• Title/Summary/Keyword: Construction Management Method

Search Result 2,799, Processing Time 0.026 seconds

An Empirical Study on Top Management's Leadership in Construction Quality Management Activities and Construction Quality Management Performance (최고경영자의 리더십이 건설품질경영활동과 건설품질경영성과에 관한 실증연구)

  • Cho, Jin-Ho
    • Journal of Korean Society for Quality Management
    • /
    • v.45 no.3
    • /
    • pp.403-426
    • /
    • 2017
  • Purpose:?The purpose of this study is to analyze the causal relationship between top management 's leadership and construction quality management activities that affect construction management performance based on construction quality management. Methods:?As its method, the causal relationship between the leadership of top management and the key management factors of construction quality management activities affecting management performance is analyzed by using the structural equation model. The construction companies used in the analysis sample conducted surveys on companies that are conducting ISO, KOSHA, OHSAS, DQC, and so on. Results:?It was revealed that top management's leadership has a great influence on management performance and all management factors of construction quality management activities. However, safety management does not affect the management performance of construction quality management activities. And top management's leadership on management performance are explained by the mediating effect of cost, time, quality and communication among management factors of construction quality management activities. Conclusion:?In the previous study, the quality management activities and the ISO - based integrated total quality management system (TQM) applied in the manufacturing or service industries were presented as empirical results. However, this study presents the results of different studies by presenting empirical study results by selecting time, cost, quality, safety and communication as key management factors of quality management activities of construction companies through reviewing and analyzing previous studies in construction field.

Cost Analysis of Composite Method Using Hollow-PC Column (중공 PC기둥을 적용한 복합공법의 공사비 분석)

  • Park, Byeong-Hun;Kim, Jae-Yeob
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.71-72
    • /
    • 2016
  • Most of studies on PC method aim at the structural analysis and development of PC members, and studies on the construction management aspect are insufficient. Therefore, this study tries to investigate 'hallow PC column composite method(HPC composite method)' from the viewpoint of construction management and analyze the construction cost of the composite method. On the assumption that each comparative method was applied to the zone, the difference in construction cost between the two methods was analyzed. As a result, HPC composite method increased the initial investment cost because of its factor technology, but reduced transport cost, lifting cost, and installation cost through lightweight columns. This study analyzed only the difference in construction cost of HPC composite method so that it has the limitation in evaluating its economy. Therefore, to evaluate the economy of HPC composite method, it is considered to research more the construction cost of HPC composite method.

  • PDF

A Study on the Investigation of Application in Construction Field of Strength Prediction Model using Maturity Method (적산온도를 활용한 강도예측모델의 건설생산현장 적용성 검토에 관한 연구)

  • 주지현;장종호;김재환;길배수;남재현;김무한
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2004.05a
    • /
    • pp.101-104
    • /
    • 2004
  • If predicting of compressive strength of construction in construction field at early age is possibile, rational strength management & schedule plan is possible. With method for predicting strength of concrete, many researchers have been making study of maturity method. On the other hand, nowadays rationalization of construction capacity and reduction of a term of works due to improvement of construction capacity and application of a new method of construction is gathering strength with important issue. In accordance with this present condition, construction is being progressed in winter, but proper construction mothed and countermeasure for strength management is not established in case of winter construction. Therefore to investigate application in construction field at winter of strength prediction model that developed at former study, this study aim to measure application of developed strength prediction model through manufacture of mock-up concrete according to kind of strength level at 5$^{\circ}C$.

  • PDF

Optimization for RFID Based on Construction Material Management System Using Genetic Algorithm (Genetic Algorithm을 이용한 RFID 건설 자재 관리 시스템 최적화)

  • Kim, Chang-Yoon;Kim, Hyoung-Kwn;Han, Seung-Heon;Park, Sang-Hyuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.511-514
    • /
    • 2006
  • Material Management is one of the most important task in construction projects. More than 50% of the cost in a construction project is related to material management process. Material management method using RFID(Radio Frequency Identification) is now trying to the construction field. However, there are no enough researches on effective material management in terms of how and where RFID transponder should be installed and there are no other research that which optimization method can be used for effective installation. Therefore, this paper suggest that where and how RFID transponder can be installed on the appropriate position in construction fields using Genetic Algorithm optimization method.

  • PDF

Using Real Options to value the flexibility of Engineering Management decisions in Infrastructure Projects

  • Koo, Bonsang
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.1
    • /
    • pp.10-13
    • /
    • 2013
  • Determining on a particular construction method is typically decided in the initial phases of a project. However, changing conditions during actual construction may require a different method or technology to be employed. Providing an option for project managers to change construction provides flexibility that can increase value to the overall project. This research provides the ability to modify construction methods as a real option, which allows its value to be modeled. The research also formalizes a way to integrate a binomial lattice model with the Earned Value Method's S-curve. The integrated model provides a decision support tool that planners can use to determine whether to exercise the option depending on the status metrics provided by EVM.

A CASE STUDY OF CONSTRUCTION ENGINEERING FOR CABLE SUPPORTED BRIDGE BY COLLABORATIVE SYSTEM

  • Jung-Min Nam;Sung-Ho Kim;Jae-Hong Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.586-590
    • /
    • 2011
  • This paper presents the case study of the CE by collaborative system and proposes a model of the CM group for the cable supported bridge. The cable supported bridges have a large project scale and need a high level of construction method. Therefore an advanced construction management system is required for successful completion of project. The construction management (CM) group which control design management, construction plan, subcontract, technical support and R&D is organized for the cable supported bridge project. The CM group established a collaborative system with construction site and drew an effective management of cost, process, quality, safety for each project. Furthermore, the CM group established the procedure of construction management based on the construction engineering (CE) items and performed the project management on the construction phase. Efficiency of cost reduction and site control is maximized by using a collaborative system.

  • PDF

A Study on Waste Management Method of Construction Project in Planning Stage (건설프로젝트 계획단계에서 폐기물 관리방안 연구)

  • Cho, sung;Cho, Yong;Park, Won-Ho;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.155-158
    • /
    • 2008
  • This paper shows construction management focused on waste management in construction project in planning stage Construction waste is given a great deal of weight on total waste. And it is issued in government policy. But it show the limit of problem.As a result of having referenced idea as describe above, this paper will be studied by this process. First, present condition of development waste, cases is researched in construction projects. Second, problems of development pattern and management system are investigated and checked in project cases. Third, maintenance and management method project are proposed by application of planning Stage.

  • PDF

Knowledge Structure for Cost Estimates Based on Standardized Cost Database (원가산정을 위한 표준분류체계 활용한 지식체계 개발)

  • Im, Haekyung;Kang, Namhee;Choi, Jaehyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.235-236
    • /
    • 2016
  • The importance of construction management has been increasing due to the fact that complex construction projects blend several different industries depending on the traits of the construction. This research was conducted to search for a method to enhance efficiency in cost management of construction project and meet the need for reusability of accumulated construction information. The process of detailed estimation and methodology for using standard unit price information has been developed to strengthen the interoperability in cost information by utilizing a standard classification system. The concept of ontology is proposed as a method of connecting construction information based on a standard breakdown structure to increasing the connectivity of the cost information in the construction project. Therefore, construction information knowledge framework is developed in order to improve the efficiency of the detailed estimation work process.

  • PDF

The Method Improving the Productivity of a Project through Construction Management Techniques (CM의 요소기술을 이용한 프로젝트의 생산능력향상)

  • Yoon Tae-Kwon;Chung Jai-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.05a
    • /
    • pp.133-136
    • /
    • 2005
  • This study provides the method how to improve the productivity of a project using CM's constitutive methods. Construction industry in Korea was protected by the government and they have been grown with only their construction technology until today. It results Korean Construction is behind the advanced countries in terms of Engineering fields and construction management skills. This study compares the difference between the construction system of Korea and Europe and Asia. And then, it proposes the method how to compete with the other countries. which introduce the CM technique into the construction project in the beginning stage. Hopefully, this study is recognised as the basic strategy to improve the capability of Korean construction management.

  • PDF

Management Method in the Education Facilities of the Construction Process through Value Engineering(VE) Case Study (VE 사례분석을 통한 교육시설 건축공사 단계별 관리방안)

  • Kim, Hag-Joo;Mun, Gwang-Bae;Go, Seong-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.129-132
    • /
    • 2012
  • Value Engineering(VE) process is going to make a series of improvements for the effective construction project management or optimal proposal to improve quality, performance improvement, cost reduction and customer satisfaction. For making the quality model based on better than the architecture that is required in the VE, such a project promoting creative plan, functionality and constructability reflecting the materials and improved construction methods and building life cycle for reviewing the smooth progress of the construction projects may be necessary for management techniques. This study is to establish a management plan in the educational facilities construction process through education institution's recent orders completed by VE case study.

  • PDF