USING PROCESS MAPPING IN CONSTRUCTION PROCESS TO REDUCE CHANGE ORDERS

  • Sang-Hoon Lee;Carolina Fuzetti;Lingguang Song;Kyungrai Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.616-621
    • /
    • 2009
  • Change orders represent one of the largest sources of cost growth on construction projects, but an efficient change management control system can help the projects steer clear of the constant construction changes. This study was performed to achieve a better understanding of all changes and to develop a new set of Best Practices using process mapping techniques. The project data for this research were collected from case studies of aviation projects implemented in Houston, Texas at Bush Intercontinental Airport. The findings and contributions of this research should help owners and project managers determine and identify major causes that impact project budget and schedule and implement solutions prior to them surfacing.

  • PDF

Measuring the Impact of Change Orders on Project Performances by Building Type

  • Juarez, Marcus;Kim, Joseph J.
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.179-187
    • /
    • 2022
  • The project performances can be measured in terms of meeting the project schedule, budget, and conformance to functional and technical specifications. Numerous studies have been conducted to examine the causes and effects of change orders for both vertical and horizontal construction, respectively. However, these studies mainly focus on a single project type, so this paper examines the impact of change order for cost growth and schedule overruns using four different building types to close the gap in the change order research area. A total of 211 building projects are collected from four building types: healthcare, residential, office, and education. Statistical analyses using ANOVA tests and linear regression models are used to examine the created metric $CO/day on the cost and schedule impacts. The results found that mean $CO/day values were not statistically different among building types, and that the sum of change orders is a statistically significant predictor of $CO/day. The results will help project stakeholders mitigate the negative change orders effects can be a challenge for project managers and researchers alike.

  • PDF

Small Unmanned Aerial System (SUAS) for Automating Concrete Crack Monitoring: Initial Development

  • Kang, Julian;Lho, B.C.;Kim, J.W.;Nam, S.H.
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.310-312
    • /
    • 2015
  • Small Unmanned Aerial Systems (SUAS) have been gaining a special attention in the U.S. recently because it is capable of getting aerial footages conveniently and cost effectively, but also because of its potential threat to the safety of our society. Regarding the benefits, one can easily find successful cases. For example, remote controlled or pre-programmed unmanned aircraft help ranch owners monitor their livestocks or crop harvesting status cost-effectively without having to hire human pilots. The professionals in the construction industry also acknowledge the benefits they could gain from using SUAS. Some firms already use a small unmanned aircraft for monitoring their construction activities, which may help project managers figure out construction progress, resolve disputes in real time, and make proactive decisions for quality control. However, there are many technical challenges that my hinder the use of small unmanned aircraft in the construction industry. This paper explores opportunities and challenges in using unmanned aircraft to monitor concrete cracks on the surface of containment building in the nuclear power plant.

  • PDF

DEVELOPMENT OF INFORMATION FLOW RETRIEVAL SYSTEM FOR LARGE-SCALE AND COMPLEX CONSTRUCTION PROJECTS

  • Jinho Shin;Hyun-soo Lee;Moonseo Park;Kwonsik Song
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.648-651
    • /
    • 2013
  • The information generated in large-scale and complex construction projects are transferred continuously and transformed into project products on the long span life cycle. Therefore, information flow management is related with the success of project directly. However, certain characteristics of large-scale and complex construction projects make the solving the problem more difficultly. Although several information retrieval systems support the information management system, it is not suitable to grasp information flows. Hence, we developed an information retrieval system specialized with the information flow based on a preceding research. The system consists of a relation-based database and the process information transferring relation inference application module. The system enables project managers to manage the entire project process more efficiently and each project member to work their own task being served the information flow retrieval results.

  • PDF

타워크레인을 적용한 대단지 PC공동주택의 공정계획 효용성 분석 (Effectiveness Analysis of the Construction Schedule for PC Apartment Buildings using a Tower Crane)

  • 김기호;이범식;이동건;김민준;손정락
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 가을학술발표대회논문집
    • /
    • pp.105-106
    • /
    • 2023
  • In project projects where various factors arise, the construction company's initial establishment of a reasonable process plan reduces various variables and potential risks. In order to create a densely written initial process plan, it is necessary to compare the economic feasibility of time and money by reflecting Slack time. Through this, site managers can lead a successful project based on reasonable and stable construction.

  • PDF

THE CHECKLIST FOR ENVIRONMENTAL-FRIENDLY CONSTRUCTION PROJECT MANAGEMENT IN CONSTRUCTION PHASE

  • Oh, Kyung-Taek;Jung, In-Su;Lee, Chan-Sik
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1522-1527
    • /
    • 2009
  • Construction project is necessary element for human life to upgrade the quality and convenience. However, due to its contradictory nature to the environment conservation, environmental pollution and damage, deterioration of natural scenery, noise/vibration, water quality pollution, etc. caused in the process of construction greatly affect the environment. The purpose of this study is to propose checklist for environment management can be used in construction phase. For this, we went ahead with the research by studying the existing research related to environment-friendly construction project management both at home and abroad, investigation and analysis of environment-related laws and ordinances, and drawing the checklists for natural environment and living environment at the construction phase. As a result, we were able to compile a checklist for nine items including geological features, animals and plants, use of soil, quality of air, water, and soil, construction wastes, noise, vibration, recreation, and sceneries. The checklist is structured in 4 grades and coded so as to allow it to be developed with the use of computer system in future. We hope that the checklist presented in this study will help lead the managers at the construction phase in construction development sustainable from the perspective of environmental conservation.

  • PDF

AR-based 3D Digital Map Visualization Support Technology for Field Application of Smart Construction Technology

  • Song, Jinwoo;Hong, Jungtaek;Kwon, Soonwook
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1255-1255
    • /
    • 2022
  • Recently, research on digital twins to generate digital information and manage construction in real-time using advanced technology is being conducted actively. However, in the construction industry, it is difficult to optimize and apply digital technology in real-time due to the nature of the construction industry in which information is constantly fluctuating. In addition, inaccurate information on the topography of construction projects is a major challenge for earthmoving processes. In order to ultimately improve the cost-effectiveness of construction projects, both construction quality and productivity should be addressed through efficient construction information management in large-scale earthworks projects. Therefore, in this study, a 3D digital map-based AR site management work support system for higher efficiency and accuracy of site management was proposed by using unmanned aerial vehicles (UAV) in wide earthworks construction sites to generate point cloud data, building a 3D digital map through acquisition and analysis of on-site sensor-based information, and performing the visualization with AR at the site By utilizing the 3D digital map-based AR site management work support system proposed in this study, information is able to be provided quickly to field managers to enable an intuitive understanding of field conditions and immediate work processing, thereby reducing field management sluggishness and limitations of traditional information exchange systems. It is expected to contribute to the improvement of productivity by overcoming factors that decrease productivity in the construction industry and the improvement of work efficiency at construction sites.

  • PDF

IPA를 통한 PC부재 할당 및 적재 계획 시 고려사항 분석 (Importance and Performance Analysis on Factors of PC Component Allocation and Loading Planning)

  • 장준영;조경운;구충완;이찬식;김태완
    • 한국건설관리학회논문집
    • /
    • 제22권2호
    • /
    • pp.53-62
    • /
    • 2021
  • PC 부재 할당, 적재 계획은 차량적재 공간의 활용률을 높임으로써 차량에서 발생하는 이산화탄소 배출과 에너지 사용을 줄일 수 있으며, 또한 전체 프로젝트 비용을 절감할 수 있다. 이 연구는 PC 공사 공장관리자와 현장관리자를 대상으로 PC 부재를 차량에 할당 및 적재 계획을 수립하는 데 도움을 줄 수 있는 고려사항 18개를 도출하였으며, 도출한 18개 고려사항을 활용하여 IPA분석을 수행하였다. 주요결과, PC 부재 할당계획 시 "PC 부재 운반 차량 대수", "건설현장 내의 야적장 유무" 항목에 관한 고려사항 개선이 필요한 것을 파악하였다. 또한, PC 부재 적재계획에서는 "PC 부재 방향" 항목에 관한 고려사항 개선이 필요한 것으로 나타났다. 최근 들어 다양한 PC 부재 유형의 생산으로 인해 차량에 PC 부재를 안정적으로 적재하기 어려워 PC 부재 적재계획에서 비효율적인 차량 공간 사용, 불안한 적재 형태 등의 많은 문제가 발생하고 있다. 이 연구결과를 생산관리자가 부재 할당 및 적재 계획에 반영한다면 효율적인 차량 관리로 인해 경제적인 계획을 수립할 수 있을 것으로 판단된다.

건설 안전관리자의 특성 및 프로젝트 특성이 에어컨 설치 공사의 안전 점수에 미치는 영향 (Impact of Construction Safety Managers and Project Characteristics on Air Conditioning Installation Safety Scores)

  • 엄미영;김진영;김홍조
    • 한국건축시공학회지
    • /
    • 제24권3호
    • /
    • pp.381-391
    • /
    • 2024
  • 안전관리자는 체크리스트를 기반으로 자신의 경험, 지식, 및 프로젝트의 특성을 종합하여 작업 환경의 위험을 평가한다. 이러한 방법은 안전관리자 간의 위험 인식의 차이를 가져올 수 있다. 에어컨 시공 분야에서의 산업재해가 증가하고 있음에도 불구하고, 대부분의 연구가 대규모 프로젝트에 집중되어 있어, 에어컨 시공 분야의 특수한 안전관리 요구 사항을 충족시키는 체크리스트 개발에 한계가 있다. 이에 본 연구는 에어컨 설치 공사에 종사하는 안전관리자들의 개인적 특성(연령, 전공)과 공사 관련 요소(공사 비용, 착수 시기)가 체크리스트에 따른 안전 점수에 미치는 영향을 분석하고자 한다. A사로부터 수집한 7,046건의 안전 점수 데이터의 분석 결과, 프로젝트의 착수 시기가 안전 점수에 가장 큰 영향을 미쳤으며(0.21), 안전관리자의 연령 역시 제한적으로 영향을 미치는 것으로 나타났다(0.06). 그러나, 안전관리자의 전공은 점수에 영향을 주지 않았으며, 프로젝트의 공사 비용은 안전 점수와 음의 관계(-0.1)를 보였다. 이 연구는 프로젝트의 규모와 시기를 고려한 맞춤형 안전 작업 체크리스트 개발의 필요성과 다양한 연령의 안전관리자를 균형있게 배치하는 전략의 중요성을 강조한다.

Construction Projects Productivity in West African country of Benin: Case of Ground Earthworks

  • Akogbe, Romuald Kokou;Feng, Xin;Zhou, Jing
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권2호
    • /
    • pp.16-23
    • /
    • 2015
  • In this paper, a survey related to excavation construction activities among national and international construction companies was conducted to evaluate site productivity in construction industry. To analyze the respective productivity levels of each construction company, a benchmarking measures analysis that featured calculations of the performance ratio (PR) and performance management index (PMI) was performed. As a result of these analyses, it has been found that the work performed by local companies was marked by lower productivity and that of international companies was characterized by good productivity. Further analysis of construction workforce resources P% revealed that a construction company's productivity is largely dependent on production capacity and consumption resources, which means that the retention of skilled workers and utilization of high-quality resources yields the highest level of productivity. These results suggest that for a local construction company to be competitive in the construction work market, it must retrain skilled craftspeople, foremen, engineers, and project managers, and strengthen its building capability by leveraging new equipment and technologies.