Browse > Article
http://dx.doi.org/10.6106/KJCEM.2022.23.2.003

Development of a Simulation Model for Supply Chain Management of Modular Construction based Steel Bridge  

Lee, Jaeil (Department of Civil Engineering, Chungbuk National University)
Jeong, Eunji (School of Civil Engineering, Chungbuk National University)
Kim, Sinam (Manufacturing Management Team, Daewoo ST)
Jeong, Keunchae (School of Civil Engineering, Chungbuk National University)
Publication Information
Korean Journal of Construction Engineering and Management / v.23, no.2, 2022 , pp. 3-15 More about this Journal
Abstract
In this study, we develop a simulation model for Supply Chain Management (SCM) of modular construction based steel bridge. To this end, first, Factory Production/Site Construction system data for the steel bridge construction were collected, and supply chain, entities, resources, processes were defined based on the collected data. After that, a steel bridge supply chain simulation model was developed by creating data, flowchart, and animation modules using Arena software. Finally, verification and validation of the model were performed by using animation check, extreme condition check, average value test, Little' s law test, and actual case value test. As a result, the developed simulation model appropriately expressed the processes and characteristics of the steel bridge supply chain without any logical errors, and provided accurate performance evaluation values for the target system. In the future, we expect that the model will faithfully play a role as a performance evaluation platform in developing management techniques for optimally operating the steel bridge supply chain.
Keywords
Simulation; Model; Arena; Steel Bridge; Supply Chain Management;
Citations & Related Records
Times Cited By KSCI : 5  (Citation Analysis)
연도 인용수 순위
1 Rockwell Automation (2020). "Arena Simulation Software (16.00.00)." USA, (Sept. 1, 2021)
2 Son, J.W. (2020). "A Study on Supply Chain Management in Off-Site Construction Projects." Proceedings of the Architectural Institute of Korea Conference, AIK, 40(2), pp. 558.
3 Jang, M.H. (2009). "Development of a Materials Management System Considering Construction Supply Chain Management." Journal of the Korea Institute of Building Construction, KIC, 9(5), pp. 87-93.   DOI
4 Kelton, W.D., Sadowski, R.P., and Zupick, N.B. (2015). "Simulation with Arena 6th edition." McGraw-Hill Education, USA
5 Kim, S., Kim, K.M., Park, C.H., and Kim, K.J. (2005). "Evaluation on WBS for Integrated Management of Steel Box Girder Production Process." Journal of the Korean Society of Civil Engineers, KSCE, 25(6D), pp. 867-875.
6 Little, J.D.C. (1961). "A Proof for the Queuing Formula:L=λ W." Operations Research, INFORMS, 9(3), pp. 383-387.   DOI
7 Kyung, K.S., Kwon, S.C., Bae, J., and Choi, H.H. (2017). "Survey and Analysis for Strengthening Competitiveness of Steel Bridge." Magazine and Journal of Korean Society of Steel Construction, KSSC, 29(6), pp. 20-30.
8 Jeong, J.Y., Kwon, W., Park, S.J., and Chun, J.Y. (2006). "A Study on Application of Lean Construction Theory in Schedule Management." Proceedings of the KICEM 2006 Conference, KICEM, pp. 515-518.
9 Kim, D.M., Lee, J.S., Kim, J.H., and Kim, J.J. (2014). "Marketing Strategy and Influential Factors based on the Attributes of Unit Modular System." Korean Journal of Construction Engineering and Management, KICEM, 15(1), pp. 78-86.   DOI
10 Moon, D.H., Nam, Y.S., and Shin, Y.W. (2016). "Effects of Additional Sub-lines and Buffer Allocation on the System Performance in an Automotive Body Shop." Journal of the Korean Society of Supply Chain Management, KSCM, 16(2), pp. 135-145.
11 Park, S.H., Kim, Y.S., and Chin, S.Y. (2003). "Implementation of Supply Chain Management in Construction Industry." Korean Journal of Construction Engineering and Management, KICEM, 4(3), pp. 85-94.
12 Sargent, R.G. (2010). "Verification and Validation of Simulation Models." Proceedings of the 2010 Winter Simulation Conference, IEEE, pp. 166-183.
13 Seong, T.R., and Park, C.H. (2019). "Review on the Steel Bridge Market and Suggestions on Its Increase" KSCE 2019 Convention, KSCE, pp. 1163-1164.
14 Yoon, S.B., Park, M.S., and Lee, H.S. (2020). "Discrete-Event Simulation for Modular Construction Manufacturing Planning." Proceedings of the Architectural Institute of Korea Conference, AIK, 40(1), pp. 419-420.
15 Jeong, S.L., Cho, K.M., and Hyun, C.T. (2010). "A Study on the Productivity Analysis of Deck Plate Installation Work in Steel Structure Construction." Journal of the Korea Institute of Building Construction, KIC, 10(1), pp. 73-79.   DOI
16 Lee, D.Y., Nam, S.H., Lee, J.S., Jung, D.I., Kim, K.R., and Cho, B.H. (2019). "Factory Production Management of Modular Units Using MFD 2019." Journal of the Architectural Institute of Korea Structure & Construction, AIK, 35(6), pp. 139-146.   DOI
17 Kim, J.S. (2001). "Simulation of Optimized Production Technology System to Verify the Supply Chain Management's Effectiveness." Journal of the Korean Society of Computer and Information, KSCI, 6(1), pp. 95-102.
18 Kim, T.Y., Park, M.S., Lee, H.S., Seo, S.W., Lee, J.H., and Kim, S.Y. (2013). "Optimization Methodology of Modular Unit Factory Production Process Using DSM." Journal of the Architectural Institute of Korea Structure & Construction, AIK, 29(6), pp. 113-122.   DOI
19 Lee, S.Y. (2013). "Eco-friendly Construction and Activation of Steel Structure." KSCE Journal of Civil and Environmental Engineering Research, KSCE, 61(2), pp. 19-21.
20 Lee, T.S., Park, E.S., and Lee, D.W. (2011). "Development of Supply Chain Management Education Programs for the Construction Industry." Journal of The Korean Society of Civil Engineers D, KSCE, 31(2), pp. 275-284.
21 Jang, J.Y., Chen, H., Lee, C.S., and Kim, T.W. (2019). "Research Trends in Off-Site Construction Management : Review of Literature at the Operation Level." Korean Journal of Construction Engineering and Management, KICEM, 20(4), pp. 114-125.   DOI
22 Ahn, S.H., Kim, S.K., and Lim, S.Y. (2017). "Development of an Equipment Operating System for Effective Earthwork Operations." Journal of the Korean Society of Civil Engineers, KSCE, 37(1), pp. 153-166.   DOI