Quality Management for Utilizing BIM in Construction Phase

시공단계에서의 BIM 활용성 증대를 위한 품질관리 방안

  • Received : 2013.04.24
  • Accepted : 2013.07.19
  • Published : 2013.10.01

Abstract

Since it is common that design BIM data created by designers and engineers do not afford to consider constructability for the site, it is usually necessary to optimize the design BIM data to construction BIM data. While this optimization process requires various design updates depending on the construction methods and requirements, most designers in the projects do not participate the construction phase, which can arise another obstacle factor in utilizing construction BIM. In order to prevent this issue, we need cooperation system, where all the parties work together from the initial stage of project to create quality assured BIM model. However this kind of system is not realistic in Korea with most of the working processes being conventional yet. Therefore, at this point of time, it is realistic for us to secure basic construction qualities in the design phase and keep those qualities by the construction phase. This study suggested a relevant quality management plan for BIM usage in construction phase.

Keywords

References

  1. AIA California Council Partner, 2007, Integrated Project Delivery: A Guide.
  2. Kim, S.H., Park, K.H., Park, W.H. and Paek, J.H., 2007, Building Information Modeling for Construction Management, Proceedings of Architectural Institute of Korea, 27(1), pp.785-788.
  3. Kim, H.S., 2010, Revealing Issues and Prospects of Domestic Construction by Analysis of BIM Case Studies: Building Information Modeling, Review Architecture and Building Science, 54(1), pp.65-69.
  4. Kim, J.S., Yoo, S.K., Kim, J.H. and Kim, J.J., 2011, A Study on Obstacle Reasons of BIM in Construction Phase, Proceedings of the Korea Institute of Building Constructions, 11(2), pp.61-62. https://doi.org/10.5345/JKIC.2011.02.1.061
  5. Park, H.T., 2009, Improving Constructability Analysis of Construction Projects using Building Information Modeling, Master Degree Thesis, Chung-Ang University.
  6. Kim, H.S., 2011, Study on BIM Application in Consideration of Construction Phase, Master Degree Thesis, HongIk University.
  7. Kymmell, 2008, "Building Information Modeling", McGraw-Hill Construction.
  8. Park, K.H., 2011, Study on the Effect of Pre- Detecting Errors Using BIM in the Pre-construction Phase, Ph.D. Thesis, Yonsei University.
  9. www.solibri.com