• 제목/요약/키워드: Construction Management Process

Search Result 2,547, Processing Time 0.029 seconds

Business Process Improvement of Defect Management in Apartment Housing Project (공동주택 하자관리 업무프로세스 개선)

  • Oh, Jung-Hwan;Song, Young-Woong;Choi, Yoon-Ki;Lim, Hyoung-Chul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.16-27
    • /
    • 2009
  • Recently construction companies expand position for apartment house in construction market because of house supply rate increase and its amount. In addition, because the focus of house sale market has moved to customer from supplier, the importance of defect management is being issued currently. However, current apartment defect management is not satisfied with customer's demand for the lack of business process management, management organization, information feedback, and readiness for defect in construction phase. To solve this problem, this study proposed business process management improvement model for defect management. Proposed improvement model make information feedback, defect management business quality improvement, and improper process improvement through integrating defect management and quality management. It is expected to contribute to customer's satisfaction improvement and reliance improvement for construction companies.

A Study on Standard Construction Process Management System for Prediction of Proper Construction Period of Subsea Tunnel (해저터널 적정 공사기간 예측을 위한 표준공정관리 체계 연구)

  • Bae, Keunwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.4
    • /
    • pp.36-47
    • /
    • 2017
  • As a typical domestic subsea tunnel construction the Gadeok subsea tunnel applying the method of immersed tunnel has been completed and the Boryeong-Taean subsea tunnel is under construction using NATM. The high-speed railway subsea tunnels between the Honam and Jeju are under consideration, and the feasibility of constructing subsea tunnels with Japan and China is also under consideration. However, it is difficult to provide the process plan information for the construction work such as the analysis of the feasibility of the subsea tunnel and the prediction of the proper construction period because there is no case of domestic construction for it applying the shield TBM method. Due to economic and other reasons, government organizations are reluctant to apply the shield TBM, and there is lack of data on the construction process management field using the shield TBM method. Therefore, a standard construction process management system for the subsea tunnel is needed to analyze the feasibility of the subsea tunnel and to predict the proper construction period. By presenting the standard construction process management system of subsea tunnels such as WBS, Network Diagram, and construction period calculation model, I hope to contribute technically and economically to future subsea tunnel projects.

Virtual Interactive Construction Education (VICE) using BIM Tools

  • James D. Goedert;Yong K. Cho;Mahadevan Subramaniam;Ling Xiao
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.781-787
    • /
    • 2009
  • Training and process analysis in the construction industry has not taken full advantage of new technologies such as building information modeling(BIM). The purpose of this research is to develop a framework for the virtual interactive construction education system using three dimensional technologies. The modules will simulate the construction process for a facility from start to finish using information drawn from real projects in the built environment. These modules can be used as training tools for new employees where they attempt to optimize time and cost in a virtual environment given a limited number of equipment, time and employee options. They can also be used as a process analysis tool for new construction where a number of situational variables can change leading to exposure of potential risk. These modules would be particularly useful for repetitive construction where the initial project is analyzed for optimization and risk mitigation. This paper describes the framework and shows a residential construction example using a 900 square foot wood frame single family house designed for the United States.

  • PDF

A Study on The Possibility of BIM(Building Information Modeling) Application of Construction Management (건설사업관리의 BIM(Building Information Modeling) 적용 가능성에 관한 연구)

  • Shim, Jin-Kyu;Yi, Hye-In;Kim, Jae-Jun
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.10 no.2
    • /
    • pp.49-60
    • /
    • 2010
  • The production process of construction industry is different from thing of the general manufacturing, likewise various participants make temporary teamwork for success of the project through sharing of information. But the each role of participants is individually changed to step in construction process stage and moreover it has complicated, entangled interests. The Construction Management was inducted for the effective management and operation of construction project. The Key of the Construction Management success depends on the cooperative relationship relation to major participants. The domestic construction system is difficult with many trial and errors for the frequent plan change. As the building are more bigger and complicated, Building Information Modeling is demanded design and maintenance. This evaluation was done by the trust on the system as well as Construction Management. And then it applies the BIM it analyzes the example of construcrion project.

Process Model for development of EVMS in Nuclear Power Plant Project (원전건설 성과관리시스템(EVMS) 개발을 위한 프로세스 모델 연구)

  • Kim, Yun-Myung;Won, Seo-Kyung;Shin, Il-Sub
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.58-59
    • /
    • 2014
  • EVM(Earned Value Management) is a management methodology for integrating scope, schedule and resources, and for objectively measuring project performance and progress. EVMS(Earned Value Management System) has been used for the performance measurement of R&D and construction projects in developed countries such as United States, United Kingdom and Australia. The nuclear power plant (NPP) projects in Korea have not applied EVMS. However, EVMS has come into request for overall schedule and cost risk management and performance measurement in overseas project of the nuclear power plant as a contractor. In this paper, based on the global EVMS guidelines, EVMS per unit processes have been developed for NPP projects. Moreover, using Business Process Management (BPM), it proposes an integrated process model with tasks, roles, and procedures for EVMS for NPP construction projects.

  • PDF

Research Integrated Change Process for Configuration Management of Construction Nuclear Power Plant (건설원전 형상관리를 위한 통합변경프로세스 연구)

  • Park, Youjin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.231-232
    • /
    • 2016
  • Configuration Management (CM) is a process of identifying and documenting the characteristics of a Structures, Systems and Components (SSCs), and of ensuring that changes to these characteristics are properly assessed, approved, issued, implemented and verified. There are requirement management, change control, facility configuration information management for CM activities. In order to improve safety of Nuclear Power Plant(NPP), it is necessary to manage change item systematically. Existing CM concept is focused on the NPP in operation. On the other hand, NPP under construction is difficult to efficiently manage the change because of different change process from varoius stake-holders. This research considers method of consolidation change process for NPP to ensure that approved changes are accurately reflected in the design requirements, facility configuration information, and the physical configuration.

  • PDF

INFORMATION MODEL FOR DESIGN MANAGEMENT IN ROADWAY CONSTRUCTION PROJECTS

  • Kwanhee Cho;Jongwon Seo
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1165-1170
    • /
    • 2005
  • This paper describes an information model, devised to manage roadway design information and to improve the collaboration among the multidisciplinary design teams. An analysis concerning the workflow, the rules and the functions of current roadway design was conducted. A process model based on the result of the analysis was developed by utilizing IDEF0 methodology. The process model reflects the interdependencies among multidisciplinary design disciplines and is capable of managing communication processes. This paper also discusses the design information hierarchy and the component representation schemes for systematic design information management. It is anticipated that the proposed information model would be able to improve the overall process of design of roadway construction projects by managing design information and helping the participants communicate and share information of the project effectively.

  • PDF

A STUDY ON APPLICATION OF CONSTRUCTION MANAGEMENT(CM) TO HOUSING RECONSTRUCTION/RENEWAL PROJECT IN KOREA - Focused on Application of Construction Management (CM) in Professional Management of Renewal Business(PMRB)

  • Changgyo Kim;Jaeyoul Chun
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.649-654
    • /
    • 2005
  • A new law, the Urban and Living Environment Improvement Act, was established, promulgated, and entered into by the Ministry of Construction and Transportation as of 1st July 2003. This system under this law, which improves currently executed consulting process and upgrade its level, is to execute the legal process and procedures that are necessarily required for housing reconstruction/renewal project.. This system requires to be supplemented with addition of reasonable, logical, and systemized tools of system. Through concurrent application of professional management of renewal business(PMRB), more benefit will be provided to housing renewal associations that are constituted with residences concerned for execution of CM project.

  • PDF

Application of BLE-based Beacon in Modular Construction Process (BLE 기술 기반 비콘을 활용한 모듈러 건축 현장 프로세스 제안)

  • Kim, Changjae;Kang, Namwoo;Kwon, Woobin;Kim, Harim;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.36-37
    • /
    • 2021
  • OSC(Off-Site Construction) is regarded as a faster and more economical method in the construction industry, and the attention towards the OSC is growing. In the modular construction process, which is one type of OSC, accurate identification of a module is essential. Because the installation position and the MEP(Mechanical, Electrical, and Plumbing) composition are distinct between modules, a defect in the finishing or junction area is likely to happen during the construction process. This study suggested the modular construction process by applying a beacon receiver using BLE(Bluetooth Low Energy) technology on each module. Construction quality management would be improved using the location and assembly data, particularly for a different module in modular construction.

  • PDF

Development of Web-based Process Management System for Spatial Data Construction (웹기반의 공간데이터 구축공정 관리시스템 개발)

  • Choi, Byoung-Gil;Kim, Sung-Soo;Cho, Kwang-Hee
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.14 no.3 s.37
    • /
    • pp.63-70
    • /
    • 2006
  • This study aims to development of web-based process management system for spatial data construction. For developing this system work classification of basic surveying was standardized and quality management method for spatial data was established. Production process and work classification system for basic surveying such as control point surveying using GPS, leveling, aerial photographing, digital mapping, topographic mapping, digital elevation modeling, aerial photographic DB construction and digital orthophotomap was standardized. The status of the output and quality inspection for basic surveying project were analyzed, and the elements of quality inspection and data format for the type of outputs were analyzed. Based on standardized and analyzed contents, web-based process management system was developed after database and process was designed. The process management system consisted of process management, quality control, metadata management, and system management.

  • PDF