를 고수하기 위한 관리도 수행되지 못하고 있다. 따라서, 본 연구에서는 선진 사업비관리 체계에 대해 조사하여 시사점을 도출하고, 국내의 실제 프로젝트 및 관련 제도에 있어 시공 전 단계 사업비관리의 문제점 및 현황을 사업비관리(Cost Management)의 관점에서 분석하여, 국내 사업비관리의 개선방안에 대해 제안하고자 한다.

  • PDF

시공단계에서의 BIM 활용성 증대를 위한 품질관리 방안 (Quality Management for Utilizing BIM in Construction Phase)

  • 권오철;조주원;조찬원
    • 한국CDE학회논문집
    • /
    • 제18권5호
    • /
    • pp.338-347
    • /
    • 2013
  • Since it is common that design BIM data created by designers and engineers do not afford to consider constructability for the site, it is usually necessary to optimize the design BIM data to construction BIM data. While this optimization process requires various design updates depending on the construction methods and requirements, most designers in the projects do not participate the construction phase, which can arise another obstacle factor in utilizing construction BIM. In order to prevent this issue, we need cooperation system, where all the parties work together from the initial stage of project to create quality assured BIM model. However this kind of system is not realistic in Korea with most of the working processes being conventional yet. Therefore, at this point of time, it is realistic for us to secure basic construction qualities in the design phase and keep those qualities by the construction phase. This study suggested a relevant quality management plan for BIM usage in construction phase.

Framework for Estimating Appropriate Construction Duration of CFRD in the Planning Phase

  • Kim, In Kyum;Kim, Kyong Ju;Yun, Won Gun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.604-605
    • /
    • 2015
  • To secure quality of dam construction needs appropriate construction duration. Tight construction schedule may have negative influence on infrastructure quality, work safety and maintenance cost. It is necessary to reflect proper construction duration in the planning phase. There have been standards for estimating construction duration of building and industrial complex development but dam construction have not. In order to estimate construction duration of CFRD, feasible study reports and design reports were analyzed to acquire available information. After that, considering on construction duration methods such as comparison with similar cases, approximate estimating formula, approximate quantity assumption were adapted to Critical Path items. Hence, this study present framework for construction duration estimating of CFRD in the planning phase. This framework can be applied other types of dam along the same line.

  • PDF

비용구조분석에 의한 건축단계별 공사비용 절감방법 (The Cost Saving Method on Each Building Phase by Analyzing the Cost Structure)

  • 박근준
    • 한국건축시공학회지
    • /
    • 제5권1호
    • /
    • pp.97-103
    • /
    • 2005
  • Building costs means capital costs which include cost of land, costs of acquiring and preparing the site, construction costs, professional fees, furnishings, cost of financing the project. and cost of management required to run and maintenance the building for use. There are several phases that determine the building costs : design phase, construction phase, and operation & maintenance phase. So, the cost of work could be set against the examining the full range of complexities that a building program might contain. To solve this problem, it needs to compute building cost systematically. This is still in the development stage, awaiting the organization of rational cost data base. The method of cost saving by cost control could be constituted by detailed knowledge of building costs for all possible combinations of components and subsystems that can be assembled into integration model of cost factor on each phase of project development. The model of cost saving in each building phase is available for procedures of cost control of building systems.

Competency Level Evaluation for Construction Management in Southeast Asian Countries

  • Kwon, Nahyun;Park, Moonseo;Lee, Hyun-Soo;Son, Bo-Sik;Kim, Junyoung;Kwon, Byung-Gi
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.146-152
    • /
    • 2017
  • Recently, countries in the South-east Asia are making efforts to enhance the construction industry system and introduce the construction management system. However, it is challenging to apply construction management in site due to lack of technology and professionals for CM. This can result in frequent safety accidents, cost overrun, schedule delay, etc. Therefore, it is necessary to carry out a clear evaluation of the overall situation regarding the level of technology and required competency. The objective of this research is to investigate on which management skills and items for CM are required to improve the construction management skills in South-east Asian construction industry. As a result of the questionnaire, most of the officials selected that the design phase and the construction phase are important works, and the engineers evaluated activities during the bidding phase, the design phase and the construction phase as important works for construction management. However, in most of the results, it was observed that the current competency of Vietnam construction is insufficient compared to the evaluated importance of the skills. This can be explained by the fact that they are not capable of managing construction projects effectively as compared to the importance. The results can help to realize the inadequate aspects of local construction industry, which will be the basis of improvements. Also, it is expected to be supportive to improve construction management in the countries and also provide indicators related to work stage or technology that should be acknowledged when establishing the advancing strategy for Southeast Asian countries in the future.

  • PDF

녹색건축인증을 위한 설계단계 건설사업관리자의 세부 업무(역할)별 중요도 분석 (Analysis of the Importance from Detailed Work (Role) of the Construction Manager for G-SEED Certification in the Design Phase)

  • 이두환;강성미
    • 한국건설관리학회논문집
    • /
    • 제21권6호
    • /
    • pp.103-112
    • /
    • 2020
  • 본 연구에서는 실제 업무수행 사례를 바탕으로 친환경 관련 건설사업관리 업무관리방안을 주요 단계별로 도출하였다. 이에 따라 녹색건축인증을 중심으로 심의단계, 인/허가단계, 실시설계단계의 운영 및 관리 프로세스에 대한 건설사업관리 업무 세부 내용의 중요도를 분석하였다. 또한, 녹색건축인증 공사비 분석에 대한 선행 연구 사례를 통해 추가되는 공사비와 획득 점수 비중을 근거로 주요 항목을 도출하였으며, 녹색건축인증의 주요 항목에 대한 건설사업관리 업무 세부 내용의 중요도를 분석하였다. 그 결과, 심의단계에서는 행정적인 요구사항을 만족시키기 위해 녹색건축인증과 관련한 반영 요소의 확인, 인/허가단계에서는 설계도서 적정성, 각 단계별 설계의 연계성, 실시설계단계에서는 시공단계와 직접적으로 연관된 사항들에 대한 검토 및 확인이 중요한 것으로 나타났다. 그리고 녹색건축인증의 주요 항목에 대해서는 설계도서에 관련 기술의 철저한 반영, 적정성 검토 및 확인이 중요한 것으로 나타났다. 본 연구의 결과는 기존의 설계단계 건설사업관리자 업무(역할) 세부 내용을 토대로 녹색건축인증의 운영/관리 프로세스와 주요 항목의 측면에서 효율적인 관리방안으로 활용될 수 있을 것으로 기대한다.