• Title/Summary/Keyword: Construction Material Information

Search Result 408, Processing Time 0.026 seconds

A Case Study On the Construction B2B e-Marketplace (건설 B2B e-Marketplace 사례연구)

  • Choi, Jae-Hwa;Lee, Yoon-Ho
    • Information Systems Review
    • /
    • v.6 no.1
    • /
    • pp.141-153
    • /
    • 2004
  • As $40%{\sim}60%$ of the construction project expense is used for the purchase and procurement of construction materials, construction companies are attracted by the promise of online procurement of construction materials through the B2B e-Marketplace. B2B e-Marketplace can save construction companies time and money spent through the off-line procurement. Construction B2B e-Marketplaces can energize the construction market dominated by major construction companies. It will expand the business scope of small and medium construction material suppliers and construction companies. Current B2B e-Marketplaces underperform in all industries due to low participation. Excluding some construction B2B e-Marketplaces led by major construction companies, most construction B2B e-Marketplaces show poor performance in terms of revenue and transaction. Researches are needed in the area of discovering the problems of current construction B2B e-Marketplace and identifying the factors for participating in the construction B2B e-Marketplace. This research conducts a case study to analyze the current status of construction B2B e-Marketplace.

A Study on Building Method of the Construction Industry Thesaurus Using Facet Analysis Method (패싯 분석 기법을 활용한 건설 시소러스 구축 방안에 관한 연구)

  • Hong, Ki-Churl
    • Journal of Korean Library and Information Science Society
    • /
    • v.48 no.1
    • /
    • pp.345-371
    • /
    • 2017
  • Traditionally, the construction industry field is one of the typical fields using facet analysis method. Internationally the facet analysis method is applied to the classification scheme "Uniclass" or thesaurus "Construction Industry Thesaurus(CIT)". In the case of Korea, the facet analysis method is being used in classification scheme "Construction Industry Classification System" but it is difficult to find studies on facet analysis method in thesaurus or building case study. This study aims to establish facet types by introducing building of thesaurus for information retrieval in construction field using facet analysis method and to suggest building plan of thesaurus in construction field using facet analysis method. In this paper, We establish the 11 top facets(agent/patient, artifacts, abstract, material, parts/component, works, attribute, media, process, space, time) and the 13 subfacet as rudimental facets and suggest building plan according to thesaurus building procedure which is suggested by International Standard(ISO 25964-1). The result of this study is expected to apply to facet based thesaurus. And it is also expected to reuse in Taxonomy or Ontology etc. and to use in interoperability with the classification scheme of Construction filed.

Estimation Model for Approximate Construction Quantities of Suspension Bridge in Early Stage (사업기획단계에서의 현수교의 물량추정을 위한 모델연구)

  • Park, Weon-Tae;Chun, Kyoung-Sik
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.6 no.4
    • /
    • pp.24-29
    • /
    • 2015
  • Bridge construction cost estimates have generally been conducted by using historial unit-price(per meter or square meter). The traditional estimating method based on unit-price references can never completely reflect the specialty of cable supported bridge. In this paper, we have developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous suspension bridge with 2-pylons. First of all, we'd analyzed the design information (such as structural design report, blueprint and quantity) and the real cost data from the existing suspension bridges and derived the design variables of the bridges. We developed the BIM wizard that generates a suspension bridge model parametrically based on derived design variables. The principle material quantities of suspension bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. We have established the system that the construction cost can be estimated more specific than the traditional estimating method.

Analysis of Standard Construction by TBM Diameter through the Rock Scenario Models in the Field (현장 암반 시나리오 모델을 통한 TBM 구경별 표준 공사기간 분석)

  • Park, Hong Taea;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.2
    • /
    • pp.195-205
    • /
    • 2013
  • Construction Management means a comprehensive plan of given the resources and the operation of the elements to complete the construction within the construction period. The construction period of these shall be determined by calculation based on reliable initial business. However, in actual field, inaccurate task duration is determined to the intuitive judgments of representative, reference of a similar project construction period of the past. As previous studies for the improvement of existing methods, This study presented a standard model that can be utilized in the early stages of construction projects for the TBM method operating by diameter (2.6m, 3.0m, 3.5m, 5.0m, 8.0m), and This study presented and calculated construction period which can estimated quickly the entire outline the construction period Therefore, When performing TBM construction work in the future, the total construction period which presented and analyze by TBM diameter, can be used as a useful material which plan and manage construction contracts, construction estimating, construction planning to the basic planning stage, and the basic design stage.

Study of a Online Survey System for Monitering of Construction Cost on Construction Site (건설현장 시장가격 모니터링을 위한 온라인 상시조사에 관한 기초연구)

  • Lee, Ju-hyun;Baek, Seung Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.202-203
    • /
    • 2020
  • Unlike price calculation by cost accounting, which categorizes costs into material costs, labor costs, and miscellaneous expenses to determine the construction budget price, construction cost calculation based on Construction Standard Unit Prices utilizes unit prices extracted from market prices of items from projects already completed to estimate costs of similar construction projects. Although unit price information is collected through construction site surveys to revise these construction standard unit prices every year, but due to the limitations of the site survey method, it is difficult to quickly implement the rapid changes in the construction methods and market prices. As such, an important issue that arose was the identification of work items whose prices need urgent revision. This study conducted research on factors that need to be considered when developing online survey system for monitoring construction site market prices. This study is expected to enhance convenience for users, and provide an efficient data collection and management system for administrators.

  • PDF

Risk Analysis using Construction Insurance Claim Payouts (건설공사보험 피해 보상금 지급액을 활용한 리스크 분석)

  • Yu, Yeong-Jin;Son, Kiyoung;Kim, Ji-Myong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.4
    • /
    • pp.349-357
    • /
    • 2016
  • Recently, the quantity of risk in construction project has been inflated due to the fact that current construction projects have been large and complicated. Therefore, a study on the risk management methods is necessary that can predict and respond to the need in complicated modern construction projects. In this study, the objective is to analyze the cause of accident in actual construction sites and develop a risk assessment model based on insurance claims records. To reach the goal of this study, first, the frequency and severity of accidents are analyzed the causes of accidents based on the classification; progress rate, season, and total construction costs. Second, a risk assessment model is developed by utilizing a multiple regression analysis. The dependent variable is loss ratio of material damage and three categories; natural hazards, geographic information, and construction method & ability, are used as the independent variables. The model's adjusted R-square is 0.455. The contributions of this study will be used as a material for a quantitative risk analysis model development and review of the construction risk factors for future study.

3D BIM Modeling of Temporary Structure for Earthwork using Parametric Technique (파라메트릭 기술을 이용한 토공용 임시 구조물의 3D BIM 모델링)

  • Tanoli, Waqas Arshad;Raza, Hassnain;Lee, Seung-Soo;Park, Sang-Il;Seo, Jong-won
    • Journal of KIBIM
    • /
    • v.8 no.2
    • /
    • pp.1-9
    • /
    • 2018
  • Nowadays Building Information Modeling (BIM) is a significant source of sharing project information in the construction industry. This method of sharing the information enhances the project understanding among stakeholders. Modeling of information using BIM is becoming an essential part of many construction projects around the globe. Despite rapid adoption of BIM in construction industry still, some sectors of the industry like earthwork have not yet reaped its full benefits. BIM has brought a paradigm shift through identification and integration of the roles and responsibilities of project participants on a single platform. BIM is a 3D model-based process which provides the insight into the efficient project planning and design. The 3D modeling can also be used significantly for the design of temporary structures in an earthwork project. This paper presents the quantity take-off methodology and parametric modeling technique for creating the temporary structures using 3D BIM process. A case study is conducted to implement the proposed temporary structure family design on a real site project. The study presented is beneficial for the earthwork project stakeholders to extract the relevant information using 3D BIM models in a project. It provides an opportunity to calculate the quantity of material required for a project accurately.

A Construction Supply Chain Management Process with RFID/WSN-based Logistics Equipment

  • Shin, Tae-Hong;Yoon, Su-Won;Chin, Sangyoon
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.4
    • /
    • pp.11-19
    • /
    • 2012
  • Construction supply chain management (CSCM) has become one of the critical factors that determine the success of a construction project as it becomes increasingly complicated and mega-sized. Particularly for high-rise or mega-sized building construction, just-in-time supply chain management is required due to lack of storage space and effective logistics for construction components and materials at a construction site. Despite the fact that research and development of radio frequency identification (RFID) and wireless sensor network (WSN) technology have been performed, construction project managers still need to carry mobile devices and check material and component flow at each stage of the supply chain process. This research proposes that the equipment used in the construction supply chain process, such as movers, trailers, gates, and hoists, can become main actors in the supply chain process using RFID and WSN technologies. And the proposed equipment and process focused on a solution to the redundancy identification problem, which has been observed in operations that use RFID/WSN-based processes for construction logistics. This paper also presents issues identified through verification and validation of the research results and proposes further studies.

A Development of the Knowledge-Based CAD Interface Systems in Offshore Industry-The Interface Between Material Control System and CAD System (해양구조물산업에서의 지식기반 CAD 인터페이스 시스템 구축-자재관리시스템과 CAD시스템 간의 인터페이스)

  • Hwang, Sung-Ryoung;Kim, Jae-Gyun;Jung, Kui-Hun;Yang, Young-Tae
    • IE interfaces
    • /
    • v.12 no.2
    • /
    • pp.319-328
    • /
    • 1999
  • Today, offshore design field is concerned with system integration such as CIM(Computer Integrated Manufacturing), PDMS(Product Data Management System) and EDMS(Engineering Data Management System) in order to cope with the change of engineering specification as owner's requirements during construction stage of the project. This paper deals with the case study that describes about the efficient interface between material control system and 3D CAD system to support the design process in offshore industry using design rules involved the designer's knowledge. In this paper, we constructed an information system, called knowledge-based CAD interface systems, which is composed material code management system and 3D specification generator which automatically creates 3D catalogue anti specification by linking the material code, called short code, and the specification components of the 3D CAD system. As a result of the construction, it is possible to maintain consistency of the design process, and through reduction of the design processing time and improvement of the design process, competitiveness is improved.

  • PDF

A Basic Study on BIM Library Business Model based on Building Material Information System (건축 자재 정보 시스템기반 BIM 라이브러리 비즈니스 모델에 관한 기초 연구)

  • Lee, Goon-Jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.4
    • /
    • pp.43-49
    • /
    • 2017
  • In recent years, the use of BIM in domestic construction has been increasing, but it is used mainly for internal and external visualization rather than for BIM design including drawings. For this reason, several studies have highlighted the lack of libraries and economic problems for BIM design. In other words, for the most economically small domestic design offices, activating the BIM design is a negative factor because it is difficult to invest the necessary manpower and cost to produce and use the required BIM library. The BIM design can be more applicable if the library can be supplied economically, easily, and quickly. In this study, BIM library business model and consideration factors that can provide BIM library service economically, easily, and quickly by considering the existing building material selection task and BIM library are presented. The proposed business model will increase the number of suppliers of BIM libraries, which are lacking in Korea, and will enable an effective BIM design at low cost and effort. If a service that reflects the business model proposed in this study is made, an integrated database that can consistently share information in the design, construction, and maintenance stages will be constructed. This can monitor the changes in material and equipment information during the life cycle of the building. The database can be used to monitor any changes in material and equipment information throughout the life cycle of a building, so that it can be used as historical data for effective design and maintenance as well as for material and equipment upgrades.