• Title/Summary/Keyword: Construction Noise & Vibration

Search Result 582, Processing Time 0.026 seconds

A Psychological-acoustic Study on the Evalution Factors of Construction Noise Quality (건설소음의 음질평가요인에 관한 음향심리 연구)

  • Cho, Won-Hee;Yang, Man-Woo;Kwak, Kwang-Soo;Kim, Jae-Soo;Han, Myoung-Ho
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2000.06a
    • /
    • pp.966-971
    • /
    • 2000
  • For the accurate evaluations of influence of construction noise, it is necessary to investigate not only physical characteristics of construction noise but also the subjective psycho-acoustical respects of individual persons. To develope the effective evaluation procedures for construction noise, we investigated Korean vocabularies which can express the feelings for construction noise, and analyzed psychological factors influencing on the subjective feelings of persons, through a series of psycho-acoustical experiments to construction noise. As a result of, it was found that the construction noise sources including the six factors. And this study intends to get the basic data for the evaluations about construction noise.

  • PDF

An Experimental Study on the Characteristics of Attenuation and Propagation of Pilings Noise by SIP Method in Construction Field (SIP공법에 의한 항타소음의 전달 및 감쇠특성에 관한 실험적 연구)

  • 이병윤;김병주;박재영;김재수
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 1997.10a
    • /
    • pp.227-236
    • /
    • 1997
  • Construction equipment noise has caused much annoyance for a number of dwellers in nearby construction field and has become a very serious issue in our living environment. Therefore, in our country, a practical solution and a better method of reducing construction equipment noise are highly required in construction field. Practical solutions for the construction equipment noise, however, are very difficult because the poorness of basic data and insufficiency of the existing research. Especially, in order to establishment of sound insulation plan about pilings work noise that has highly sound pressure level and impactive, a real situation of sound characteristics about pilings work noise in foundation work demands close investigation. In this point, this study attempts to surveys the characteristics of attenuation and propagation of construction equipment noise in pilings work using SIP(soilcement injected precast pile) method. And this study intends to get the basic data for establishment of a standard about construction noise.

  • PDF

Site mitigation plan for Different types of Construction noises (건설공사장 이동식 방음시설물의 음향특성)

  • Lee, Sung Chan;Chung, Jin Yun;Im, Jung Bin
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2014.10a
    • /
    • pp.490-494
    • /
    • 2014
  • There are a lot of different types of noise from construction site and it depends on construction stage, equipment type and number of operating equipments. The problem is almost noise from construction site is high level and some kinds of noise levels are over 100dB. In addition, if construction site is located in downtown, there are a few options to reduce noise level. Therefore several site mitigation plans are developed to reduce different types of construction noises and it is applied in site and evaluated noise reduction performance in this study.

  • PDF

A State of the Art on a Noise & Vibration - Free PHC Screw Pile Method (무소음.무진동 스크류 PHC 말뚝공법에 관한 기술적 수준 고찰)

  • Ha, Young-Min;Jung, Ho-Young;Kim, Young-Pil;Kim, Sung-Su;Choi, Yong-Kyu
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.496-506
    • /
    • 2009
  • Various the low noise & vibration pile methods were developed and used in many construction sites. Low noise & vibration pile methods must be used essentially from the sites where popular complints would be expected. In this paper, low noise & vibration pile methods and screw pile methods were investigated, noise & vibration-free screw PHC pile method, also, was studied and its constructibility and applicability were analyzed.

  • PDF

A Study on the Excavation Method Near Fish Farms and Livestock (양만장 및 가축사육시설 인접지역 암굴착공법 검토에 관한 연구)

  • Lim, Dae-Kyu;Shin, Young-Cheol;Jun, Yang-Bae
    • Explosives and Blasting
    • /
    • v.31 no.1
    • /
    • pp.23-32
    • /
    • 2013
  • Construction vibration such as explosive blast, hydraulic breaker, vibratory roller, pile driving noise and so on, injuries in areas around the construction sites. In particular, underwater sound caused by ground vibration is propagation such as structure borne noise. Vibration and underwater sound due to construction activities may cause injury to river, sea or land fish farms near construction sites. The purpose of present study is to measure the sound pressure level and frequency analysis of the underwater noise generated by ground vibration(Blasting, hydraulic crawler drill, hydraulic breaker, vibratory roller). Underwater noise were monitoring by a hydrophone (TC 4013) and recorded, analysis were made using a by software (Prosig).

Development of the Simple Prediction Program to Prevent Construction Noise in Site (건설소음 예방을 위한 현장용 간이 합성소음 예측프로그램 개발)

  • Bang, Jong-Dae;Song, Hee-Soo;Gyeong, Tae-Ug;Lim, Byung-Gun
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2005.11a
    • /
    • pp.59-65
    • /
    • 2005
  • The research is an objective which prevents a construction noise by developing prediction program on utility, helps comprehension of construction noise by case study. The program developed with Visual Basic of the Excel Logic. The standard noise is a data with report of the construction machine (National Institute of Environmental Research), construction noise of sound pressure level applied the distance decrease of the point source. The decrease effect of the barrier noise wall used the data of 5, 10, 15, 20dB where the diffraction is reflected. used a program, case study is suggested Prevention method to prevent noise of construction site.

  • PDF

A Case Study of Dispute Mediations on Construction Noise and Vibration Damages for Environmental Dispute Mediation (환경조정분쟁에 의한 건설소음.진동 피해분쟁조정 사례분석)

  • Jung, Eun-Jung;Kim, Jae-Soo
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2007.11a
    • /
    • pp.258-262
    • /
    • 2007
  • Recently people have come to demand more pleasant environments as the quality and right of life have been improved. Along with industrial development, the tendency is causing a growing number of disputes concerning environmental damages. Of many kind of environmental damages, noise and vibration pollution rising at construction fields are particularly the most common subjects of public grievance. Thus the government launched the Environments Dispute Mediation Committee in 1991, purposing to utilize fully the promptness and expertise of administrative institutes and to resolve environmental damage disputes promptly and fairly by interfering in them actively. With the prompt and fair dispute mediations of the committee, people came to be able to get fair and prompt remedies for damages in their health and fortune by environmental pollution. Therefore, by analyzing dispute mediation cases on construction noise and vibration damages, we will suggests basic material on which efficient actions can be takes for public grievances happening in the future.

  • PDF

Estimating of Optimal Allowed Distance for Reducing Vibration and Noise Problems by Pile Driving after Drilling Method in Deep Foundation Work (천공 후 말뚝타격공법의 진동 $\cdot$ 소음 문제 해소를 위한 적정 이격거리 산정 방안 연구)

  • Park Hong-Tae;Kang Lee-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.152-163
    • /
    • 2005
  • Pile driving work causes a vibration problem in the construction site using pile foundation and often causes civil affairs by construction noise around the construction site. For the vibration and noise problems, the driving after drilling method rather than the direct driving method is being generalized for reducing vibration and noise. However, this method also causes civil affairs when the driving work is operated in adjacent area. This study suggests a criterion for evaluating an optimal allowed distance for pile driving work by the driving after drilling method. Actual surveys of vibration and noise for pile driving work in seven construction sites were used for developing regression analysis equations. The results can be a standard to estimate the allowed distance to avoid vibration and noise problems in pile driving work for deep foundation.

The properties of noise and vibration in Whirlpool bath and plan for its reduction (공동주택 월풀욕조의 소음진동 특성 및 저감 방안)

  • Bae, Sang-Hwan;Lee, Byung-Kwon
    • Proceedings of the SAREK Conference
    • /
    • 2005.11a
    • /
    • pp.506-510
    • /
    • 2005
  • This study shows work on the properties of noise and vibration in Whirlpool bath and plan for its reduction. Totally through 3 steps. we found out the properties of noise and vibration. various anti-vibration design for an effeciency test is conducted. By Anti-vibration for the pump causing vibration, about 4dB(A) was reduced. Moreover. by anti-vibration construction fixing the bathtub frame. about 3db(A) could be reduced. In the case of anti-vibration construction about the wall around the bathtub. and spreading damping paint on the bathtub. the noise was reduced.

  • PDF

A Case Study of Dispute Mediations on Construction Noise and Vibration Damages (건설소음진동 피해분쟁조정 사례분석에 관한 연구)

  • 곽광수;김재수
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2001.11a
    • /
    • pp.108-113
    • /
    • 2001
  • Recently people have come to demand more pleasant environments as the quality and right of life have been improved. Along with industrial development, the tendency is causing a growing number of disputes concerning environmental damages. Of many kinds of environmental damages, noise and vibration pollution rising at construction fields are particularly the most common subjects of public grievance. Thus the government launched the Environmental Dispute Mediation Committee in 1991, purposing to utilize fully the promptness and expertise of administrative institutes and to resolve environmental damage disputes promptly and fairly by interfering in them actively. With the prompt and fair dispute mediations of the committee, people came to be able to get fair and prompt remedies for damages in their health and fortune by environmental pollution. Therefore, by analyzing dispute mediation cases on construction noise and vibration damages, we will suggest basic material on which efficient actions can be taken for public grievances happening in the future.

  • PDF