• Title/Summary/Keyword: Construction Factory

Search Result 381, Processing Time 0.028 seconds

A Study on Trend of Joint Tensile Strength with Joint Hot Air Welding Speed in EVA Waterproofing Sheet (Focusing on the summer Season) (EVA방수시트의 접합부 열풍융착 시 융착속도 변화에 따른 접합 인장강도 변화 추이 연구(하절기 중심으로))

  • Kim, Sun-Do;An, Hyun-Ho;Park, Wan-Goo;Kim, Dong-Bum;Park, Jin-Sang;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.217-218
    • /
    • 2016
  • Sheet based waterproofing methods are factory produced and have a advantage or forming uniform waterproofing layer in construction sites, allowing them to become a commonly used material domestically. Particularly in the case of EVA waterproofing sheets, they can be manufacturing using recycled materials and are thus increasing in application due to their eco-friendly factors. However, heating adhesion method has to be used in case of overlapping areas of waterproofing sheets, but not enough studies have been made on the adhesion stability based on different heat adhesion speed. In this paper, EVA sheets have been studied with their overlap area properties following a heat adhesion method in wintertime ambient conditions and have been observed for the changes in the tensile strength based on different head adhesion speed and rates. According to the results, 6~7m/min adhesion speed was shown to have produce the best tensile strength.

  • PDF

A Study on the Fire Prevention of Temporary Constructions Connected with Factory Buildings (공장건물에 연결된 가설건축물 화재예방에 관한 연구)

  • 이정용;이창섭
    • Fire Science and Engineering
    • /
    • v.17 no.1
    • /
    • pp.68-75
    • /
    • 2003
  • Temporary constructions are defined as constructions for temporary use, but frequently they are used long like permanent constructions and connected with main constructions. In this case, fire hazardousness increase. But there is no way to control this hazard in our system. This study include investigation of present related law survey about sample complex, collection of related lawsuit result and estimation of hazardousness of each contemporary construction type. The conclusion is that the article that specify distance between main construction and temporary one should be created in the architectural law. Or to apply fire service law to area of temporary construction, fire service law should be changed properly.

A Study on leasing space to install solar power systems Economic Evaluation (임차공간 설치 태양광 발전시스템 경제성 평가에 관한 연구)

  • Seo, Mi-Ja;Lee, Jae-Hwan;Seo, Tae-Won;Han, Myung-Hee;Woo, Je-Teak
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.10 no.12
    • /
    • pp.1373-1380
    • /
    • 2015
  • The rapid spread and various design of solar power plants, development, construction, maintenance technology and business coexist variety and price decline and the recent solar power plants built since the early 2010 despite the decline in the power generation unit main equipment Construction of power plants to stabilize the technology has been continuously promoted. Recently, built in the form of a solar power plant to the construction and leasing the roof and upper structure to replace the limited ground space is increasing. Factory roof, studies such as warehouse and logistics center leased space in the roof installed solar plant status and skills, conducted a study to review and analyze the economy.

A Basic Study of Dynamic Simulation Model for In-situ Production and Erection of Precast Concrete Members (PC의 현장생산-설치 통합관리를 위한 동적 시뮬레이션 모델 기초연구)

  • Son, Seung-Hyun;Kim, Ki-Ho;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.42-43
    • /
    • 2019
  • In-situ production of PC (precast concrete) members can reduce costs by about 14.5% -21.6% compared to in-plant production due to the reduction of transportation costs, factory profits and overhead costs. However, in-situ production of PC members presents a variety of risks, including member production and yard area securing, and lead time for production within the installation period. To solve this, it is necessary be able to analyze and control and monitor the risk factors that influence in-situ production for PC member. The purpose of this study is to develop a dynamic simulation model for in-situ production and erection integrated management for PC members. For this study, risk factor identification, causal loop diagram, and dynamic simulation model construction were performed sequentially. The results of this study will be used as a basis for developing a risk management model for PC in-situ production.

  • PDF

Physical Propertise of Non-Cement Matrix with Red Mud (레드머드를 혼입한 무시멘트 경화체의 물리적 특성)

  • Kwon, Hyeong-Soon;Lee, Sang-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.93-94
    • /
    • 2023
  • Through the industrial revolution that began in the 18th century, the amount of carbon dioxide in the atmosphere increased rapidly as humans used fossil energy such as coal and oil as fuel for steam engines and factory machines. The amount of carbon dioxide emitted while producing cement, the main material of concrete used in construction, is large enough to account for 5-8% of the world's carbon dioxide emissions. In this study, Non cement-based matrix were used to reduce carbon dioxide emissions from cement production. Red mud is an industrial by-product generated in the manufacturing process of aluminum hydroxide using bauxite, and more than 120 million tons are produced worldwide. In addition, red mud is a porous material that can be physically adsorbed, and causes a photocatalytic reaction of TiO2 to remove harmful substances such as nitrogen oxide formaldehyde in the air and chemically adsorbs ammonia and hydrogen sulfide. Therefore, this study aims to examine the physical properties of the matrix by mixing red mud, an industrial by-product with good adsorption performance, into the Non cement-based matrix.

  • PDF

A Study on the Limits of Manufacturing Innovation and Policy Direction of SMEs in the 4th Industrial Revolution : Focusing on the Limitations and Examples of Pohang SME's Smart Factory Introduction (4차 산업혁명시대 지역 중소기업의 제조혁신 한계와 스마트공장 정책 방향성 연구: 포항지역 중소기업의 스마트공장 조사를 중심으로)

  • Kim, Eunyoung;Park, Munsu
    • Journal of Science and Technology Studies
    • /
    • v.18 no.2
    • /
    • pp.269-306
    • /
    • 2018
  • Through this study, it is aimed to derive the policy direction considering the characteristics of the present Smart Factory, the industrial condition of Pohang area, and the promotion field. Secondly, the questionnaire data of the regional enterprises will prepare for the improvement of the industrial structure and the implications for efficiency, and preparation for regional preparation and industrial changes in preparation for the next generation of production revolution. The construction of Smart Factory in Pohang can be divided into two major directions. First, it is analyzed that smart factory pilot projects are highly needed, focusing on competitive medical precision manufacturing field among the SMEs in the region, primary metal and nonmetal manufacturing industries, and other machinery fields. In addition, local SMEs are willing to introduce smart factories for reasons of quality improvement and cost reduction, and it is confirmed that they will actively promote employee training and expertise if they can upgrade continuously.

A Proposal on the Consulting Model for Efficient Construction of Material Handling Automation System : Focused on K Company's Case (물류자동화 시스템의 효율적 구축을 위한 컨설팅 방법론 제안 : K기업의 사례를 중심으로)

  • Ko, J.H.;Cho, J.H.;Oh, H.S.;Shim, S.C.;Ryu, J.H.;Lee, S.J.
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.4
    • /
    • pp.202-211
    • /
    • 2015
  • Companies build the factory automation system to improve management effectiveness and productivity as prime strategies for sustainable growth. But most companies undergo various trials and errors while carrying out the project without elaborate preparation stage for factory automation. In this study, we tried to verify what factors are critical to effectively building distribution automation system, which is a branch of factory automation system. A consulting model for setting up a Material Handling Automation System by utilizing the Stage-Gate Process, which is product development process was studied. 29 material handling automation projects carried out between the year 1990 to 2013 at K-Company were selected. Interviews with the project managers, operators and maintenance personnels, various records and current status of the projects were used as data for structural equations based on the Milan consulting model and existing researches of factory automation, CIM for material handling automation. Creating effective basis of production, material handling system and energy saving system with expert review, when preparing a material handling automation project, help promote the project planning thus contributing to the performance of the resulting system, which appears though rather weakly in our data. Also the effect of material handling automation can be enhanced through sufficient and effective links to the relevant environments such as production logistics management and automated warehouses. More detailed planning characteristics of project promotion or some time-series data of effective Material Handling Automation System could enhace furthur studies. We propose a consulting model for setting up an efficient material handling automation system.

Development of a Simulation Model for Supply Chain Management of Modular Construction based Steel Bridge (모듈러 공법 기반 강교 공급사슬 관리를 위한 시뮬레이션 모형 개발)

  • Lee, Jaeil;Jeong, Eunji;Kim, Sinam;Jeong, Keunchae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.3-15
    • /
    • 2022
  • In this study, we develop a simulation model for Supply Chain Management (SCM) of modular construction based steel bridge. To this end, first, Factory Production/Site Construction system data for the steel bridge construction were collected, and supply chain, entities, resources, processes were defined based on the collected data. After that, a steel bridge supply chain simulation model was developed by creating data, flowchart, and animation modules using Arena software. Finally, verification and validation of the model were performed by using animation check, extreme condition check, average value test, Little' s law test, and actual case value test. As a result, the developed simulation model appropriately expressed the processes and characteristics of the steel bridge supply chain without any logical errors, and provided accurate performance evaluation values for the target system. In the future, we expect that the model will faithfully play a role as a performance evaluation platform in developing management techniques for optimally operating the steel bridge supply chain.

Development of Bill of Service Framework for Modular Housing Construction (모듈러 공법의 특성을 적용한 공동주택의 내역 체계 개발)

  • Hwang, Jinsub;Choi, Sanghee;Lee, Jaeseung;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.138-146
    • /
    • 2014
  • Modular construction is one of the arising issues in the Korean construction industry due to shorter construction period and higher productivity on site. It is also expected that modular construction market would expand rapidly because of increasing demand of small houses by nuclear families and eco-friendly construction. However modular construction cases have been limited in Korea because of little demand in the market and the construction prices are even higher that the regular reinforced concrete methods. Even worse, because there is no standard bill of services exists in the industry, it may lead to the risk of construction expenses. So, the purpose of this study is focused on the development of bill of services which reflects characteristics and process of modular construction. In order to do this, the concepts and process of modular construction, WBS and CBS are analyzed. Analyses of the case studies and experts interview were executed so that proper principles for organizing bill of service of modular construction is established. Finally according to the 3 steps of modular construction, factory manufacturing, on-site modular construction and on-site general construction, the standard bill of services were suggested with the related coding system.

A study on the Composition of the Production Rates System to Prepare Standards for Calculating the Construction Cost of PC Structure Apartments Based on Off-Site Construction (OSC) (OSC 기반 PC구조 공동주택 공사비 산정기준 마련을 위한 품셈 체계 구성에 관한 연구)

  • Lee, Hansoo;Lee, Chiho;Lee, Jeongwook;Noh, Hyunseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.96-106
    • /
    • 2021
  • The PC structure based on the OSC (Off-Site Construction) is mentioned as a representative method of innovation in the construction industry that converts the existing construction environment from site-centered to factory production-transportation-site assembly. However, recent research on PC method has focused on improving the functions of subsidiary materials and improving the production system to increase productivity and institutional / policy R&D that can be universally applied to the life-cycle stage of ordering / design /construction is insufficient. In particular, the absence of standardized cost calculation standards makes it difficult to calculate and verify of objectified appropriate construction cost. So which is an obstacle to the activation of the PC method. In this study, the standards for construction costs of domestic and foreign PC method were surveyed and similar Construction Standard Production Rates were analyzed to confirm the product structure suitable for PC method. Subsequently, the construction procedures and input resources for each PC subsidiary materials were identified through on-site surveys to derive component for subsidiary materials, and the factors of change in the product according to the construction characteristics(height, weight of subsidiary material) were verified. As a result the standard product calculation system suitable for the site installation of the PC method for apartment was presented.