• 제목/요약/키워드: Construction Errors

검색결과 594건 처리시간 0.027초

문화재수리표준시방서의 온돌공사 개정 제안에 관한 연구 (Proposing the Revision of Ondol Construction in the Standard Specification for Heritage Repair)

  • 임준구;김영재
    • 건축역사연구
    • /
    • 제32권5호
    • /
    • pp.43-50
    • /
    • 2023
  • Ondol is a traditional underfloor heating system designated as a national intangible cultural heritage of Korea. The Cultural Heritage Administration (CHA) publishes a standard specification for the repair of cultural properties, including ondol. This standard specification is used as a guide for contractors who repair ondol in the field. However, the standard specification for ondol repair has some errors and is difficult to understand in the field. This paper proposes a revision of the standard specification for ondol repair. This study found that the standard specification for ondol repair has some problems in terms of the terminology and structure of ondol. These problems were sufficient to confuse ondol repairers in the field. Therefore, this study proposes to revise the standard specification to correct these errors and make it easier for ondol repairers in the field to understand. This study is expected to help recognize and preserve ondol as a cultural property and not just as a building.

환자안전 관리자가 인식한 투약오류예방 시스템 구축실태에 따른 투약오류관리풍토 및 활용인식 (Medication Error Management Climate and Perception for System Use according to Construction of Medication Error Prevention System)

  • 김명수
    • 대한간호학회지
    • /
    • 제42권4호
    • /
    • pp.568-578
    • /
    • 2012
  • Purpose: The purpose of this cross-sectional study was to examine current status of IT-based medication error prevention system construction and the relationships among system construction, medication error management climate and perception for system use. Methods: The participants were 124 patient safety chief managers working for 124 hospitals with over 300 beds in Korea. The characteristics of the participants, construction status and perception of systems (electric pharmacopoeia, electric drug dosage calculation system, computer-based patient safety reporting and bar-code system) and medication error management climate were measured in this study. The data were collected between June and August 2011. Descriptive statistics, partial Pearson correlation and MANCOVA were used for data analysis. Results: Electric pharmacopoeia were constructed in 67.7% of participating hospitals, computer-based patient safety reporting systems were constructed in 50.8%, electric drug dosage calculation systems were in use in 32.3%. Bar-code systems showed up the lowest construction rate at 16.1% of Korean hospitals. Higher rates of construction of IT-based medication error prevention systems resulted in greater safety and a more positive error management climate prevailed. Conclusion: The supportive strategies for improving perception for use of IT-based systems would add to system construction, and positive error management climate would be more easily promoted.

Relationship between Stress Level and Reworks for Construction Professionals

  • Chae, Jeonghyeun;Kang, Youngcheol
    • 국제학술발표논문집
    • /
    • The 8th International Conference on Construction Engineering and Project Management
    • /
    • pp.169-178
    • /
    • 2020
  • This paper presents a study investigating the relationship between stress level and reworks for construction professionals. As employees' work-life balance (WLB) becomes more important nowadays, controlling the level of stress in the workplace becomes more important as occupational stress has negative impacts on WLB. Reworks can be one severe occupational stressor as people suffer from stress when they need to redo their works. This study hypothesizes that there is a positive correlation between reworks and level of stress, meaning that people tend to show high level of stress when they need to redo their works. The hypothesis will be tested by checking the stress level when engineers redo their works because of changes or errors. An electroencephalography (EEG) sensor will be used to measure the stress level of engineers when they redo their works. For more accurate measure of stress, the stress level will also be measured by the galvanic skin response (GSR). This experiment is expected to prove that rework process is a severe stressor for construction professionals, which will contribute to lower productivity and poorer WLB. The finding will emphasize the importance of managing reworks in the construction industry, which will eventually help construction managers to control the level of employees' stress successfully.

  • PDF

도시철도 교통량 추정의 오차발생 요인 연구 (A Study on Inaccuracy in Urban Railway Ridership Estimation)

  • 김강수;김기민
    • 대한교통학회지
    • /
    • 제32권6호
    • /
    • pp.589-599
    • /
    • 2014
  • 본 논문에서는 개통연도 예측 교통량과 개통 후의 실제 교통량의 비교를 통해 교통량 예측 오차를 분석하였다. 분석 결과, 역별 개통연도 교통량(승 하차 인원)의 평균오차(I)는 7.27수준인 것으로 분석되었다. 또한 지역별로 오차가 상이하고 공사기간이 장기간이거나 역간거리가 짧아지면 교통량 과다 추정 오차가 증가하는 것으로 분석되었다. 따라서 도시철도사업이 정해진 계획대로 정해진 기간 안에서 진행될수록 교통예측 오차를 줄일 수 있을 것으로 판단된다. 이외에도 수요예측연도가 최근일수록 오차가 줄어드는 것으로 나타났다. 향후 추진될 도시철도 신규 노선에 대해서는 지금까지의 도시철도 이용객 추정의 오차와 경향을 바탕으로 보다 정확하고 현실적인 이용객 추정이 필요하다. 본 논문의 한계점은 초기연도의 오차에 대해서만 분석하였고 오차발생 변수도 외생변수에 국한하여 분석한 점이다. 향후에는 오차발생에 대해서 다양한 변수를 대상으로 검토되어야 할 것이다.

QFD-FMEA를 이용한 해체공사의 위험평가와 근본원인의 분류 방법 (Assessing Risks and Categorizing Root Causes of Demolition Construction using the QFD-FMEA Approach)

  • 유동욱;임남기;전재열;조재호
    • 한국건축시공학회지
    • /
    • 제23권4호
    • /
    • pp.417-428
    • /
    • 2023
  • 사고 원인에 대한 철저한 분석은 사고 재발 방지를 위한 필수적인 과정이다. 해체공사 사고의 원인을 살펴보면 작업자의 불안전한 행동, 불안전한 상태, 심리적·신체적 상태, 현장관리 원인 등 매우 다양하다. 현재 해체공사 사고통계는 지속적으로 조사·보고되고 있으나 사고 유형에 따른 보다 근본적인 원인 분류 정보가 필요하다. 본 연구에서는 하인리히의 도미노 이론을 바탕으로 해체공사 사고의 유형에 따라 사고원인(불안전한 행동, 불안전한 조건)과 휴먼에러(인적요인)를 분류하였다. 본 연구에서는 해체공사시 사고유형에 따라 사고원인을 체계적으로 분류하기 위해 QFD-FMEA(Quality Function Deployment - Failure Mode Effect Analysis) 3단계 모델을 사용하였다. 사고원인 분류 결과는 사고예방을 위한 안전지식 및 체크리스트로 활용할 수 있다.

BIM 기반 견적 산출을 위한 공종별 BIM 데이터 구축 및 연계 방안 - 세종특별자치시 공동주택 경제성 평가 사례 연구 - (BIM-based cost estimation by integration with BIM mdel data and cost information - Case Study on Economy Evaluation of Apartment in Sejong Special Self-Governing city -)

  • 이해찬;김진만;최철호;송상훈
    • 한국BIM학회 논문집
    • /
    • 제7권3호
    • /
    • pp.11-20
    • /
    • 2017
  • BIM technology, which is widely used in the construction industry, has been introduced in various fields for the purpose of saving construction cost and reducing construction schedule. However, in the case of BIM-based cost estimate, there are various trials and errors in applying BIM technology which can be applied for calculating quantity and cost estimate. BIM-based cost estimate can improve the quantity accuracy and allow to easy modifications that were not expected in 2D-based construction process. However, for this purpose, it is necessary to take into consideration that interoperability between BIM data and cost information should be planed in advance. Besides, the definition of a BIM data specification is also required for the seamless data exchange and integrity in each phase of the construction process. Therefore, in this study, we propose a BIM - based cost estimation method and technology in each type of work applicable to the current domestic construction industry.

건설업 기초안전보건교육의 실태분석 및 개선에 관한 연구 (A Study on the Analysis and Improvement of the Basic Occupational Safety and Health Training for the Construction Industry)

  • 우창훈;오태근
    • 한국안전학회지
    • /
    • 제29권3호
    • /
    • pp.46-55
    • /
    • 2014
  • With regard to the basic safety and health education in construction industry issued on January, 26, 2012 by Occupation Safety And Health Acts, this study conducted a survey with self-administered questions for workers in the construction field in order to comprehend the problems since introduction of basic safety and health education. By analyzing the effectiveness of the safety and health activities, this study sought to reduce the trials and errors as well as to secure the improvement toward the early settlement of the basic safety and health education in construction industry. As a result of the question investigation, the survey respondents in the field sites who finished the basic safety and health education showed positive attitudes toward the improvement of safety awareness and the prevention of accidents. They also needed constant implementation of the education. At the same time, the government should improve the education program with strong policies to secure the effectiveness of the basic safety and health education in construction industry.

철도인프라 BIM 적용에 따른 비용편익 효과 분석 - 오송 철도종합시험선로 사례를 중심으로 - (Benefit-Cost Analysis of BIM Application - Case Study on Osong Test Line Railway -)

  • 김환용;신민호;한상천;최영우;김창호
    • 한국BIM학회 논문집
    • /
    • 제8권4호
    • /
    • pp.41-48
    • /
    • 2018
  • Recent technological improvements have made abundant changes in construction industry. In specific, some technical applications, such as Building Information Modeling (BIM) opens up many possibilities. Some studies have articulated the use of BIM and its advantages in construction, but most of them are theoretical, not practical. This study is to provide an insight to such obstacles in BIM research. By investigating a real project that could utilize BIM in planning and construction phases, the authors try to investigate a possible outline of advantages in BIM implementation. The study area was set to a railway construction site in South Korea. The site covers a multiple railway tracks, stations, telecommunication facilities, infrastructure facilities, railway structures, and so numerous. In the site, the authors have identified 12 errors in 7 projects that could be prevented if BIM was utilized before the construction.

Construction Cost Segregation Process using Building Information Modeling

  • Zhou, Rong;Li, Huimin;Zhang, Chengyi;Lv, Lelin;Tian, Junrui;Cakir, Sevilay Demirkesen
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1106-1113
    • /
    • 2022
  • Cost segregation helps reduce tax liabilities by reclassifying real property to personal property and accelerates tax depreciation of a property. A typical cost segregation study requires much time and high costs. This study proposed a BIM integrated cost segregation process that can be applied to any commercial building project. The proposed BIM-based cost segregation process was verified in a new commercial construction project. It approved that this approach can: (1) increase the cash flow for the owner and provide assistance to tax-paying enterprises; (2) enable the contractor to use it as an added value in the bidding process; (3) realize data sharing in a common platform to improve the cost segregation study efficiency and reduce costs and errors; (4) contribute to the asset management in the life cycle of buildings while filling in the blank of cost segregation process. Future studies will focus on the automation of cost segregation and asset management in building construction's life cycle.

  • PDF

공공 건축사업의 공사기간 산정 현황 분석을 통한 개선방안 (Improvement Plan Through Analysis of the Current Status of Construction Period Calculation of Public Construction Projects)

  • 이종태;윤현도
    • 한국건설관리학회논문집
    • /
    • 제22권3호
    • /
    • pp.12-20
    • /
    • 2021
  • 건설 품질 및 안전 확보, 비용분쟁 방지를 위해 최근, '적정 공사기간' 산정의 중요성이 부각되었다. 건축공사기간 산정기준 마련을 위해서는 상당량의 과거자료 분석이 필요하다. 그러나, 근로시간 단축, 품질규정 강화 및 기후조건 변화 등 건설사업 환경이 이미 변경되어 과거자료의 사용에 대해 많은 전문가들이 의문을 제기하고 있는 실정이다. 또한, 건축공사는 공사 여건에 따라 작업순서, 생산성 등이 매우 다양해 과거 통계치를 활용한 획일적인 공사기간 산정 시 오류 가능성이 상승한다. 따라서, 적극적인 '생각의 전환'을 통해 과거자료 분석 방식에서 현재생산자료 검토 방식으로 변경하는 새로운 해법을 본 연구를 통해 제시하였다. 즉, 설계단계에 '공정관리 전문가' 및 '공종별 시공전문가'를 투입하여, '적정 공사기간'을 검토·산정하는 절차를 제도화하였다.